[go: up one dir, main page]

BE450549A - - Google Patents

Info

Publication number
BE450549A
BE450549A BE450549DA BE450549A BE 450549 A BE450549 A BE 450549A BE 450549D A BE450549D A BE 450549DA BE 450549 A BE450549 A BE 450549A
Authority
BE
Belgium
Prior art keywords
pilot
barrel
molded
frame
piles
Prior art date
Application number
Other languages
French (fr)
Publication of BE450549A publication Critical patent/BE450549A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



  "procédé pour l'exécution de pieux mixtes de fondation en béton 
 EMI1.1 
 armé ou analogues" Il est connu d'exécuter des pieux mixtes de fondation en béton armé ou analogues, en formant une base élargie par damage dans le sol de béton ou analogues, et en enfonçant ensuite un pilot   préparé   d'avance dans une couche de béton plastique déversée sur la base. L'exécution d'un pieu mixte de grande longueur selon cette méthode, présentait l'inconvénient de nécessiter la manipulation très difficile d'un pilot de grande longueur ou la jonction, dans des conditions difficiles, de deux éléments de pilot juxtaposés.

   En plus, si la couche portante, c'est-à-dire   suffisamment   résistante, du sol ne se rencontre pas partout à la même profondeur, il faut utiliser depilots de grandeurs différentes pour que leur tête affleure la surface du sol. Cela entraîne, lors de la préparation du chantier, une incertitude sur la. longueur à donner aux pilots et un retard parfois important dans la fabrication de ceux-ci, retard qui se reporte sur toute l'exécution de la fondation. 



   En vue d'obvier à ces inconvénients, l'invention propose d'exécuter des pieux mixtes composés d'un morceau de fût de pieu. moulé dans le sol, de préférence au-dessus d'une base élargie, et d'un pilot préparé d'avance qui est solidement réuni au morceau 

 <Desc/Clms Page number 2> 

 de fût moulé dans le sol, de sorte qu'en variant la longueur de ce fût suivant la profondeur à laquelle se rencontre le bon sol, on peut exécuter tous les pieux d'une fondation en utilisant des pilots préparés d'avance qui ont tous la même longueur. La longueur de ces pilots peut être prédéterminée rapidement, ce qui permet de bétonner les pilots sans aucun retard. 



   Suivant l'invention, la jonction entre le fût moulé et le pilot est réalisée en déversant une masse de béton plastique ou liant analogue au-dessus du fût moulé, dont l'armature émerge sur une certaine hauteur, et en faisant pénétrer l'extrémité du pilot dans cette masse et à l'intérieur de. la partie débordante de l'armature du fût. 



   L'extrémité du pilot est avantageusement pointue ou conique pour faciliter la pénétration dans le béton plastique. L'armature du pilot peut faire saillie à son extrémité inférieure, ou bien celle-ci peut présenter des rainures périphériques ou analogues pour augmenter l'adhérence du béton plastique au pilot. Pour faci- liter la pénétration du pilot dans ce béton et pour améliorer l'adhérence entre le fùt, le béton frais et le pilot, on peut vibrer ce béton,   notamment   en appliquant la vibration au tube de foncage qui a servi au moulage du fÜt et dans le fond duquel le béton plastique a été déversé, ou au pilot lui-même, ou   à.   l'un et l'autre. 



   D'autres particularités et avantages ressortiront de la des- cription de quelques exemples de réalisation de l'invention, qui sera donnée ci-après avec référence au dessin annexé, dans lequel : 
Fig. 1 montre une vue schématique d'une partie d'une fondation établie conformément à l'invention; 
Fig. 2 montre une forme d'exécution d'un pieu mixte selon l'invention, et t
Fig. 3 montre une variante d'exécution de la jonction entre le fût moulé et la pilot. 



   Comme montré en Fig. 1, un pieu mixte suivant l'invention com- porte un morceau de fÜt 1 moulé dans le sol, de préférence muni d'une base élargie 2, et un pilot préparé d'avance 3. Le fonçage du tube de cuvelage '4 (Fig.   3)on   vue de l'exécution du pieu, est poursuivie jusqu'à ce qu'on   atteigne   une couche de terrain suffisamment résistante. Le bon terrain se rencontrant à une profondeur variable, on donne au fût moulé 1 une longueur variable avec la dite profondeur, en l'arrètant à une distance déterminée a du niveau du sol, qui correspond à la longueur constante des 

 <Desc/Clms Page number 3> 

 pilots qui sont utilisés pour les divers pieux mixtes d'une fondation.

   Lorsque le tronçon de fût moulé 1 a atteint la longueur voulue, on déverse dans le tube de   cuvelage 4   une certaine   masse   de béton plastique ou analogue 60
L'armature 5 du fût moulé 1 dépasse l'extrémité supérieure de celui-ci et s'étend dans la masse de béton plastique 6. Cette partie saillante de l'armature est avantageusement renforcée, par exemple par une bague7 soudée ou ligaturée à l'extrémité de   l' ar-   mature. Cette extrémité peut être évasée afin de supprimer tout risque de détérioration par le dameur qui doit traverser cette armature pendant le bétonnage du fût . 1. 



   On fait pénétrer le pilot 3 dans le béton frais   6,   par ex. par battage en tête, ce pilot pouvant   présenterune   extrémité conique ou pointue 8 pour faciliter sa pénétration dans le béton 6 et   l'armature   5. Des rainures 9 améliorent l'adhérence entre le béton   6   et le pilot 3. 



   Il est avantageux d'imprimer des vibrations au tube 4 ou au pilot 3, ou aux deux , à l'aide d'un système vibreur quelconque, de manière à mettre le béton 6 en vibration et à faciliter la   pé-   nétration du pilot 3 dans ce béton, tout en assurant une meilleure adhérence entre le pilot, le béton 6 et le fût 1. 



   Le pilot 3 peut également être pourvu d'une armature saillante 10 qu'on fait pénétrer, comme l'extrémité du pilot 3 de Fig. 2, dans le béton 6 et l'armature 5 qui déborde du fût 1, par   exemple   jusqu'à ce que l'armature rencontre   l'extrémité   supérieure du füt moulé dans le sol. La Fig. 3 montre une jonction entre le fût et le pilot, exécutée de cette manière, le tube de cuvelage 1 ayant été retiré après   l'achèvement   de la jonction. L'armature 5 montrée en Fig. 3 pourrait être renforcée   comme   celle de la Fig. 2. 



     La   jonction ,Mitre le fût et le pilot, réalisée   conformément   à l' invention, par   exemple   comme illustré en Figs. 2 et 3, assure une liaison très sûre de ces deux éléments, notamment grâce au fait que l'extrémité du pilot ou son armature saillante vient s'emboîter dans la partie   débordante   de l'armature du fût. La continuité est absolue entre le fût et le pilot; la résistance à la traction et à la flexion, aussi bien qu'àla compression, sont invariables dans toute la longueur da l'ensemble constitué par les deux éléments. Tout danger de cassure du pieu sous l'influence d'un mouvement de soulèvement du sol est ainsi éliminé.



   <Desc / Clms Page number 1>
 



  "method for the execution of composite concrete foundation piles
 EMI1.1
 reinforced concrete or the like "It is known to make mixed foundation piles of reinforced concrete or the like, forming a widened base by ramming into the concrete ground or the like, and then driving a pilot prepared in advance in a layer of plastic concrete poured on the base. The execution of a mixed pile of great length according to this method, had the drawback of requiring the very difficult handling of a pilot of great length or the junction, under difficult conditions, of two juxtaposed pilot elements.

   In addition, if the bearing layer, that is to say sufficiently resistant, of the soil does not meet everywhere at the same depth, it is necessary to use piles of different sizes so that their heads are flush with the surface of the soil. This leads, during site preparation, to uncertainty about the. length to be given to the pilings and a sometimes significant delay in their manufacture, a delay which affects the entire execution of the foundation.



   In order to overcome these drawbacks, the invention proposes to perform mixed piles composed of a piece of pile shaft. molded into the ground, preferably over an enlarged base, and a pre-prepared pilot that is securely joined to the piece

 <Desc / Clms Page number 2>

 of barrel molded into the ground, so that by varying the length of this barrel according to the depth at which the good soil meets, we can execute all the piles of a foundation using piles prepared in advance which all have the same length. The length of these piles can be predetermined quickly, which allows the piles to be concreted without any delay.



   According to the invention, the junction between the molded barrel and the pilot is produced by pouring a mass of plastic concrete or similar binder over the molded barrel, the reinforcement of which emerges over a certain height, and by making the end penetrate of the pilot in this mass and inside. the overhanging part of the barrel frame.



   The end of the pilot is advantageously pointed or conical to facilitate penetration into the plastic concrete. The reinforcement of the pilot may project at its lower end, or it may have peripheral grooves or the like to increase the adhesion of the plastic concrete to the pilot. To facilitate the penetration of the pilot into this concrete and to improve the adhesion between the drum, the fresh concrete and the pilot, this concrete can be vibrated, in particular by applying the vibration to the driving tube which was used for the casting of the drum. and into the bottom of which the plastic concrete has been poured, or to the pilot itself, or to. one and the other.



   Other features and advantages will emerge from the description of some exemplary embodiments of the invention, which will be given below with reference to the appended drawing, in which:
Fig. 1 shows a schematic view of part of a foundation established in accordance with the invention;
Fig. 2 shows an embodiment of a mixed pile according to the invention, and t
Fig. 3 shows an alternative embodiment of the junction between the molded barrel and the pilot.



   As shown in Fig. 1, a mixed pile according to the invention comprises a piece of drum 1 molded into the ground, preferably provided with a widened base 2, and a pilot prepared in advance 3. The sinking of the casing tube '4 ( Fig. 3) a view of the construction of the pile, is continued until a sufficiently resistant layer of soil is reached. The good ground meeting at a variable depth, we give to the molded barrel 1 a variable length with the said depth, stopping it at a determined distance from the ground level, which corresponds to the constant length of the

 <Desc / Clms Page number 3>

 piles which are used for the various mixed piles of a foundation.

   When the molded barrel section 1 has reached the desired length, a certain mass of plastic concrete or the like 60 is poured into the casing tube 4.
The frame 5 of the molded barrel 1 protrudes from the upper end of the latter and extends into the mass of plastic concrete 6. This projecting part of the frame is advantageously reinforced, for example by a ring7 welded or ligated to the end of the armature. This end can be flared in order to eliminate any risk of damage by the tamper which must pass through this reinforcement during the concreting of the drum. 1.



   The pilot 3 is made to penetrate the fresh concrete 6, eg. by beating at the head, this pilot can have a conical or pointed end 8 to facilitate its penetration into the concrete 6 and the reinforcement 5. Grooves 9 improve the adhesion between the concrete 6 and the pilot 3.



   It is advantageous to impart vibrations to the tube 4 or to the pilot 3, or to both, using any vibrating system, so as to set the concrete 6 in vibration and to facilitate the penetration of the pilot 3. in this concrete, while ensuring better adhesion between the pilot, the concrete 6 and the drum 1.



   The pilot 3 can also be provided with a projecting frame 10 which is made to penetrate, like the end of the pilot 3 of FIG. 2, in the concrete 6 and the reinforcement 5 which protrudes from the barrel 1, for example until the reinforcement meets the upper end of the barrel molded in the ground. Fig. 3 shows a junction between the barrel and the pilot, made in this way, the casing tube 1 having been removed after the completion of the junction. The frame 5 shown in FIG. 3 could be reinforced like that of FIG. 2.



     The junction, Miter the barrel and the pilot, produced in accordance with the invention, for example as illustrated in Figs. 2 and 3, ensures a very secure connection of these two elements, in particular thanks to the fact that the end of the pilot or its projecting frame fits into the projecting part of the frame of the barrel. There is absolute continuity between the barrel and the pilot; the resistance to traction and bending, as well as to compression, are invariable throughout the length of the assembly formed by the two elements. Any danger of the pile breaking under the influence of a lifting movement of the ground is thus eliminated.


    

Claims (1)

RESUME. EMI4.1 -------¯......-..¯-- L'invention est relative à un procédé pour l'exécution de pieux mixtes de fondation, en béton armé. ou analogues, e'n 'faisant usage de pilots préparés d'avance, et comporte essentiellement les particularités ci-après prises séparément ou en combinaison : 1 ) l'exécution d'un pieu mixte composé d'un morceau de fût de pieu moulé dans le sol, de préférence au-dessus d'une base élargie, et d'un pilot préparé d'avance qui est solidement réuni au morceau de fût moulé dans le sol, de sorte qu'en variant la longueur de ce fût suivant la profondeur à laquelle, se rencontre le bon sol, on peut exécuter tous les pieux d'une fondation en utilisant des pilots préparés d'avance ayant tous la même longueur; ABSTRACT. EMI4.1 ------- ¯ ......- .. ¯-- The invention relates to a method for the execution of mixed foundation piles, in reinforced concrete. or the like, making use of pilots prepared in advance, and essentially comprises the following features taken separately or in combination: 1) the execution of a mixed pile consisting of a piece of pile shank molded into the ground, preferably above a widened base, and a pre-prepared pilot which is securely joined to the piece of a shaft molded into the ground, so that by varying the length of this shaft according to the depth at which the good soil is encountered, all the piles of a foundation can be made using piles prepared in advance having all the same length; 2 ) la réalisation de la jonction entre le fût moulé et le pilot, en déversant une masse de béton plastique ou liant analogue au-dessus du fût moulé, dont l'armature émerge sur une certaine hauteur, et en faisant pénétrer l'extrémité du pilot dans cette masse et à l'intérieur de la partie débordante de l'arrnature du fût; 3 ) la mise en vibration de la masse de. béton plastique, par exemple en imprimant des vibrations au tube de cuvelage ayant serviau moulage du fût et dans lequel le béton plastique est déversé, ou au pilot, ou au tube et au pilot; 4 ) la prévision de rainures périphériques dans l'extrémité inférieure du pilot; 50) la prévision d'une armature qui émerge à l'extrémité inférieure du pilot; 2) making the junction between the molded barrel and the pilot, by pouring a mass of plastic concrete or similar binder over the molded barrel, from which the reinforcement emerges to a certain height, and by making the end of the pilot in this mass and inside the projecting part of the frame of the barrel; 3) the vibration of the mass of. plastic concrete, for example by imparting vibrations to the casing tube having been used for molding the barrel and into which the plastic concrete is poured, or to the pilot, or to the tube and to the pilot; 4) the provision of peripheral grooves in the lower end of the pilot; 50) the provision of a frame that emerges at the lower end of the pilot; 6 ) le renforcement de l'armature débordant à l'extrémité supérieure du fût moulé, par exemple à l'aide d'une bague soudée ou ligaturée autour de cette armature; 7 l'évasement de l'armature débordant à l'extrémité supérieure du fût moulé. 6) reinforcement of the frame protruding from the upper end of the molded barrel, for example by means of a ring welded or ligated around this frame; 7 the flaring of the frame protruding from the upper end of the molded barrel.
BE450549D BE450549A (en)

Publications (1)

Publication Number Publication Date
BE450549A true BE450549A (en)

Family

ID=105600

Family Applications (1)

Application Number Title Priority Date Filing Date
BE450549D BE450549A (en)

Country Status (1)

Country Link
BE (1) BE450549A (en)

Similar Documents

Publication Publication Date Title
CA1335475C (en) Anchoring element, especially for concrete
US1954070A (en) Pile
EP0110925A1 (en) Tool for driving in and guiding pegs for fixing stakes.
EP0786035B1 (en) Device for anchoring the foundation of a structure in the ground
FR2648839A1 (en) FOUNDATION PILES, METHODS, TOOLS AND MACHINES FOR CONSTRUCTING THESE PILES
EP1794375B1 (en) Device and method for a tower reinforcing foundation
BE450549A (en)
EP1936039B1 (en) Method of strengthening foundations comprising a slab buried in the ground, in particular foundations for pylons, and structure obtained
EP3508654A1 (en) Composite pile
FR2892135A1 (en) Helical micro pile and pile uplift capacity testing installation connecting unit for e.g. stabilizing existing foundations, has massive upper part, and lower part having reservation formed as counterpart in shape of upper part in micro pile
FR2524030A1 (en) Anchor head for progressively contracted composite tie rod - has truncated anchoring pin wedged into anchoring ring orifice
FR3097886A1 (en) Construction system in UHPC / Composite tubular element
BE1006194A5 (en) Drilling device and process for the formation of piles or the like
EP3205775B1 (en) Method of drilling
CH299963A (en) Process for the execution of reinforced foundation piles with widened base.
BE431610A (en)
CA2202392A1 (en) Device for anchoring the foundation of a structure in the ground
BE518438A (en)
FR2471451A1 (en) Driving and casting procedure for bulbous foot piles - uses concrete rammer inside pile tube with projection above tube being equal to volume of concrete cast
FR3101651A1 (en) Reinforcing rod for a structural element of reinforced concrete, Assembly of structural elements, and Method of manufacturing an assembly of structural elements
WO2000040808A1 (en) Method and device for forming a foundation pipe pile in the ground
BE393943A (en)
CA2923665A1 (en) Attachment system on a geotechnical anchor and reinforcing assembly using such an attachment
BE368071A (en)
EP1867788A2 (en) Anchor device with rocker