Device for bringing track yokes to and from a track laying crane

Info

Publication number
CH357425A
CH357425A CH357425DA CH357425A CH 357425 A CH357425 A CH 357425A CH 357425D A CH357425D A CH 357425DA CH 357425 A CH357425 A CH 357425A
Authority
CH
Switzerland
Prior art keywords
track
crane
yokes
wagons
bringing
Prior art date
Application number
Other languages
German (de)
Inventor
Ritter Anton
Original Assignee
Eberswalde Kranbau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eberswalde Kranbau filed Critical Eberswalde Kranbau
Publication of CH357425A publication Critical patent/CH357425A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

  

      Einrichtung        zum    Zubringen     und    Abtransportieren von Gleisjochen  zu bzw. von einem     Gleisverlegekran       Das fliessende maschinelle Verlegen bzw. Aus  bauen von Gleisjochen (komplette Gleisstücke) auf  eingleisigen Strecken mittels     Verlegekran        erfordert     eine besondere Einrichtung, welche sowohl die     Zu-          bringung    neuer als auch den Abtransport alter     Gleis-          joche    zugweise im gleichen Arbeitstempo     ermöb     licht.  



  Bekannt sind mit dem     Verlegekran    verbundene  Arbeitszüge, bei welchen auf seitlich der Wagen an  gebrachten Schienen sowie zwischen den Wagen  mit den Schienen gelenkig verbundenen Gleisbrücken  ein     Portalkran    zum Befördern der einzelnen     Gleis-          joche    mit Rollen läuft, ohne von den auf den Wagen  liegenden     Gleisjochstapeln    behindert zu werden.

    Diese Gleisbrücken erschweren das Kranfahren durch  übermässige Schrägstellung, wenn der belastete Kran  über ungleich belastete Wagenenden fährt, welcher  Mangel besonders dann in Erscheinung tritt, wenn  die Federn des mit Jochen vollbeladenen Wagens  zusammengedrückt und die der benachbarten leeren  Wagen, wie es auch an der     Jochübergabestelle    hinter  dem     Verlegewagen    der Fall ist, entspannt sind. Auch  bei Gleiskrümmungen wirken sich die Gleisbrücken  auf die Fahrbewegung ungünstig aus.  



  Die Erfindung bezweckt, diese Nachteile zu be  heben.  



  Erfindungsgemäss besitzt ein für das Laden und  Entladen von Gleisjochen auf bzw. von     Transport-          und        Absetzeisenbahnwagen    der Einrichtung vor  gesehener mehrgliedriger Portalkran Kufen, mittels  denen er auf einer an den     Plattformseitenrändern     der Wagen befestigten Rollbahn bewegt werden kann,  so dass die Gleisbrücken entfallen. Die Rollbahn ist  vorteilhaft von an den Wagen leicht an- und ab  baubaren Rollenböcken gebildet, so dass die Wagen    nach Beendigung der Bauarbeiten wieder allgemeinen  Transporten zur Verfügung stehen können.  



  Auf beiliegender Zeichnung ist ein Ausführungs  beispiel der Erfindung dargestellt und nachstehend.  anhand der Zeichnung näher erläutert.  



  Die gezeichnete Einrichtung zum Zubringen und!  Abtransportieren von Gleisjochen zu bzw. von einem       Gleisverlegekran    umfasst:  1. zwei     sogenannte        Absetzwagen,    welche bei  Ferntransport des     Verlegekranes    in einem Zug  verband als     Schutzwagen    und zur Aufbewahrung von  Zubehörteilen dienen,  2. eine Anzahl normaler Waggons für den  Transport von     Gleisjochstapeln    zwischen dem     Joch-          montagewerkplatz    und der jeweiligen Gleisbaustelle,  3.

   einen dreigliedrigen     Portalkran    für den Trans  port einzelner Gleisjoche auf den     Jochtransport-          waggons    und     Absetzwagen    für das Zubringen zum  bzw. Abtransportieren vom     Verlegekran,     4. eine Anzahl Rollenböcke zur Bildung einer  Rollbahn auf den Wagen für den     Portalkran,     5. eine Rangierlokomotive.  



       Abb.    1 zeigt eine Ansicht eines Teils der Ein  richtung, und       Abb.    2 der Fortsetzung davon.  



       Abb.    3     zeigt    einen Teil des dreigliedrigen Portal  kranes in Seitenansicht und       Abb.    4 eine Seitenansicht des     Portalkranes.     



  Die Teile unter 1. bis 4., im nachfolgenden   Bauzug  genannt, bilden ein von dem     Gleisverlege-          kran    und der Rangierlokomotive getrenntes selb  ständiges Bauglied mit eigener Kraftanlage.  



  Zu 1. Die beiden den Transportwagen 5 des  Bauzuges     vorgekuppelten        Absetzwagen    1 dienen in  erster Linie der Bereitstellung     einzelner    Gleisjoche,  entweder für das Verlegen mittels des     Verlegekranes         oder umgekehrt für das Verladen auf Transport  wagen für den Rücktransport. Sie sind beiderseits  in Abständen von z. B. 2-2,5 m mit Doppelbord  rollen 2 versehen, wobei jedes Paar sich gegenüber  liegender Rollen in einem quer die Wagenplattform  übergreifenden, auf ihr lösbar befestigten transpor  tablen Rollenstützbock 3 gelagert sind.

   Einer der  beiden     Absetzwagen    1 besitzt eine versenkt einge  baute dieselelektrische     Stromerzeugungsanlage    für  die Betätigung der     Zubringerportalkran-Hubwerke     und der Einrichtung zu seinem Verfahren sowie für  die erforderliche Beleuchtung. Diese     Diesel-Elektro-          aggregat    4 wird von Flur aus bedient.  



  Zu 2. Die zeitweilig für den Jochtransport be  stimmten, an die     Absetzwagen    gekuppelten Trans-,       portwagen    5 erhalten dafür ebenfalls die unter 1.  beschriebenen Rollenstützböcke 3, jedoch mit dem  Unterschied, dass letztere mittels Pratzen 6 an den  seitlichen     Plattformlängsträgern    der     Jochtransport-          waggons        angeklemmt    sind und     eine    Anzahl dieser  Böcke mit Gleitschuhen ausgerüstet ist,

   welche ein       seitliches    Gleiten der     daraufliegenden        Gleisjoch-          stapel    7 beim Durchfahren von     Gleiskrümmungen     ermöglichen. Die Jochstapel selbst sind an beiden  Enden mittels Spannketten 8 mit den bei diesen  Rollenstützböcken vorgesehenen Gleitschuhen fest  verspannt, so dass sich die Joche     gegeneinander    nicht  verschieben können.

   An den den Waggondrehgestell  zapfen nahehegenden Stellen liegen die Jochstapel  auf Rollstützböcken     unverschieblich    fest, während  bei den     dazwischenliegenden    Stützböcken die     Gleit-          schuhauflagestellen    eine Seitenverschiebung der     Joch-          stapel    gestatten.  



  Zu 3. Der     dreigliedrige        Zubringerportalkran    9  besteht aus dem mittels     Kuppelstangen    10 zusam  men gehaltenen Verband von drei torartigen Stahl  gerüsten mit Kufen 11 und besitzt vom Flur aus  steuerbare Elektrozüge 12 mit Schienengreifern 13,  welche an den in den Portalrahmen geführten Auf  hängetraversen 14 gelenkig befestigt sind. Für eine  leichte Bedienung der Schienengreifer zum Anhängen  oder Lösen der Joche sind transportable Bedienungs  leitern vorhanden.

   Das Verschieben des Zubringer  portalkranes auf der von den     Doppelbordrollen    ent  lang des Bauzuges gebildeten Rollbahn geschieht ent  weder von Hand mittels sechs klappbarer Hand  griffe oder mittels motorisch angetriebenen     Spills     vom mittleren Portal aus. Die Stromzuführung zum  Portalkran von dem im     Absetzwagen    eingebauten         Dieselelektroaggregat    aus erfolgt mittels flexiblem  Kabel, welches entlang des Bauzuges an den Köpfen  bzw. Pratzen der Rollenstützböcke befestigt ist. Die  auf Wagenlänge bemessenen Kabelstücke besitzen  einerseits Kupplung, anderseits Stecker sowie an  einzelnen Stellen Steckdosen für den     Zubringer-          Portalkrananschluss.     



  Zu 4. Die aus den einzelnen Rollenstützböcken  mit     Doppelbordrollen    gebildete Rollbahn bietet ge  genüber der sonst üblichen Anordnung (Kran mit  Rädern auf Schienen laufend) den Vorteil, dass die  sonst erforderlichen Gleisbrücken zwischen den  Waggons entfallen. Der zwischen belasteten und  leeren Waggons entstehende Federungshöhenunter  schied wird durch     Holzbeilagen    ausgeglichen. Bei       Gleisverlegerarbeiten    wird man z. B. die Rollbahn  auf den belasteten Waggons von vornherein so weit  mit Beilagen     unterpacken,    dass kein wesentlicher  Anstieg auf die etwas höher liegenden     Absetzwagen-          rollen    entsteht.

   Beim Ausbau von alten Gleisjochen,  das heisst beim Verladen derselben auf die     Joch-          transportwaggons,    also bei rückläufiger Bewegung,  werden diese Beilagen entfernt. Zur Fahrbegrenzung  des     Zubringerportalkranes    werden an den jeweili  gen Rollbahnenden     transportable,    von Hand einsetz  bare, auf die Kufen wirkende Schienenbremsen in  die Köpfe der Rollenstützböcke eingehängt.  



  Zu 5. Die Rangierlokomotive 15 dient zum  Transport des beladenen Bauzuges vom Montage  bahnhof zur Gleisbaustelle und umgekehrt. Die Lo  komotive findet weiter Verwendung beim     Transport     von Waggons zwischen den Bauplätzen sowie zum  zeitweisen Nachschub bzw.     Rückverholen    des Bau  zuges während der Verlege- bzw. Umbauarbeiten.  Ferner dient sie noch zum Verholen der Waggons  beim Zusammenbau der neuen und Auseinander  nehmen der ausgebauten alten Gleisjoche.



      Equipment for bringing track yokes to and from a track laying crane The flowing mechanical laying or expansion of track yokes (complete pieces of track) on single-track sections using a laying crane requires a special device that both brings in new and removes old track - yokes enabled in trains at the same working pace.



  Work trains connected to the laying crane are known, in which a gantry crane for transporting the individual track yokes runs with rollers on the side of the carriage on rails attached and between the carriage with the rails articulated to the rails, without being hindered by the track yoke stacks on the carriage will.

    These track bridges make crane travel more difficult due to excessive inclination when the loaded crane drives over unevenly loaded wagon ends, which defect occurs especially when the springs of the wagon fully loaded with yokes are compressed and those of the neighboring empty wagons, as is the case at the yoke transfer point behind the laying carriage is the case, are relaxed. The track bridges also have an unfavorable effect on the movement of the track when the track is curved.



  The invention aims to eliminate these disadvantages.



  According to the invention, a multi-section gantry crane for loading and unloading track yokes on or from transport and landing rail cars of the facility has runners by means of which it can be moved on a runway attached to the platform side edges of the car, so that the track bridges are omitted. The runway is advantageously formed by roller blocks that can be easily attached to and detached from the wagons, so that the wagons can be used for general transport again after the construction work is complete.



  In the accompanying drawing an embodiment example of the invention is shown and below. explained in more detail with reference to the drawing.



  The drawn device for bringing and! Transporting track yokes to or from a track laying crane comprises: 1. two so-called skip wagons, which are used as protection wagons and for storing accessories when the laying crane is being transported long-distance, 2. a number of normal wagons for transporting track yoke stacks between the yoke assembly workshop and the respective track construction site, 3.

   a three-part gantry crane for the transport of individual track bays on the yoke transport wagons and a set-off wagon for bringing them to and from the laying crane, 4. a number of roller blocks to form a runway on the wagons for the gantry crane, 5. a shunting locomotive.



       Fig. 1 shows a view of part of the device, and Fig. 2 shows the continuation thereof.



       Fig. 3 shows part of the three-part gantry crane in side view and Fig. 4 is a side view of the gantry crane.



  The parts under 1. to 4., referred to in the following construction train, form an independent component with its own power plant, separate from the track laying crane and the shunting locomotive.



  To 1. The two precoupled the transport car 5 of the construction train wagon 1 are primarily used to provide individual track sections, either for laying by means of the laying crane or vice versa for loading on transport dare for return transport. You are on both sides at intervals of z. B. 2-2.5 m with double board roll 2, each pair of opposite roles in a transversely cross the car platform, releasably attached to it transport tablen roller support frame 3 are stored.

   One of the two skip trucks 1 has a recessed built-in diesel-electric power generation system for the operation of the feeder portal crane hoists and the device for its process and for the required lighting. This electric diesel unit 4 is operated from the hallway.



  Regarding 2. The transport wagons 5, which are temporarily intended for yoke transport and are coupled to the skip wagons, also receive the roller support frames 3 described under 1., but with the difference that the latter are clamped to the side platform rails of the yoke transport wagons by means of claws 6 and a number of these trestles are equipped with sliding shoes,

   which enable the track yoke stacks 7 lying thereon to slide sideways when driving through curvatures of the track. The yoke stacks themselves are firmly clamped at both ends by means of tensioning chains 8 with the sliding shoes provided for these roller support frames, so that the yokes cannot move relative to one another.

   At the points close to the wagon bogie pegs, the yoke stacks are fixed immovably on roller support frames, while the sliding shoe support points allow the yoke stacks to be shifted sideways on the support frames in between.



  To 3. The three-part feeder portal crane 9 consists of the association of three gate-like steel scaffolding with runners 11 held together by means of coupling rods 10 and has controllable electric hoists 12 with rail grippers 13 from the hallway, which are hinged to the suspension beams 14 guided in the portal frame . Transportable operating ladders are available for easy operation of the rail grippers for attaching or detaching the yokes.

   Moving the feeder gantry crane on the runway formed by the double curb rollers along the construction train is done either by hand using six foldable handles or by means of motor-driven capstans from the center portal. The power supply to the gantry crane from the diesel electric unit built into the skip truck is supplied by means of a flexible cable which is attached to the heads or claws of the roller support frames along the construction train. The cable sections measured to the length of the car have a coupling on the one hand, a plug on the other hand and sockets for the feeder portal crane connection at individual points.



  To 4. The runway formed from the individual roller support frames with double curb rollers offers the advantage over the otherwise usual arrangement (crane with wheels running on rails) that the otherwise necessary track bridges between the wagons are omitted. The difference in suspension height between loaded and empty wagons is offset by wooden shims. In track laying work you will z. For example, the runway on the loaded wagons should be packed with inserts from the outset so that there is no significant increase on the slightly higher set-off wagons.

   When removing old track yokes, that is, when loading them onto the yoke transport wagons, ie when moving backwards, these attachments are removed. To limit the travel of the feeder gantry crane, transportable, hand-operated rail brakes that act on the runners are attached to the heads of the roller support frames at the respective ends of the runway.



  To 5. The shunting locomotive 15 is used to transport the loaded construction train from the assembly station to the track construction site and vice versa. The locomotive is also used to transport wagons between the construction sites and to temporarily replenish or move the construction train back during the relocation or renovation work. It is also used to move the wagons when assembling the new ones and dismantling the old ones.

 

Claims (1)

PATENTANSPRUCH Einrichtung zum Zubringen und Abtransportieren von Gleisjochen zu bzw. von einem Gleisverlegekran, dadurch gekennzeichnet, dass ein für das Laden und Entladen von Gleisjochen. auf bzw. von Transport- und Absetzeisenbahnwagen der Einrichtung vor gesehener mehrgliedriger Portalkran Kufen besitzt, mittels denen er auf einer an den Plattformrändern der Wagen befestigten, in transportable Teile zer legbaren Rollbahn bewegt werden kann. PATENT CLAIM Device for bringing in and transporting track yokes to or from a track laying crane, characterized in that one for loading and unloading track yokes. on or from transport and Absetzeisenbahnwagen the facility has seen multi-link gantry crane runners, by means of which it can be moved on a fixed to the platform edges of the car, in transportable parts zer legible runway.
CH357425D 1957-09-18 1957-09-18 Device for bringing track yokes to and from a track laying crane CH357425A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH357425T 1957-09-18

Publications (1)

Publication Number Publication Date
CH357425A true CH357425A (en) 1961-10-15

Family

ID=4511563

Family Applications (1)

Application Number Title Priority Date Filing Date
CH357425D CH357425A (en) 1957-09-18 1957-09-18 Device for bringing track yokes to and from a track laying crane

Country Status (1)

Country Link
CH (1) CH357425A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2431521A1 (en) * 2010-09-15 2012-03-21 GSG Knape Gleissanierung GmbH Device for platform construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2431521A1 (en) * 2010-09-15 2012-03-21 GSG Knape Gleissanierung GmbH Device for platform construction
WO2012034694A1 (en) * 2010-09-15 2012-03-22 Gsg Knape Gleissanierung Gmbh Device for carrying out track construction works
CN103109020A (en) * 2010-09-15 2013-05-15 克纳普集团控股公司 Device for carrying out track construction works

Similar Documents

Publication Publication Date Title
DE3833942A1 (en) Method and apparatus for automatically shifting large receptacles, such as containers
DE3234374A1 (en) Railway goods wagon for transporting road vehicles
DE2503197A1 (en) CONSTRUCTION TRAIN TO RENOVATE A RAILWAY TRACK
CH615969A5 (en) Movable machine arrangement for transporting bulk material
DE2301592C2 (en) Mobile device for continuously changing a track consisting of rails and sleepers or just the rails of the track
DE2834163C2 (en) Railway vehicle with a transfer device for containers
DD256158A5 (en) VEHICLE APPARATUS FOR RECORDING OR LOCATING AND TRANSPORTING GLEISJOCHEN
DE866913C (en) Road or rail truck for transporting smaller vehicles
US4608928A (en) Track-bound carriage for an assembled track section
CH357425A (en) Device for bringing track yokes to and from a track laying crane
DE2744011A1 (en) Transferable driver's cab for urban transport train - has separable module supported on rollers for automatic rapid coupling to train front
DE2228196A1 (en) PROCEDURE AND ARRANGEMENT FOR RENEWAL OF RAILWAY SECTIONS
DE2543463C3 (en)
DE3905641A1 (en) Device for loading and unloading lorries with pallets
DE862123C (en) Method, installation and devices for loading and unloading containers, in particular for road vehicles
EP2998180A1 (en) Transport module
EP0538648B1 (en) Carrying wagon for combined road-rail transport
DE3502226A1 (en) Rail-bound transportation vehicle, in particular for transporting passenger cars
DE444975C (en) A work train composed of a cantilever car and car with a gate crane running on rails on the outside of the car for laying and changing railway tracks
AT244376B (en) Device for taking up and exchanging track yokes
DE888859C (en) Railway train for laying and dismantling railway lines with the help of finished track sections
DE1840954U (en) DEVICE FOR SIDE LOADING OF MOTOR VEHICLES ON RAILWAYS.
AT140294B (en) Device for driving on railways by road vehicles.
AT351585B (en) RAILWAY VEHICLE FOR MOVING VESSELS, SUCH AS CONTAINERS, ON PARKING AREAS ON THE SIDE OF THE VEHICLE, IN PARTICULAR UNDER THE OVERHEAD CABLES FOR ELECTRIC TRAINING VEHICLES
DE805886C (en) Procedure for laying concrete sleepers in the paving track from the rail car in the siding