[go: up one dir, main page]

CH299963A - Process for the execution of reinforced foundation piles with widened base. - Google Patents

Process for the execution of reinforced foundation piles with widened base.

Info

Publication number
CH299963A
CH299963A CH299963DA CH299963A CH 299963 A CH299963 A CH 299963A CH 299963D A CH299963D A CH 299963DA CH 299963 A CH299963 A CH 299963A
Authority
CH
Switzerland
Prior art keywords
tube
rigid body
base
sub
reinforcements
Prior art date
Application number
Other languages
French (fr)
Inventor
Internationale Des P Compagnie
Original Assignee
Frankignoul Pieux Armes
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Frankignoul Pieux Armes filed Critical Frankignoul Pieux Armes
Publication of CH299963A publication Critical patent/CH299963A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

  

  <B>Procédé pour</B>     l'exécution   <B>de pieux de</B>     fondation   <B>armés à base</B>     élargie.       L'invention concerne un procédé pour  l'exécution de pieux de fondation en béton  armé ou     analogues,        pourvus    d'une base élargie  moulée dans le sol. Le terme béton est utilisé  pour désigner toute matière meuble ou plasti  que convenant pour l'exécution de pieux de  fondation.  



  Le procédé selon l'invention est caracté  risé par le fait que, après     foneage    du tube       jusqu'à    la profondeur voulue, on provoque  un déplacement axial déterminé entre le tube  et un corps rigide occupant au moins une  grande partie de     la    section libre à la base du  tube, de faon à placer ce corps rigide à une       distance    déterminée     sous    la.

   base du tube, et  on maintient cette distance pendant qu'on  dame du béton introduit dans le tube pour le  refouler latéralement dans le sol grâce audit       corps,    lequel est     disposé    pour former déflec  teur, jusqu'à formation d'une base élargie de  hauteur et de volume voulus entre ledit corps  et l'extrémité     inférieure    du tube, pour for  mer ensuite le     ffit    du pieu.  



  Selon un mode d'exécution de l'invention,  on utilise un     corps        rigide,    qui est de     préfé^          renee    établi en béton et.     est    avantageusement       réuni    à des armatures longitudinales dépas  sant l'extrémité supérieure du tube, et l'on  immobilise les armatures par rapport au tube       lorsque    l'écartement entre ledit corps et la  base du tube     est    atteint. La face supérieure  dudit, corps est de préférence conique ou     ana-          log-Lie    pour faciliter le refoulement latéral du  béton.

      Quelques exemples de mise en     aeuvre    du  procédé objet de l'invention sont décrits     ci-          après    avec référence au dessin schématique  annexé, dans lequel:  les     fig.    1 et 2 montrent deux vues en coupe  verticale,     respectivement    avant et après la       formation    de la base élargie d'un pieu en  cours d'exécution au moyen d'un tube foncé  à l'aide d'un bouchon étanche en béton ou  analogue formé dans son extrémité inférieure;

    les     fig.    3 et 4 montrent des vues partielles       semblables,        dans    le cas où le tube repose sur  une pointe     rigide    et est foncé par frappe di  recte sur le tube, et  les     fig.    5 et 6 montrent encore deux va  riantes d'exécution.  



  Dans l'exemple montré en     fig.    1 et 2, le  tube 1 a été enfoncé     dans    le sol en frappant  sur un bouchon     adhérent    étanche 2     formé    de  béton ou matière analogue comprimée. Lors  que la profondeur voulue a été atteinte, le  tube 1 est maintenu et on     poursuit    la frappe  sur le bouchon jusqu'à ce qu'il soit expulsé  partiellement ou même totalement si     aucune     pénétration d'eau ou de boue dans le tube  n'est à craindre. On introduit alors le corps  rigide 3, avantageusement en béton, dans le  quel les     barres    d'armature 4, 5, par exemple  au nombre de     trois    ou quatre, sont solidement  ancrées.

   Ces     barres    peuvent être réunies par  une ligature appropriée quelconque 6.  



  Sur ce corps 3, on verse une     certaine     quantité de béton et on poursuit le damage  de façon à expulser le corps 3 et le béton      hors du tube. On continue à déverser du bé  ton et à frapper sur celui-ci jusqu'à ce que le  corps 3 soit descendu sous le tube d'une dis  tance A déterminée d'avance, correspondant  à la hauteur de la base élargie qui doit être  formée. A ce moment, on maintient les arma  tures 4, 5 afin d'éviter toute descente     supplé-          rnentaire    du corps 3, qui pourrait se produire  si celui-ci n'était pas maintenu, le terrain  étant. supposé être de nature telle, par exem  ple de l'argile, qu'il n'offre pas une résis  tance suffisante pour empêcher cette descente  sous     l'effet.    du damage.  



  Ce maintien des armatures est d'ailleurs  toujours avantageux, aussi     dans    le cas où le  corps rigide n'aurait pas tendance à s'enfon  cer davantage et même s'il fallait relever  quelque peu le tube pour créer l'écartement  voulu entre son extrémité inférieure et le  corps rigide. En effet, si les armatures étaient  libres, elles pourraient s'infléchir vers l'exté  rieur sous l'effet du     damage,    ce qui serait  désavantageux et ne permettrait     plus    le con  trôle exact. de la hauteur de la base élargie,  puisque le mouvement axial relatif entre les  armatures et l'extrémité supérieure du tube  ne correspondrait plus exactement à l'écarte  ment entre la base du tube et le corps rigide.  



  Les nouvelles charges de béton, qui seront.  ensuite déversées dans le tube et damées, se  ront refoulées latéralement dans le sol, le     corps     3     formant    déflecteur. A cet effet, la face supé  rieure de ce corps sera     avantageusement    co  nique, arrondie ou analogue. On comprendra  que le contrôle .du volume des charges de bé  ton permet. de     déterminer    avec exactitude le  volume de     la    base élargie qui sera formée sur  la hauteur A. On achève ensuite le bétonnage  du pieu de la manière habituelle soit en reti  rant le tube 1, soit en l'abandonnant, dans le  sol s'il s'agit d'un fourreau permanent.  



  L'immobilisation :de l'armature pendant la  formation de la base élargie peut être réali  sée de toute     façon    appropriée, par exemple  au moyen de     crochets    7 formés à l'extrémité       supérieure    des armatures 4, 5, lesquels cro  chets viennent s'appuyer sur la tête du tube  1 lorsque le corps 3 est descendu de la dis-    tance A sous le tube. IL suffira de     couper    les  crochets pour libérer     l'armature    après forma  tion de la base élargie. S'il s'agit d'un four  reau abandonné dans le sol, les     crochets    peu  vent subsister.

   On peut aussi munir l'arma  ture d'une bague de renfort à son extrémité  supérieure et immobiliser celle-ci par rapport  au tube à l'aide d'organes de fixation amo  vibles pendant la formation de la base élar  gie. Dans le cas d'un fourreau permanent., on  peut. donner à cette bague un diamètre cor  respondant à celui du fourreau, de façon  qu'elle vienne s'appuyer sur     celui-ci.    Une telle  disposition est montrée en fi-. 4     (balle    3<B>)</B>.  



  Le procédé selon l'invention peut être  appliqué avec     n'importe    quel mode de fon  çage du tube. II est. toutefois     particulièrement     avantageux d'effectuer ce     fonçage    au moyen  d'un bouchon de béton, comme décrit ci-des  sus, ou au moyen d'un mandrin reposant à la  fois sur la tête du tube et sur un bouchon  d'étanchéité en béton ou analogue placé dans  celui-ci, car de cette façon le corps rigide se  trouve au-dessus d'une     eouehe    de béton qui  assurera son enrobage parfait après forma  tion de la base élargie.  



       Dans    l'exemple montré en     fig.        3--4,    le  tube 1 repose sur une pointe de     fonçage    9  et est par exemple descendu dans le sol par  frappe directe sur le tube. Avant. la mise en  place du corps 3 avec l'armature 4, 5, 6, on  déverse dans le tube une quantité de béton 10.  Lorsque la profondeur     voulue    est. atteinte, ce  béton 10 est     expulsé    soit avant l'introduction  du corps 3, soit après cette introduction et.  déversement, d'une certaine quantité de béton  sur ce corps. Ensuite, on forme la base élar  gie comme décrit avec référence aux     fig.    1  et 2.  



  De la même façon que le bouchon 2, la  masse de béton 10     formera    la partie infé  rieure de la base élargie, enrobant. ainsi com  plètement la face inférieure du corps 3 et  supprimant tout danger d'infiltration le long  de la surface de ce     corps,    et. donc tout dan  ger de destruction des     armatures    à leur point  d'attache au corps 3. On reste donc assuré  d'un parfait ancrage de l'armature dans la      base du pieu, ainsi que de sa forte résistance  aux tractions qui tendent à séparer le fût de  la base et qui se produisent par exemple lors  des soulèvements du sol qui sont fréquents  clans les terrains argileux.  



  Il est cependant bien entendu que l'inven  tion s'étend aussi au     -cas    où le corps 3 serait  posé directement sur la pointe 9, ainsi qu'au  cas où le corps 3 ferait corps avec cette pointe  9, c'est-à-dire au cas où les armatures 4, 5 se  raient ancrées directement dans la pointe 9,  comme montré en     fig.    5 et 6, cette pointe  étant. alors avantageusement munie d'une  face supérieure conique ou arrondie.  



  Pour s'opposer à la flexion -des armatures  vers     l'extérieur    sur la hauteur libre entre le  tube et le corps rigide pendant le damage du  béton pour former la base élargie, une     forme     d'exécution de l'invention prévoit également  un renforcement des     armatures    sur une lon  gueur plus grande que cette hauteur libre.

    Par ailleurs, afin de réduire le nombre de  lobes dont se composera la base élargie, par       suite    de la présence des barres d'armature  qui font fatalement     obstacle    au refoulement  latéral du béton, il convient de réduire le  nombre .des armatures par exemple à trois,  qui est le minimum pour éviter le     bascule-          ment    du corps 3, la section de ces     barres    étant  augmentée en     conséquence.    L'emploi     d'un     petit nombre d'armatures de forte section est  donc très avantageux. Le nombre des barres  d'armature pour le fût du pieu pourra être  plus grand.

   Les     fig.    5 et 6 montrent de telles  réalisations. Dans la     fig.    5, l'armature com  prend un petit nombre de grosses barres 11       ancrées    dans le corps rigide formant déflec  teur et un     certain    nombre de minces barres  12 s'arrêtant approximativement à la base du  tube 1, toutes ces barres     étant    réunies par  une ligature 6. La pointe 9 et le corps 3       (fig.    3<B>)</B> sont combinés en un     corps    unique 13.  



  Dans la     fig.    6, la. corbeille d'armature  pour le fût du pieu comprend des barres  minces 12 et à     l'extrémité    inférieure d'au  moins     certaines    d'entre elles sont fixées, par  exemple par soudure, des barres plus grosses  14 ancrées dans le corps 13.



  <B> Process for </B> the execution of <B> foundation piles </B> <B> reinforced with an enlarged base </B>. The invention relates to a method for making foundation piles made of reinforced concrete or the like, provided with a widened base molded into the ground. The term concrete is used to designate any loose or plastic material suitable for the execution of foundation piles.



  The method according to the invention is characterized by the fact that, after sinking the tube to the desired depth, a determined axial displacement is caused between the tube and a rigid body occupying at least a large part of the free section at the bottom. base of the tube, so as to place this rigid body at a determined distance under the.

   base of the tube, and this distance is maintained while the concrete is introduced into the tube to push it laterally into the ground thanks to said body, which is arranged to form a deflector, until a broad base is formed. and of desired volume between said body and the lower end of the tube, to then form the thread of the pile.



  According to one embodiment of the invention, a rigid body is used, which is preferably established in concrete and. is advantageously joined to longitudinal reinforcements exceeding the upper end of the tube, and the reinforcements are immobilized relative to the tube when the distance between said body and the base of the tube is reached. The upper face of said body is preferably conical or analog-Lie to facilitate the lateral upsetting of the concrete.

      Some examples of implementation of the process which is the subject of the invention are described below with reference to the appended schematic drawing, in which: FIGS. 1 and 2 show two views in vertical section, respectively before and after the formation of the widened base of a pile being carried out by means of a dark tube using a sealed concrete plug or the like formed in its lower end;

    figs. 3 and 4 show similar partial views, in the case where the tube rests on a rigid point and is darkened by direct striking on the tube, and figs. 5 and 6 show two more variants of execution.



  In the example shown in fig. 1 and 2, the tube 1 has been driven into the ground by striking a tight adherent plug 2 formed of compressed concrete or the like. When the desired depth has been reached, the tube 1 is maintained and the striking is continued on the stopper until it is partially or even completely expelled if no water or mud penetration into the tube is to fear. The rigid body 3, advantageously made of concrete, is then introduced into which the reinforcing bars 4, 5, for example three or four in number, are firmly anchored.

   These bars can be joined by any suitable ligature 6.



  On this body 3, a certain quantity of concrete is poured and the tamping is continued so as to expel the body 3 and the concrete out of the tube. We continue to pour concrete and knock on it until the body 3 has descended under the tube at a distance A determined in advance, corresponding to the height of the enlarged base to be formed. . At this moment, the armatures 4, 5 are maintained in order to avoid any additional descent of the body 3, which could occur if the latter were not maintained, the terrain being. assumed to be of such a nature, for example clay, that it does not offer sufficient resistance to prevent this descent under the effect. damage.



  This maintenance of the reinforcements is also always advantageous, also in the case where the rigid body would not tend to sink further and even if it was necessary to raise the tube somewhat to create the desired spacing between its end. lower and rigid body. Indeed, if the reinforcements were free, they could bend outwards under the effect of the tamping, which would be disadvantageous and no longer allow exact control. the height of the widened base, since the relative axial movement between the reinforcements and the upper end of the tube would no longer correspond exactly to the distance between the base of the tube and the rigid body.



  The new loads of concrete, which will be. then discharged into the tube and packed, ront flow back laterally into the ground, the body 3 forming a deflector. For this purpose, the upper face of this body will advantageously be conical, rounded or the like. It will be understood that the control of the volume of the concrete loads allows. to determine with exactitude the volume of the widened base which will be formed on the height A. The concreting of the pile is then completed in the usual way either by withdrawing the tube 1, or by abandoning it, in the ground if it is 'acts of a permanent sheath.



  The immobilization: of the frame during the formation of the enlarged base can be carried out in any suitable way, for example by means of hooks 7 formed at the upper end of the frames 4, 5, which hooks come to rest on the head of the tube 1 when the body 3 has descended the distance A under the tube. It will suffice to cut the hooks to release the frame after forming the enlarged base. If it is an oven rake abandoned in the ground, the hooks may remain.

   It is also possible to provide the armature with a reinforcing ring at its upper end and to immobilize the latter with respect to the tube using removable fasteners during the formation of the enlarged base. In the case of a permanent sheath, one can. give this ring a diameter corresponding to that of the sheath, so that it comes to rest on the latter. Such an arrangement is shown in fi-. 4 (ball 3 <B>) </B>.



  The method according to the invention can be applied with any method of sinking the tube. II is. however particularly advantageous to carry out this driving by means of a concrete plug, as described above, or by means of a mandrel resting both on the head of the tube and on a concrete sealing plug or analogous placed in it, because in this way the rigid body is located above a concrete layer which will ensure its perfect coating after forming the enlarged base.



       In the example shown in fig. 3--4, the tube 1 rests on a jacking point 9 and is for example lowered into the ground by direct impact on the tube. Before. the establishment of the body 3 with the frame 4, 5, 6, a quantity of concrete 10 is poured into the tube. When the desired depth is. reached, this concrete 10 is expelled either before the introduction of the body 3, or after this introduction and. spill, of a certain quantity of concrete on this body. Then, the widened base is formed as described with reference to FIGS. 1 and 2.



  In the same way as the plug 2, the mass of concrete 10 will form the lower part of the enlarged base, encasing. thus completely the underside of the body 3 and eliminating any danger of infiltration along the surface of this body, and. There is therefore a danger of destroying the reinforcements at their point of attachment to the body 3. We therefore remain assured of a perfect anchoring of the reinforcement in the base of the pile, as well as of its strong resistance to the tensions which tend to separate the stem from the base and which occur for example during soil uplifts which are frequent in clayey soils.



  It is, however, understood that the invention also extends to the case where the body 3 is placed directly on the point 9, as well as in the case where the body 3 forms a body with this point 9, that is to say - say in the event that the reinforcements 4, 5 are anchored directly in the point 9, as shown in FIG. 5 and 6, this point being. then advantageously provided with a conical or rounded upper face.



  To oppose the bending of the reinforcements outwards over the free height between the tube and the rigid body during the tamping of the concrete to form the widened base, one embodiment of the invention also provides for a reinforcement of the reinforcements over a length greater than this free height.

    Moreover, in order to reduce the number of lobes of which the enlarged base will be composed, owing to the presence of the reinforcing bars which inevitably obstruct the lateral displacement of the concrete, it is advisable to reduce the number of reinforcements, for example to three , which is the minimum to avoid tilting of the body 3, the section of these bars being increased accordingly. The use of a small number of reinforcements of large section is therefore very advantageous. The number of reinforcing bars for the pile shaft may be greater.

   Figs. 5 and 6 show such embodiments. In fig. 5, the frame comprises a small number of large bars 11 anchored in the rigid body forming a deflector and a number of thin bars 12 stopping approximately at the base of the tube 1, all of these bars being joined by a ligature 6 The tip 9 and the body 3 (fig. 3 <B>) </B> are combined into a single body 13.



  In fig. 6, the. Reinforcement basket for the pile shank comprises thin bars 12 and at the lower end of at least some of them are fixed, for example by welding, larger bars 14 anchored in the body 13.

 

Claims (1)

REVENDICATION: Procédé pour l'exécution de pieux de fon dation armés à base élargie, au moyen d'un tube descendu dans le sol, caractérisé en ce que, après fonçage du tube jusqu'à la pro fondeur voulue, on provoque un déplacement axial déterminé entre le tube et un corps ri gide occupant au moins une grande partie de la section libre à la base du tube, de façon à placer ce corps rigide à une distance d6ter- minée sous la base du tube, on maintient. CLAIM: Process for the execution of reinforced foundation piles with a widened base, by means of a tube lowered into the ground, characterized in that, after driving the tube to the desired depth, an axial displacement is caused determined between the tube and a rigid body occupying at least a large part of the free section at the base of the tube, so as to place this rigid body at a determined distance under the base of the tube, it is maintained. cette distance pendant qu'on dame du béton intro duit dans le tube pour le refouler latérale- ment dans le sol grâce audit corps, lequel est disposé pour former un déflecteur, jusqu'à formation d'une base élargie de hauteur et de volume voulus entre ledit corps et l'extré mité inférieure du tube, et_ l'on forme ensuite le fût du pieu. SOUS-REVENDICATIONS 1. this distance while concrete is being introduced into the tube in order to push it laterally into the ground thanks to said body, which is arranged to form a deflector, until an enlarged base of desired height and volume is formed between said body and the lower end of the tube, and then forming the shaft of the pile. SUB-CLAIMS 1. Procédé suivant la revendication, carac térisé en ce qu'on utilise un corps rigide réuni à des armatures longitudinales qui dépassent l'extrémité supérieure du tube, et on immo bilise ces armatures par rapport au tube pen dant la formation de la base élargie lorsque l'écartement voulu entre ledit corps et la base du tube est atteint. 2. Procédé suivant la revendication, ca ractérisé en. ce qu'on utilise un corps rigide présentant une surface supérieure convexe. 3. Procédé suivant la revendication, carac térisé en ce qu'on utilise un corps rigide éta bli en béton. 4. Process according to claim, characterized in that a rigid body is used joined to longitudinal reinforcements which protrude from the upper end of the tube, and these reinforcements are immobilized relative to the tube during the formation of the enlarged base when the The desired distance between said body and the base of the tube is achieved. 2. Method according to claim, ca acterized in. what is used is a rigid body having a convex upper surface. 3. Method according to claim, charac terized in that a rigid body established in concrete is used. 4. Procédé suivant la revendication, ca ractérisé en ce qu'on utilise un corps rigide présentant une section transversale plus pe tite que la section libre du tube. 5. Procédé suivant la revendication, ca ractérisé en ce qu'on utilise un corps rigide présentant une section transversale plus grande que la. section libre du tube. 6. Procédé suivant la revendication, ca ractérisé en ce qu'on utilise un corps rigide de section transversale plus petite que le tube, lequel corps est placé dans le tube au- dessus d'une couche de béton préalablement introduite dans l'extrémité inférieure du tube. 7. A method as claimed in claim, characterized in that a rigid body having a smaller cross section than the free section of the tube is used. 5. Method according to claim, characterized in that a rigid body is used having a cross section greater than the. free section of the tube. 6. Method according to claim, characterized in that one uses a rigid body of cross section smaller than the tube, which body is placed in the tube above a layer of concrete previously introduced into the lower end. of the tube. 7. Procédé suivant la revendication et la sous-revendication 6, caractérisé en ce que ladite couche de béton est versée dans le tube, au-dessus d'une pointe de fonçage sur laquelle repose le tube. 8. Procédé suivant la revendication et la sous-revendication 1, caractérisé en ce qu'au moins certaines des armatures utilisées ont. des extrémités supérieures présentant des éléments dirigés vers l'extérieur jusqu'en de hors de la. section libre du tube, la longueur des armatures étant telle que ces éléments rencontrent l'extrémité supérieure du tube lorsque le corps rigide se trouve sous le tube, à une distance correspondant à la hauteur voulue de la base élargie. 9. A method according to claim and sub-claim 6, characterized in that said layer of concrete is poured into the tube, above a jacking point on which the tube rests. 8. A method according to claim and sub-claim 1, characterized in that at least some of the reinforcements used have. upper ends having elements directed outwardly to out of the. free section of the tube, the length of the reinforcements being such that these elements meet the upper end of the tube when the rigid body is located under the tube, at a distance corresponding to the desired height of the enlarged base. 9. Procédé suivant la revendication et la sous-revendieation 1, caractérisé en ce qu'on utilise une armature dont l'extrémité supé rieure est pourvue d'une bague de renfort permettant d'immobiliser provisoirement l'ar mature par rapport au tube à l'aide' d'orga nes de fixation amovibles. 10. Process according to Claim and Sub-Claim 1, characterized in that a reinforcement is used, the upper end of which is provided with a reinforcing ring making it possible to temporarily immobilize the mature arm relative to the tube at the aid 'of removable fasteners. 10. Procédé suivant. la revendication et. la sous-revendication 9, pour coopérer av ec un tube constituant un fourreau permanent pour le pieu, caractérisé en ce qu'on utilise une ba gue de renfort, ayant un diamètre correspon dant à celui du fourreau, la largeur de l'ar mature étant telle que la bague rencontre l'extrémité supérieure du fourreau lorsque le corps rigide se trouve à. la distance voulue sous le fourreau. 11. Next process. the claim and. sub-claim 9, to cooperate with a tube constituting a permanent sheath for the pile, characterized in that a reinforcement bar is used, having a diameter corresponding to that of the sheath, the width of the mature ar being such that the ring meets the upper end of the sleeve when the rigid body is at. the desired distance under the scabbard. 11. Procédé suivant la revendication et la sous-revendication 1, caractérisé en ce qu'on utilise des armatures réunies au corps rigide présentant une partie inférieure renforcée s'étendant sur une longueur plus grande que la longueur sur laquelle les armatures sortent de la base du tube pendant, la formation de la base élargie. 12. Procédé suivant la revendication et. la sous-revendication 1, caractérisé en ce qu'on utilise des barres d'armature qui sont. réunies au corps rigide et sont reliées, par une liga ture transversale, à. des barres d'armature plus courtes, écartées d'une certaine distance dudit corps rigide. 13. A method according to claim and sub-claim 1, characterized in that use is made of reinforcements joined to the rigid body having a reinforced lower part extending over a length greater than the length over which the reinforcements protrude from the base of the tube during, the formation of the broad base. 12. The method of claim and. Sub-claim 1, characterized in that reinforcing bars are used which are. joined to the rigid body and are connected, by a transverse liga ture, to. shorter reinforcing bars, spaced a certain distance from said rigid body. 13. Procédé suivant la revendication et la sous-revendication 12, caractérisé en ce que lesdites barres plus courtes utilisées sont plus minces que les barres d'armature réunies au corps rigide. A method according to claim and sub-claim 12, characterized in that said shorter bars used are thinner than the reinforcing bars joined to the rigid body.
CH299963D 1952-02-01 1952-02-01 Process for the execution of reinforced foundation piles with widened base. CH299963A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH299963T 1952-02-01

Publications (1)

Publication Number Publication Date
CH299963A true CH299963A (en) 1954-07-15

Family

ID=4490493

Family Applications (1)

Application Number Title Priority Date Filing Date
CH299963D CH299963A (en) 1952-02-01 1952-02-01 Process for the execution of reinforced foundation piles with widened base.

Country Status (1)

Country Link
CH (1) CH299963A (en)

Similar Documents

Publication Publication Date Title
US1954070A (en) Pile
JP6932544B2 (en) Construction method of support pile
FR2536447A1 (en) METHOD FOR PRODUCING A CONCRETE CAST CONCRETE PILLAR
FR2502688A1 (en) METHOD AND DEVICE FOR CONSOLIDATING FIELD LAYERS FOR MINING AND UNDERGROUND WORKS
CH299963A (en) Process for the execution of reinforced foundation piles with widened base.
FR2610652A1 (en) PROCESS FOR REINFORCING A PITCHED TUBULAR PIEU, PIEU OBTAINED BY THIS METHOD, DEVICE FOR CARRYING OUT THE METHOD
BE508872A (en)
EP3414399B1 (en) Method for producing an anchoring tie rod and anchoring tie rod
JP4853132B2 (en) Construction method of foundation pile
FR2536826A1 (en) Method for anchoring a submerged pipe, device for implementing it and the anchoring thus produced.
FR2509341A1 (en) PROCESS FOR FIXING AND / OR STABILIZING FLOORS
FR2460837A1 (en) ANCHOR TO BE BURIED AND METHOD FOR ITS LANDFILLING
FR2524030A1 (en) Anchor head for progressively contracted composite tie rod - has truncated anchoring pin wedged into anchoring ring orifice
BE498717A (en)
WO2014049277A1 (en) Method for producing a ground anchor
FR2575776A1 (en) Method of constructing cast-in-place concrete pile
FR2718765A1 (en) Concrete floor slab construction resting on the ground.
FR2600686A1 (en) Improvements to reinforced concrete screw piles, by adding anchoring teeth
BE450549A (en)
BE518438A (en)
BE485040A (en)
BE1006194A5 (en) Drilling device and process for the formation of piles or the like
BE437054A (en)
BE513698A (en)
BE504613A (en)