[go: up one dir, main page]

CN101024465A - Elevator testing method and its assistant device and elevator device - Google Patents

Elevator testing method and its assistant device and elevator device Download PDF

Info

Publication number
CN101024465A
CN101024465A CN 200710004712 CN200710004712A CN101024465A CN 101024465 A CN101024465 A CN 101024465A CN 200710004712 CN200710004712 CN 200710004712 CN 200710004712 A CN200710004712 A CN 200710004712A CN 101024465 A CN101024465 A CN 101024465A
Authority
CN
China
Prior art keywords
elevator
counterweight
elevator car
guide
restoring force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200710004712
Other languages
Chinese (zh)
Other versions
CN101024465B (en
Inventor
萩谷知文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN101024465A publication Critical patent/CN101024465A/en
Application granted granted Critical
Publication of CN101024465B publication Critical patent/CN101024465B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

本发明提供一种能够容易地进行紧急制动装置的动作确认的电梯装置以及试验方法等。在本发明的电梯的试验方法中,在卷扬机的驱动绳轮(5)处于旋转的状态下也能够抑制电梯轿厢(2)的下降,由此对所述电梯轿厢(2)的紧急制动装置(23)进行动作确认,其中,在复原力产生机构因平衡重(7)的下降而产生变形的状态下,使所述卷扬机的驱动绳轮(5)朝着所述平衡重(7)上升的方向旋转。

Figure 200710004712

The present invention provides an elevator device, a test method, and the like capable of easily checking the operation of an emergency braking device. In the elevator test method of the present invention, the elevator car (2) can be suppressed from falling even when the driving sheave (5) of the hoisting machine is in a rotating state, thus the emergency control of the elevator car (2) Check the operation of the moving device (23), wherein the drive sheave (5) of the winch is moved toward the counterweight (7) in a state where the restoring force generating mechanism is deformed due to the fall of the counterweight (7). ) to rotate in the upward direction.

Figure 200710004712

Description

电梯的试验方法及其辅助装置以及电梯装置Elevator test method and its auxiliary device and elevator device

技术领域technical field

本发明涉及一种具有电梯轿厢以及平衡重的电梯,尤其是涉及一种适合对紧急制动装置的动作进行确认的技术。The present invention relates to an elevator having an elevator car and a counterweight, and particularly relates to a technique suitable for confirming the action of an emergency braking device.

背景技术Background technique

在众多的电梯系统中,电梯轿厢和平衡重通过主吊索连结,并且设置有卷扬机,卷扬机在电梯轿厢和平衡重的中间部附近装入有驱动绳轮。而且,电梯系统构成为,主吊索卷挂在驱动绳轮上,通过使该驱动绳轮旋转,使电梯轿厢和平衡重上下移动。因此,为了在发生主吊索断裂等的异常事态时做到有备无患,在电梯轿厢中设置有紧急制动装置。In many elevator systems, the elevator car and the counterweight are connected by a main rope, and a hoist is provided, and the hoist is equipped with a drive sheave near the middle of the elevator car and the counterweight. In addition, the elevator system is configured such that the main rope is wound around the drive sheave, and the elevator car and the counterweight are moved up and down by rotating the drive sheave. Therefore, an emergency braking device is installed in the elevator car in order to be prepared in the event of an abnormal situation such as the breakage of the main rope.

在上述电梯系统中,在对所设置的电梯用紧急制动装置进行动作确认时,是在使电梯轿厢下落等与实际情况相同的条件下进行试验,所以有可能导致设备局部受到损伤,因此并不是一种恰当的试验方法。为此,作为一种得到普遍认可的简单的试验方法,首先有意识地使电梯轿厢的紧急制动装置动作,同时进行驱动以使平衡重上升,此时,通过确认紧急制动装置即使在驱动绳轮处于旋转的状态下也能够抑制电梯轿厢的下降,来进行试验。In the above-mentioned elevator system, when checking the operation of the installed elevator emergency braking device, the test is carried out under the same conditions as the actual situation, such as dropping the elevator car, so it may cause local damage to the equipment. Therefore, Not an appropriate test method. For this reason, as a generally accepted simple test method, first consciously activate the emergency braking device of the elevator car, and at the same time drive it to raise the counterweight. The test was conducted to suppress the descent of the elevator car even when the sheave was rotating.

例如,下述专利文献1中公开了一种电梯装置,其在进行紧急制动装置的动作确认时,通过使平衡重分离而减轻重量,以降低使驱动绳轮空转所需的卷扬机的转矩,从而防止卷扬机的大型化。For example, the following Patent Document 1 discloses an elevator apparatus that reduces the torque of the hoisting machine required to idle the driving sheave by separating the counterweight when checking the operation of the emergency braking device. , thereby preventing the hoist from being enlarged.

专利文献1特开2003-2564号公报(摘要等)Patent Document 1 JP-A-2003-2564 (Abstract etc.)

可是,在上述专利文献1所公开的电梯装置中,由于平衡重的结构复杂,所以制造困难,如果要设置多台电梯,则必须在每台电梯上分别安装特殊的平衡重。而且,难以将上述专利文献1的特殊的平衡重应用在具有通常的平衡重的现有的电梯中。However, in the elevator apparatus disclosed in the above-mentioned Patent Document 1, since the structure of the counterweight is complicated, it is difficult to manufacture, and if a plurality of elevators are to be installed, a special counterweight must be attached to each elevator. Furthermore, it is difficult to apply the special counterweight of the said patent document 1 to the conventional elevator which has a normal counterweight.

发明内容Contents of the invention

本发明的目的在于提供一种能够容易地进行紧急制动装置的动作确认的电梯装置以及试验方法等。An object of the present invention is to provide an elevator device, a test method, and the like that can easily check the operation of an emergency braking device.

为了实现上述目的,在本发明的电梯的试验方法中,通过确认在卷扬机的驱动绳轮处于旋转的状态下也能够抑制电梯轿厢的下降,由此对所述电梯轿厢的紧急制动装置进行动作确认,其中,在复原力产生机构因平衡重的下降而产生变形的状态下,使所述卷扬机的驱动绳轮朝着所述平衡重上升的方向旋转。In order to achieve the above object, in the elevator test method of the present invention, by confirming that the elevator car can be suppressed from falling even when the driving sheave of the hoisting machine is in a rotating state, the emergency braking device of the elevator car An operation check was performed in which the driving sheave of the hoist was rotated in a direction in which the counterweight was raised in a state where the restoring force generating mechanism was deformed by the lowering of the counterweight.

(发明效果)(invention effect)

根据本发明,可提供一种能够容易地进行紧急制动装置的动作确认的电梯装置以及试验方法等。According to the present invention, it is possible to provide an elevator device, a test method, and the like that can easily check the operation of an emergency braking device.

附图说明Description of drawings

图1是本发明第一实施例中的电梯装置的升降通道的平面剖视图。Fig. 1 is a plan sectional view of a hoistway of an elevator apparatus in a first embodiment of the present invention.

图2是表示本发明第一实施例中的电梯的试验辅助装置的图。Fig. 2 is a diagram showing an elevator test assisting device in the first embodiment of the present invention.

图3是表示本发明第二实施例中的电梯的试验辅助装置的图。Fig. 3 is a diagram showing an elevator test assisting device in a second embodiment of the present invention.

图4是表示本发明第三实施例中的电梯的试验辅助装置的图。Fig. 4 is a diagram showing an elevator test assisting device in a third embodiment of the present invention.

图5是表示本发明第四实施例中的电梯的试验辅助装置的图。Fig. 5 is a diagram showing an elevator test assisting device in a fourth embodiment of the present invention.

符号说明Symbol Description

1升降通道1 lifting channel

2电梯轿厢2 elevator cars

3、8主吊索固定件3.8 main sling fixing parts

4主吊索4 main slings

5驱动绳轮5 driving sheave

6导向滑轮6 guide pulley

7平衡重7 balance weight

9平衡重用缓冲器台9 balanced reuse buffer table

9a平衡重用缓冲器引导件9a Balanced reuse buffer guide

10平衡重用缓冲器10 balanced reuse buffers

11调节部11 Regulatory Department

11a、11b、18、18a基座11a, 11b, 18, 18a base

11c复原部用引导件Guide for 11c Restoration Department

11d辅助装置设置用引导件11d Guide for auxiliary device installation

12复原部12 Department of Rehabilitation

13电梯轿厢用缓冲器台13 Buffer table for elevator car

14电梯轿厢用缓冲器14 Buffer for elevator car

15最下层的电梯门厅的楼板15 The floor slab of the elevator lobby on the lowest level

16最上层的电梯门厅的楼板16 Floor slab of the elevator lobby on the top floor

17最上层出入口17Top floor entrance

19辅助装置用引导件19 guide for auxiliary device

20平衡重用油浸式缓冲器20 oil-immersed buffers for heavy balance

21平衡重用油浸式缓冲器台21 oil-immersed buffer table for heavy balance

22平衡重用油浸式缓冲器承受座22 oil-immersed buffer bearing seat for heavy balance

23紧急制动装置23 emergency braking device

24凹坑24 pits

25平衡重框架25 counterweight frame

26缓冲器承受件26 buffer receiver

27a、27b基座安装螺栓27a, 27b base mounting bolts

具体实施方式Detailed ways

以下参照附图对本发明的实施例进行说明。Embodiments of the present invention will be described below with reference to the drawings.

图1是本发明第一实施例中的电梯装置的升降通道1的平面剖视图。本实施例的电梯装置构成为,在升降通道1内具有电梯轿厢2、平衡重7以及卷扬机(未图示),电梯轿厢2和平衡重7由主吊索4悬吊,依靠卷扬机的驱动绳轮5的驱动力进行上下移动。Fig. 1 is a plan sectional view of a hoistway 1 of an elevator apparatus in a first embodiment of the present invention. The elevator device of the present embodiment is constituted such that there are an elevator car 2, a counterweight 7, and a winch (not shown) in the hoistway 1, the elevator car 2 and the counterweight 7 are suspended by the main rope 4, relying on the hoist The driving force of the drive sheave 5 moves up and down.

在此,主吊索4构成为,从设置在电梯轿厢2上的主吊索固定件3朝上方延伸,经过驱动绳轮5后卷挂在导向滑轮6上并朝下方延伸,到达设置在平衡重7上的主吊索固定件8。并且,作为本实施例中的主吊索4或者驱动绳轮5,除了钢制的材料以外,例如也可以采用树脂包覆的材料。此外,电梯轿厢2构成为,沿着未图示的电梯轿厢导轨升降,平衡重7构成为,沿着未图示的平衡重导轨升降。Here, the main rope 4 is configured to extend upward from the main rope fixture 3 provided on the elevator car 2 , pass through the drive sheave 5 , be wound around the guide pulley 6 and extend downward to reach the Main sling fixture 8 on counterweight 7. In addition, as the main rope 4 or the driving sheave 5 in this embodiment, a material covered with resin may be used, for example, other than steel. In addition, the elevator car 2 is configured to be raised and lowered along unshown elevator car guide rails, and the counterweight 7 is configured to be raised and lowered along unshown counterweight guide rails.

而且,电梯轿厢2中设置有紧急制动装置23,在升降通道1的上部附近,设置有未图示的调速器。并且,随着电梯轿厢2的移动,调速器旋转而达到异常速度时,调速器的绳索把持机构动作而把持住调速器绳索,通过电梯轿厢2的连结部件,能够以机械方式使紧急制动装置23动作,从而以强大的摩擦力使电梯轿厢2停止。并且,为了在电梯轿厢2以不会达到使紧急制动装置23动作的速度下降的情况下做到有备无患,在升降通道1下部的凹坑24处,通过电梯轿厢用缓冲器台13设置了电梯轿厢用缓冲器14。Furthermore, an emergency braking device 23 is provided in the elevator car 2, and a speed governor (not shown) is provided near the upper portion of the hoistway 1 . And, as the elevator car 2 moves, when the speed governor rotates and reaches an abnormal speed, the rope gripping mechanism of the speed governor acts to hold the speed governor rope, and through the connecting parts of the elevator car 2, it can be mechanically The emergency braking device 23 is activated to stop the elevator car 2 with a strong frictional force. And, in order to be prepared when the elevator car 2 descends at a speed that will not cause the emergency braking device 23 to act, at the pit 24 at the bottom of the hoistway 1, a buffer table 13 for the elevator car is installed. Buffer 14 for elevator car.

同样,在平衡重7上,设置了应对平衡重7的过速而动作,以防止平衡重7下落的紧急制动装置(未图示),在该平衡重7的下方,通过平衡重用缓冲器台9设置有平衡重用缓冲器10。Similarly, on the counterweight 7, an emergency braking device (not shown) that acts against the overspeed of the counterweight 7 to prevent the counterweight 7 from falling is provided. Below the counterweight 7, the counterweight uses a buffer The stage 9 is provided with a balanced reuse buffer 10 .

此外,在本实施例中,除了平衡重用缓冲器10以外,在平衡重7的下方,还设置了试验辅助装置,该试验辅助装置具有载置在平衡重用缓冲器10上的基座、相对于该基座在垂直方向上延伸设置的引导件以及插入该引导件的复原部。以下,参照图2对该试验辅助装置的详细情况进行说明。In addition, in this embodiment, in addition to the balance weight buffer 10, a test auxiliary device is provided below the balance weight 7. The test auxiliary device has a base placed on the balance weight buffer 10, and is relatively The base has a guide extended in the vertical direction and a restoration part inserted into the guide. Hereinafter, details of the test support device will be described with reference to FIG. 2 .

如图2所示,利用设置于平衡重用缓冲器10的管状平衡重用缓冲器引导件9a,安装了本实施例的试验辅助装置。而且,该试验辅助装置具体来说具备:插入到平衡重用缓冲器引导件9a中的辅助装置设置用引导件11d、固定了该辅助装置设置用引导件11d的基座11b、用于调节试验辅助装置的高度的调节部11、由螺旋弹簧等形成的复原部12、插入该复原部12的复原部用引导件11c以及固定了该复原部用引导件11c的基座11a。在此,辅助装置设置用引导件11d、基座11a、11b、调节部11以及复原部用引导件11c一体形成。As shown in FIG. 2 , the test auxiliary device of this embodiment was installed using the tubular counterweight buffer guide 9 a provided on the counterweight buffer 10 . In addition, this test auxiliary device specifically includes: an auxiliary device installation guide 11d inserted into the counterweight buffer guide 9a; The height adjusting part 11 of the device, the restoring part 12 formed of a coil spring or the like, the restoring part guide 11c inserted into the restoring part 12, and the base 11a on which the restoring part guide 11c is fixed. Here, the auxiliary device installation guide 11d, the bases 11a, 11b, the adjustment unit 11, and the restoration unit guide 11c are integrally formed.

通常时,该试验辅助装置位于凹坑24内的不会形成障碍的场所,但在试验时,首先将辅助装置设置用引导件11d插入平衡重用缓冲器引导件9a中,然后将复原部12插入到复原部用引导件11c,以设置在平衡重用缓冲器10上。Normally, this test auxiliary device is located in a place that does not form an obstacle in the recess 24, but in the test, first insert the auxiliary device installation guide 11d into the balance weight buffer guide 9a, and then insert the restoration part 12 To the guide 11c for the restoration part to be installed on the buffer 10 for balance and reuse.

以下,对本实施例的设置在电梯轿厢2上的紧急制动装置23的动作确认试验的方法进行说明。第一步,如上所述,将试验辅助装置设置在平衡重7的下方。第二步,使平衡重7下降,直至平衡重7的下端到达试验辅助装置的上端附近的位置。第三步,以远距离操作等方式使调速器脱扣(trip),使绳索把持机构动作。第四步,使平衡重7进一步下降,以压缩试验辅助装置的复原部12。第五步,使卷扬机的驱动绳轮5朝着平衡重7上升的方向旋转。第六步,由试验人员等通过目测等来确认即使在驱动绳轮5处于旋转的状态下,电梯轿厢2的下降也得到了抑制。例如,在电梯轿厢2侧的主吊索4松驰了,或者驱动绳轮5发生了空转时,可以认为电梯轿厢2的紧急制动装置23进行了动作。Hereinafter, the method of the operation confirmation test of the emergency braking device 23 installed on the elevator car 2 according to the present embodiment will be described. In the first step, as described above, the test auxiliary device is arranged under the counterweight 7 . In the second step, the balance weight 7 is lowered until the lower end of the balance weight 7 reaches a position near the upper end of the test auxiliary device. In the third step, the governor is tripped by means of remote operation, etc., so that the rope holding mechanism is actuated. In the fourth step, the balance weight 7 is further lowered to compress the recovery part 12 of the test auxiliary device. The fifth step is to make the driving sheave 5 of the winch rotate towards the direction that the balance weight 7 rises. In the sixth step, a tester or the like confirms that the descent of the elevator car 2 is suppressed even when the drive sheave 5 is in a rotating state by visual inspection or the like. For example, when the main rope 4 on the side of the elevator car 2 is loose, or the driving sheave 5 is idling, it can be considered that the emergency braking device 23 of the elevator car 2 has operated.

根据上述的本实施例,通过利用预先受到压缩的复原力产生机构的复原力,即使不提高卷扬机的转矩和控制装置的能力,也能够在电梯轿厢2的紧急制动装置23动作的状态下,将平衡重7自身容易地吊起。其结果,不需要使用大型的卷扬机等,就能够方便地实施紧急制动装置23的动作试验。此外,即使因使用树脂包覆绳索等作为主吊索4,导致主吊索4与驱动绳轮5之间的摩擦系数增大时,也能够容易地将平衡重7自身吊起,所以,能够容易产生驱动绳轮5的空转等的现象。According to the above-mentioned present embodiment, by utilizing the restoring force of the restoring force generating mechanism compressed in advance, even if the torque of the hoisting machine and the capability of the control device are not improved, the emergency braking device 23 of the elevator car 2 can be operated. Next, the balance weight 7 is easily lifted by itself. As a result, the operation test of the emergency braking device 23 can be easily performed without using a large hoist or the like. In addition, even when the coefficient of friction between the main rope 4 and the drive sheave 5 increases due to the use of a resin-coated rope or the like as the main rope 4, the balance weight 7 itself can be easily lifted, so that Phenomena such as idling of the driving sheave 5 are likely to occur.

并且,根据本实施例,即使是现有的电梯,也没有必要对平衡重7等进行特别的改良,而能够对紧急制动装置23的动作实施确认。而且,通过对调节部11的高度尺寸BH进行调节,能够将电梯轿厢2的停止位置调节到最上层的电梯门厅的楼板16的近前。因此,能够在电梯轿厢2的上部与最上层出入口17的上部框架之间任意地确保间隙A,在进行紧急制动装置23的动作确认试验时,还能够期待容易地确认驱动绳轮5的旋转情况和主吊索4的松驰状况的效果。Furthermore, according to the present embodiment, even if it is an existing elevator, it is not necessary to specially improve the counterweight 7 or the like, and the operation of the emergency braking device 23 can be checked. Furthermore, by adjusting the height dimension BH of the adjustment part 11, the stop position of the elevator car 2 can be adjusted to the front of the floor 16 of the elevator hall of the uppermost floor. Therefore, the gap A can be arbitrarily ensured between the upper part of the elevator car 2 and the upper frame of the uppermost doorway 17, and it is also expected that the operation of the driving sheave 5 can be easily confirmed when performing the operation confirmation test of the emergency braking device 23. The effect of the swivel condition and the slack condition of the main sling 4.

图3是表示本发明第二实施例中的电梯的试验辅助装置的图。如图3所示,平衡重7收纳在平衡重框架25内,在平衡重框架25的底部中央附近安装了缓冲器承受件26,在其下方的凹坑24内设置了平衡重用缓冲器10。此外,在该平衡重用缓冲器10的侧部,在凹坑24内设置了具有调节部11和复原部12的试验辅助装置。并且,与通常的电梯相同,当电梯轿厢2的载荷达到额定载荷的1/2时,平衡重7的质量与电梯轿厢2侧的质量达到平衡。Fig. 3 is a diagram showing an elevator test assisting device in a second embodiment of the present invention. As shown in FIG. 3 , the counterweight 7 is accommodated in a counterweight frame 25 , and a buffer receiving member 26 is installed near the center of the bottom of the counterweight frame 25 , and a counterweight buffer 10 is provided in a recess 24 below it. In addition, a test auxiliary device including an adjusting part 11 and a restoring part 12 is provided in a recess 24 on the side of the balance weight buffer 10 . And, like a normal elevator, when the load of the elevator car 2 reaches 1/2 of the rated load, the mass of the counterweight 7 and the mass of the elevator car 2 are balanced.

在此,复原部12设定成,在承受与电梯轿厢2的额定载荷的大约1/2相当的质量时,其挠曲量达到δ。另一方面,调节部11的高度调节为,在复原部12的挠曲量达到δ时,缓冲器承受件26到达平衡重用缓冲器10的上表面。因此,为了对紧急制动装置23的动作进行确认,而使平衡重7的下端降低到平衡重用缓冲器10的上端时,通过试验辅助装置的复原力,电梯轿厢2侧的质量与平衡重7侧的质量达到平衡。Here, the restoring portion 12 is set so that its deflection amount reaches δ when a mass corresponding to about 1/2 of the rated load of the elevator car 2 is applied. On the other hand, the height of the adjustment part 11 is adjusted so that the shock absorber 26 reaches the upper surface of the balance weight shock absorber 10 when the deflection amount of the restoration part 12 reaches δ. Therefore, in order to confirm the operation of the emergency braking device 23, when the lower end of the counterweight 7 is lowered to the upper end of the counterweight buffer 10, the mass of the elevator car 2 side and the counterweight will The mass of the 7 sides is balanced.

并且,在本实施例中,也是通过平衡重7的下降来使复原部12变形,以降低驱动绳轮5与主吊索4之间的摩擦力,在此状态下,使驱动绳轮5朝着平衡重7上升的方向旋转,所以,能够容易地产生驱动绳轮5空转等的现象。其结果,不需要使用大型的卷扬机等,也不需要对电梯设备和其结构进行大的变更,就能够以少量的部件方便地进行紧急制动装置23的动作确认试验。And, in this embodiment, the restoration part 12 is deformed by the descent of the balance weight 7 to reduce the frictional force between the driving sheave 5 and the main rope 4. In this state, the driving sheave 5 is moved toward Since it rotates in the direction in which the counterweight 7 rises, it is possible to easily cause the driving sheave 5 to spin idle or the like. As a result, the operation confirmation test of the emergency brake device 23 can be easily performed with a small number of components without using a large hoist or the like, and without requiring major changes to the elevator equipment or its structure.

图4是表示本发明第三实施例中的电梯的试验辅助装置的图。本实施例中的试验辅助装置也与第一实施例的情况相同,安装在平衡重用缓冲器10上,其与第一实施例的不同之处在于,在基座18的中心部设置有孔,插入到复原部12内的辅助装置用引导件19贯通该孔,并插入到平衡重用缓冲器引导件9a中。而且,作为本实施例的试验辅助装置的设置方法,首先将辅助装置用引导件19插入平衡重用缓冲器引导件9a中,并将基座18载置在平衡重用缓冲器10的上面,然后,利用该基座18插入复原部12。因此,根据本实施例,也与第一实施例相同,能够缩短试验辅助装置的设置时间,并且,由于平衡重用缓冲器10也能够期待一定的挠曲量δ1,所以能够缩小复原部12的挠曲量δ,即,能够实现复原部12的小型化。Fig. 4 is a diagram showing an elevator test assisting device in a third embodiment of the present invention. The test auxiliary device in this embodiment is also the same as that of the first embodiment, and it is installed on the buffer 10 for balance and reuse. The difference between it and the first embodiment is that a hole is provided at the center of the base 18. The auxiliary device guide 19 to be inserted into the restoration part 12 passes through this hole, and is inserted into the balance weight buffer guide 9a. And, as the installation method of the test auxiliary device of this embodiment, first, the guide 19 for the auxiliary device is inserted into the buffer guide 9a for the balance weight, and the base 18 is placed on the upper surface of the buffer 10 for the balance weight, and then, The restoration unit 12 is inserted into the base 18 . Therefore, according to this embodiment, like the first embodiment, the installation time of the test auxiliary device can be shortened, and since the buffer 10 for balance weight can also expect a certain amount of deflection δ1, the deflection of the restoring part 12 can be reduced. The amount of curvature δ, that is, it is possible to reduce the size of the restoration unit 12 .

图5是表示本发明第四实施例中的电梯的试验辅助装置的图。在本实施例中,与上述实施例的不同之处在于,作为平衡重用的缓冲器,不是使用弹簧式的缓冲器,而是使用了油浸式的缓冲器。并且,在设置该试验辅助装置时,首先将固定了复原部用引导件11c的基座18a载置在平衡重用油浸式缓冲器20上部的平衡重用油浸式缓冲器承受座22上,并通过基座安装螺栓27a、27b进行固定,之后,相对于该复原部用引导件11c插入复原部12。Fig. 5 is a diagram showing an elevator test assisting device in a fourth embodiment of the present invention. This embodiment differs from the above-described embodiments in that an oil-immersed shock absorber is used instead of a spring-type shock absorber as the balance weight shock absorber. And, when installing this test auxiliary device, first, the base 18a to which the guide 11c for the restoration part is fixed is placed on the oil-immersed buffer receiving seat 22 for the counterweight on the upper part of the oil-immersed buffer 20 for the counterweight, and After fixing with the base mounting bolts 27a and 27b, the restoration part 12 is inserted into the restoration part guide 11c.

并且,在上述第一实施例至第四实施例中,对设置在电梯轿厢2侧的紧急制动装置23的动作确认方法作了说明,而设置在平衡重7侧的紧急制动装置的动作确认方法也一样,通过利用由复原力产生机构预先蓄积的能量,能够期待与设置在电梯轿厢2侧的紧急制动装置23相同的效果。In addition, in the above-mentioned first to fourth embodiments, the operation confirmation method of the emergency braking device 23 installed on the elevator car 2 side has been described, but the operation confirmation method of the emergency braking device installed on the counterweight 7 side The operation confirmation method is also the same, and the same effect as that of the emergency braking device 23 installed on the elevator car 2 side can be expected by utilizing the energy previously stored in the restoring force generating mechanism.

此外,在上述第一实施例至第四实施例中,对利用了螺旋弹簧的弹力的机构作为复原力产生机构的情况作了说明,然而,只要是变形后的机构具有要复原的力,就能够作为复原力产生机构来使用。In addition, in the above-mentioned first to fourth embodiments, the case where the mechanism using the elastic force of the coil spring is used as the restoring force generation mechanism has been described, however, as long as the deformed mechanism has a restoring force, it is It can be used as a resilience generating mechanism.

Claims (9)

1.一种电梯的试验方法,其通过确认在卷扬机的驱动绳轮处于旋转的状态下也能够抑制电梯轿厢的下降,由此对所述电梯轿厢的紧急制动装置进行动作确认,其特征在于,1. A test method for an elevator, which confirms that the descent of the elevator car can be suppressed even when the drive sheave of the hoist is in a rotating state, thereby confirming the operation of the emergency braking device of the elevator car, which characterized in that, 在复原力产生机构因平衡重的下降而产生变形的状态下,使所述卷扬机的驱动绳轮朝着所述平衡重上升的方向旋转。The drive sheave of the hoist is rotated in a direction in which the counterweight rises while the restoring force generating mechanism is deformed by the fall of the counterweight. 2.如权利要求1所述的电梯的试验方法,其特征在于,2. the test method of elevator as claimed in claim 1 is characterized in that, 所述复原力产生机构设置在所述平衡重的下方,在使调速器脱扣后,使所述平衡重下降而压缩所述复原力产生机构,然后,使所述卷扬机的驱动绳轮朝着所述平衡重上升的方向旋转。The restoring force generating mechanism is arranged below the balance weight, and after the speed governor is tripped, the balancing weight is lowered to compress the restoring force generating mechanism, and then the drive sheave of the winch is moved toward Rotate in the direction in which the counterweight rises. 3.一种电梯的试验方法,其通过确认在卷扬机的驱动绳轮处于旋转的状态下也能够抑制平衡重的下降,由此对所述平衡重的紧急制动装置进行动作确认,其特征在于,3. A test method for an elevator, which confirms that the fall of the counterweight can be suppressed even when the driving sheave of the hoist is in a rotating state, thereby confirming the operation of the emergency braking device of the counterweight, characterized in that , 在复原力产生机构因电梯轿厢的下降而产生变形的状态下,使所述卷扬机的驱动绳轮朝着所述电梯轿厢上升的方向旋转。The driving sheave of the hoist is rotated in a direction in which the elevator car rises in a state where the restoring force generating mechanism is deformed by the descent of the elevator car. 4.一种电梯装置,具备:卷扬机,其对由主吊索悬吊的电梯轿厢以及平衡重进行驱动;缓冲器,其分别设置在所述电梯轿厢以及平衡重的下方;以及紧急制动装置,其应对所述电梯轿厢的过速而动作,防止所述电梯轿厢的下落,该电梯装置的特征在于,4. An elevator device comprising: a hoist that drives an elevator car suspended by a main sling and a counterweight; a buffer that is respectively arranged below the elevator car and the counterweight; and an emergency stop A moving device, which responds to the overspeed of the elevator car and acts to prevent the falling of the elevator car, the elevator device is characterized in that, 除了具有所述缓冲器之外,还具有复原力产生机构,该复原力产生机构用于在进行所述紧急制动装置的动作确认时,因所述平衡重的下降而预先产生变形。In addition to the shock absorber, a restoring force generating mechanism is provided for causing deformation in advance due to the lowering of the counterweight when checking the operation of the emergency braking device. 5.一种电梯装置,具备:卷扬机,其对由主吊索悬吊的电梯轿厢以及平衡重进行驱动;缓冲器,其分别设置在所述电梯轿厢以及平衡重的下方;以及紧急制动装置,其应对所述平衡重的过速而动作,防止所述平衡重的下落,该电梯装置的特征在于,5. An elevator device comprising: a hoist that drives an elevator car suspended by a main sling and a counterweight; a buffer that is respectively arranged below the elevator car and the counterweight; and an emergency stop A moving device, which operates in response to the overspeed of the counterweight to prevent the fall of the counterweight, the elevator device is characterized in that, 除了具有所述缓冲器之外,还具有复原力产生机构,该复原力产生机构用于在进行所述紧急制动装置的动作确认时,因所述电梯轿厢的下降而预先产生变形。In addition to the shock absorber, a restoring force generating mechanism is provided for causing deformation in advance due to the descent of the elevator car when checking the operation of the emergency braking device. 6.如权利要求4或5所述的电梯装置,其特征在于,6. Elevator installation according to claim 4 or 5, characterized in that 所述复原力产生机构具备:载置在所述缓冲器的上面的基座;相对于该基座在垂直方向上延伸设置的引导件;相对于该引导件插入的复原部。The restoring force generating mechanism includes: a base placed on the upper surface of the shock absorber; a guide extending in a vertical direction relative to the base; and a restoring portion inserted into the guide. 7.一种试验辅助装置,其安装于在电梯的平衡重或者电梯轿厢的下方配置的缓冲器,在对紧急制动装置进行动作确认时使用,其特征在于,7. A test auxiliary device, which is installed on the counterweight of an elevator or a buffer arranged below an elevator car, and is used when checking the operation of an emergency brake device, characterized in that, 具备:载置在所述缓冲器的上面的基座;相对于该基座在垂直方向上延伸设置的引导件;相对于该引导件插入的复原部。It includes: a base placed on the upper surface of the shock absorber; a guide extending in a vertical direction relative to the base; and a restoration portion inserted into the guide. 8.如权利要求7所述的试验辅助装置,其特征在于,8. The test aid of claim 7, wherein: 所述基座具有孔,所述引导件贯通所述孔,而且还插入到所述缓冲器内。The base has a hole through which the guide passes and is also inserted into the bumper. 9.如权利要求7所述的试验辅助装置,其特征在于,9. The test aid of claim 7, wherein: 所述基座、所述引导件、用于插入到所述缓冲器的其它引导件以及用于调节所述试验辅助装置的高度的调节部一体形成。The base, the guide, other guides for insertion into the buffer, and an adjustment portion for adjusting the height of the test auxiliary device are integrally formed.
CN 200710004712 2006-02-20 2007-01-26 Elevator testing method and its assistant device and elevator device Expired - Fee Related CN101024465B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2006-041798 2006-02-20
JP2006041798A JP4706498B2 (en) 2006-02-20 2006-02-20 Elevator test method, auxiliary device and elevator device
JP2006041798 2006-02-20

Publications (2)

Publication Number Publication Date
CN101024465A true CN101024465A (en) 2007-08-29
CN101024465B CN101024465B (en) 2012-12-19

Family

ID=38494853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710004712 Expired - Fee Related CN101024465B (en) 2006-02-20 2007-01-26 Elevator testing method and its assistant device and elevator device

Country Status (2)

Country Link
JP (1) JP4706498B2 (en)
CN (1) CN101024465B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105110130A (en) * 2015-09-15 2015-12-02 广东新力欧菲尔电梯有限公司 AC (Alternating Current) variable frequency speed regulating loading lift assembly
CN109655224A (en) * 2019-02-26 2019-04-19 广东清实检验技术有限公司 A kind of building hoist drop shutter test control device of wireless and method
CN109952262A (en) * 2016-11-21 2019-06-28 三菱电机株式会社 The inspection method of the emergency braking device of elevator
CN111479766A (en) * 2018-04-10 2020-07-31 三菱电机大楼技术服务株式会社 Elevator control device for enabling elevator car to function as scaffold

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5076525B2 (en) * 2007-02-05 2012-11-21 株式会社日立製作所 Test method for emergency stop device of elevator equipment
JP5074917B2 (en) * 2007-12-27 2012-11-14 株式会社日立製作所 Elevator emergency stop inspection device and emergency stop inspection method
CN101932520B (en) * 2008-04-08 2012-10-03 三菱电机株式会社 Elevator device and method of testing the same

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09255257A (en) * 1996-03-25 1997-09-30 Hitachi Building Syst Co Ltd Hydraulic elevator emergency stop test equipment
JP2001151435A (en) * 1999-11-25 2001-06-05 Hitachi Ltd Elevator shock absorber and elevator
JP2003002564A (en) * 2001-06-22 2003-01-08 Mitsubishi Electric Corp Elevator device
JP4024524B2 (en) * 2001-11-21 2007-12-19 三菱電機株式会社 Elevator equipment
WO2003074407A1 (en) * 2002-03-06 2003-09-12 Mitsubishi Denki Kabushiki Kaisha Emergency stop tester of elevator
JP4253600B2 (en) * 2004-03-01 2009-04-15 株式会社日立製作所 Elevator and emergency stop test method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105110130A (en) * 2015-09-15 2015-12-02 广东新力欧菲尔电梯有限公司 AC (Alternating Current) variable frequency speed regulating loading lift assembly
CN109952262A (en) * 2016-11-21 2019-06-28 三菱电机株式会社 The inspection method of the emergency braking device of elevator
CN109952262B (en) * 2016-11-21 2020-06-23 三菱电机株式会社 Method for inspecting emergency stop device of elevator
CN111479766A (en) * 2018-04-10 2020-07-31 三菱电机大楼技术服务株式会社 Elevator control device for enabling elevator car to function as scaffold
CN109655224A (en) * 2019-02-26 2019-04-19 广东清实检验技术有限公司 A kind of building hoist drop shutter test control device of wireless and method

Also Published As

Publication number Publication date
JP2007217154A (en) 2007-08-30
CN101024465B (en) 2012-12-19
JP4706498B2 (en) 2011-06-22

Similar Documents

Publication Publication Date Title
CN101024465B (en) Elevator testing method and its assistant device and elevator device
CN109562910B (en) Elevator device
EP2636626B1 (en) Elevator device
US9637348B2 (en) Elevator apparatus
CN107531453B (en) Brake force verification for elevator brakes
CN102666347B (en) For the method and apparatus of mobile heavy lift
JP2012246116A (en) Elevator device, and emergency stop test method thereof
JP2004345803A (en) Emergency stop device of elevator, emergency stop return device and emergency stop return method
CN102101620B (en) Lift facility
CN101759074A (en) Elevator apparatus
JPWO2003074407A1 (en) Elevator emergency stop test equipment
JP5074917B2 (en) Elevator emergency stop inspection device and emergency stop inspection method
JP2010089930A (en) Safety device of elevator
JP5076525B2 (en) Test method for emergency stop device of elevator equipment
CN101565141A (en) Elevator device
JP4862296B2 (en) Elevator inspection method
WO2015125294A1 (en) Elevator tie-down device and elevator device
CN105392728B (en) Lift appliance
JP2008162769A (en) Passenger rescue device for elevator
KR100879681B1 (en) Elevator emergency stop device
JP4514298B2 (en) Elevator equipment
CN103171951B (en) elevator equipment
JP4248678B2 (en) Elevator equipment
JP4302062B2 (en) Elevator equipment
JP6678814B2 (en) Elevator equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121219

Termination date: 20220126

CF01 Termination of patent right due to non-payment of annual fee