US7426961B2
(en)
*
|
2002-09-03 |
2008-09-23 |
Bj Services Company |
Method of treating subterranean formations with porous particulate materials
|
US6795773B2
(en)
*
|
2001-09-07 |
2004-09-21 |
Halliburton Energy Services, Inc. |
Well completion method, including integrated approach for fracture optimization
|
US6662874B2
(en)
*
|
2001-09-28 |
2003-12-16 |
Halliburton Energy Services, Inc. |
System and method for fracturing a subterranean well formation for improving hydrocarbon production
|
US6938690B2
(en)
|
2001-09-28 |
2005-09-06 |
Halliburton Energy Services, Inc. |
Downhole tool and method for fracturing a subterranean well formation
|
US6719054B2
(en)
|
2001-09-28 |
2004-04-13 |
Halliburton Energy Services, Inc. |
Method for acid stimulating a subterranean well formation for improving hydrocarbon production
|
US6725933B2
(en)
*
|
2001-09-28 |
2004-04-27 |
Halliburton Energy Services, Inc. |
Method and apparatus for acidizing a subterranean well formation for improving hydrocarbon production
|
US7216711B2
(en)
|
2002-01-08 |
2007-05-15 |
Halliburton Eenrgy Services, Inc. |
Methods of coating resin and blending resin-coated proppant
|
RU2004126426A
(ru)
*
|
2002-02-01 |
2006-01-27 |
Риджентс Оф Дзе Юниверсити Оф Миннесота (Us) |
Интерпретация и проектирование операций по гидравлическому разрыву пласта
|
US6691780B2
(en)
*
|
2002-04-18 |
2004-02-17 |
Halliburton Energy Services, Inc. |
Tracking of particulate flowback in subterranean wells
|
WO2004022914A1
(en)
*
|
2002-09-03 |
2004-03-18 |
Bj Services Company |
Method of treating subterranean formations with porous ceramic particulate materials
|
US20060058197A1
(en)
*
|
2004-09-15 |
2006-03-16 |
Brown J E |
Selective fracture face dissolution
|
US20040211561A1
(en)
|
2003-03-06 |
2004-10-28 |
Nguyen Philip D. |
Methods and compositions for consolidating proppant in fractures
|
WO2004083600A1
(en)
*
|
2003-03-18 |
2004-09-30 |
Bj Services Company |
Method of treating subterranean formations using mixed density proppants or sequential proppant stages
|
US7114570B2
(en)
|
2003-04-07 |
2006-10-03 |
Halliburton Energy Services, Inc. |
Methods and compositions for stabilizing unconsolidated subterranean formations
|
US6978836B2
(en)
|
2003-05-23 |
2005-12-27 |
Halliburton Energy Services, Inc. |
Methods for controlling water and particulate production
|
US7413010B2
(en)
|
2003-06-23 |
2008-08-19 |
Halliburton Energy Services, Inc. |
Remediation of subterranean formations using vibrational waves and consolidating agents
|
US7114560B2
(en)
|
2003-06-23 |
2006-10-03 |
Halliburton Energy Services, Inc. |
Methods for enhancing treatment fluid placement in a subterranean formation
|
US7013976B2
(en)
|
2003-06-25 |
2006-03-21 |
Halliburton Energy Services, Inc. |
Compositions and methods for consolidating unconsolidated subterranean formations
|
US7021379B2
(en)
|
2003-07-07 |
2006-04-04 |
Halliburton Energy Services, Inc. |
Methods and compositions for enhancing consolidation strength of proppant in subterranean fractures
|
US7066258B2
(en)
|
2003-07-08 |
2006-06-27 |
Halliburton Energy Services, Inc. |
Reduced-density proppants and methods of using reduced-density proppants to enhance their transport in well bores and fractures
|
US7156194B2
(en)
|
2003-08-26 |
2007-01-02 |
Halliburton Energy Services, Inc. |
Methods of drilling and consolidating subterranean formation particulate
|
US7237609B2
(en)
|
2003-08-26 |
2007-07-03 |
Halliburton Energy Services, Inc. |
Methods for producing fluids from acidized and consolidated portions of subterranean formations
|
US7017665B2
(en)
|
2003-08-26 |
2006-03-28 |
Halliburton Energy Services, Inc. |
Strengthening near well bore subterranean formations
|
US7059406B2
(en)
|
2003-08-26 |
2006-06-13 |
Halliburton Energy Services, Inc. |
Production-enhancing completion methods
|
US7036597B2
(en)
*
|
2003-08-28 |
2006-05-02 |
Halliburton Energy Services, Inc. |
Systems and methods for treating a subterranean formation using carbon dioxide and a crosslinked fracturing fluid
|
US7032667B2
(en)
|
2003-09-10 |
2006-04-25 |
Halliburtonn Energy Services, Inc. |
Methods for enhancing the consolidation strength of resin coated particulates
|
US7345011B2
(en)
|
2003-10-14 |
2008-03-18 |
Halliburton Energy Services, Inc. |
Methods for mitigating the production of water from subterranean formations
|
US7063150B2
(en)
|
2003-11-25 |
2006-06-20 |
Halliburton Energy Services, Inc. |
Methods for preparing slurries of coated particulates
|
US8126689B2
(en)
*
|
2003-12-04 |
2012-02-28 |
Halliburton Energy Services, Inc. |
Methods for geomechanical fracture modeling
|
US7131493B2
(en)
|
2004-01-16 |
2006-11-07 |
Halliburton Energy Services, Inc. |
Methods of using sealants in multilateral junctions
|
US20050173116A1
(en)
|
2004-02-10 |
2005-08-11 |
Nguyen Philip D. |
Resin compositions and methods of using resin compositions to control proppant flow-back
|
US7211547B2
(en)
|
2004-03-03 |
2007-05-01 |
Halliburton Energy Services, Inc. |
Resin compositions and methods of using such resin compositions in subterranean applications
|
US7063151B2
(en)
|
2004-03-05 |
2006-06-20 |
Halliburton Energy Services, Inc. |
Methods of preparing and using coated particulates
|
US7541318B2
(en)
|
2004-05-26 |
2009-06-02 |
Halliburton Energy Services, Inc. |
On-the-fly preparation of proppant and its use in subterranean operations
|
US7299875B2
(en)
|
2004-06-08 |
2007-11-27 |
Halliburton Energy Services, Inc. |
Methods for controlling particulate migration
|
US7073581B2
(en)
|
2004-06-15 |
2006-07-11 |
Halliburton Energy Services, Inc. |
Electroconductive proppant compositions and related methods
|
US7255169B2
(en)
|
2004-09-09 |
2007-08-14 |
Halliburton Energy Services, Inc. |
Methods of creating high porosity propped fractures
|
US7281580B2
(en)
|
2004-09-09 |
2007-10-16 |
Halliburton Energy Services, Inc. |
High porosity fractures and methods of creating high porosity fractures
|
US7757768B2
(en)
|
2004-10-08 |
2010-07-20 |
Halliburton Energy Services, Inc. |
Method and composition for enhancing coverage and displacement of treatment fluids into subterranean formations
|
US7281581B2
(en)
|
2004-12-01 |
2007-10-16 |
Halliburton Energy Services, Inc. |
Methods of hydraulic fracturing and of propping fractures in subterranean formations
|
US7398825B2
(en)
|
2004-12-03 |
2008-07-15 |
Halliburton Energy Services, Inc. |
Methods of controlling sand and water production in subterranean zones
|
US7273099B2
(en)
|
2004-12-03 |
2007-09-25 |
Halliburton Energy Services, Inc. |
Methods of stimulating a subterranean formation comprising multiple production intervals
|
US7883740B2
(en)
|
2004-12-12 |
2011-02-08 |
Halliburton Energy Services, Inc. |
Low-quality particulates and methods of making and using improved low-quality particulates
|
US7491682B2
(en)
*
|
2004-12-15 |
2009-02-17 |
Bj Services Company |
Method of inhibiting or controlling formation of inorganic scales
|
US7334635B2
(en)
|
2005-01-14 |
2008-02-26 |
Halliburton Energy Services, Inc. |
Methods for fracturing subterranean wells
|
US7781380B2
(en)
*
|
2005-01-24 |
2010-08-24 |
Schlumberger Technology Corporation |
Methods of treating subterranean formations with heteropolysaccharides based fluids
|
US7334636B2
(en)
|
2005-02-08 |
2008-02-26 |
Halliburton Energy Services, Inc. |
Methods of creating high-porosity propped fractures using reticulated foam
|
US7318473B2
(en)
|
2005-03-07 |
2008-01-15 |
Halliburton Energy Services, Inc. |
Methods relating to maintaining the structural integrity of deviated well bores
|
US7448451B2
(en)
|
2005-03-29 |
2008-11-11 |
Halliburton Energy Services, Inc. |
Methods for controlling migration of particulates in a subterranean formation
|
US7673686B2
(en)
|
2005-03-29 |
2010-03-09 |
Halliburton Energy Services, Inc. |
Method of stabilizing unconsolidated formation for sand control
|
US7987908B2
(en)
*
|
2005-04-25 |
2011-08-02 |
Weatherford/Lamb, Inc. |
Well treatment using a progressive cavity pump
|
US7318474B2
(en)
|
2005-07-11 |
2008-01-15 |
Halliburton Energy Services, Inc. |
Methods and compositions for controlling formation fines and reducing proppant flow-back
|
US7926591B2
(en)
|
2006-02-10 |
2011-04-19 |
Halliburton Energy Services, Inc. |
Aqueous-based emulsified consolidating agents suitable for use in drill-in applications
|
US8613320B2
(en)
|
2006-02-10 |
2013-12-24 |
Halliburton Energy Services, Inc. |
Compositions and applications of resins in treating subterranean formations
|
US7819192B2
(en)
|
2006-02-10 |
2010-10-26 |
Halliburton Energy Services, Inc. |
Consolidating agent emulsions and associated methods
|
US7665517B2
(en)
|
2006-02-15 |
2010-02-23 |
Halliburton Energy Services, Inc. |
Methods of cleaning sand control screens and gravel packs
|
US7407010B2
(en)
|
2006-03-16 |
2008-08-05 |
Halliburton Energy Services, Inc. |
Methods of coating particulates
|
US20070293404A1
(en)
*
|
2006-06-15 |
2007-12-20 |
Hutchins Richard D |
Subterranean Treatment Methods using Methanol Containing Foams
|
US7500521B2
(en)
*
|
2006-07-06 |
2009-03-10 |
Halliburton Energy Services, Inc. |
Methods of enhancing uniform placement of a resin in a subterranean formation
|
US7673507B2
(en)
*
|
2007-01-04 |
2010-03-09 |
Halliburton Energy Services, Inc. |
Real time viscometer
|
US7934557B2
(en)
|
2007-02-15 |
2011-05-03 |
Halliburton Energy Services, Inc. |
Methods of completing wells for controlling water and particulate production
|
US8697610B2
(en)
*
|
2007-05-11 |
2014-04-15 |
Schlumberger Technology Corporation |
Well treatment with complexed metal crosslinkers
|
WO2008147241A1
(en)
|
2007-05-30 |
2008-12-04 |
Schlumberger Canada Limited |
Method of propping agent delivery to the well
|
US20090087912A1
(en)
*
|
2007-09-28 |
2009-04-02 |
Shlumberger Technology Corporation |
Tagged particles for downhole application
|
US20090087911A1
(en)
*
|
2007-09-28 |
2009-04-02 |
Schlumberger Technology Corporation |
Coded optical emission particles for subsurface use
|
US7832257B2
(en)
|
2007-10-05 |
2010-11-16 |
Halliburton Energy Services Inc. |
Determining fluid rheological properties
|
US7950455B2
(en)
*
|
2008-01-14 |
2011-05-31 |
Baker Hughes Incorporated |
Non-spherical well treating particulates and methods of using the same
|
US8853135B2
(en)
*
|
2008-05-07 |
2014-10-07 |
Schlumberger Technology Corporation |
Method for treating wellbore in a subterranean formation with high density brines and complexed metal crosslinkers
|
US8439116B2
(en)
|
2009-07-24 |
2013-05-14 |
Halliburton Energy Services, Inc. |
Method for inducing fracture complexity in hydraulically fractured horizontal well completions
|
US8960292B2
(en)
*
|
2008-08-22 |
2015-02-24 |
Halliburton Energy Services, Inc. |
High rate stimulation method for deep, large bore completions
|
US8205675B2
(en)
*
|
2008-10-09 |
2012-06-26 |
Baker Hughes Incorporated |
Method of enhancing fracture conductivity
|
US9016376B2
(en)
|
2012-08-06 |
2015-04-28 |
Halliburton Energy Services, Inc. |
Method and wellbore servicing apparatus for production completion of an oil and gas well
|
US8887803B2
(en)
|
2012-04-09 |
2014-11-18 |
Halliburton Energy Services, Inc. |
Multi-interval wellbore treatment method
|
US9796918B2
(en)
*
|
2013-01-30 |
2017-10-24 |
Halliburton Energy Services, Inc. |
Wellbore servicing fluids and methods of making and using same
|
US8631872B2
(en)
*
|
2009-09-24 |
2014-01-21 |
Halliburton Energy Services, Inc. |
Complex fracturing using a straddle packer in a horizontal wellbore
|
US7762329B1
(en)
|
2009-01-27 |
2010-07-27 |
Halliburton Energy Services, Inc. |
Methods for servicing well bores with hardenable resin compositions
|
US8104539B2
(en)
*
|
2009-10-21 |
2012-01-31 |
Halliburton Energy Services Inc. |
Bottom hole assembly for subterranean operations
|
US8474313B2
(en)
*
|
2010-03-23 |
2013-07-02 |
Saudi Arabian Oil Company |
Process for testing a sample of hydraulic fracturing fluid
|
US9010430B2
(en)
|
2010-07-19 |
2015-04-21 |
Baker Hughes Incorporated |
Method of using shaped compressed pellets in treating a well
|
US10822536B2
(en)
|
2010-07-19 |
2020-11-03 |
Baker Hughes, A Ge Company, Llc |
Method of using a screen containing a composite for release of well treatment agent into a well
|
US9976070B2
(en)
|
2010-07-19 |
2018-05-22 |
Baker Hughes, A Ge Company, Llc |
Method of using shaped compressed pellets in well treatment operations
|
US10352145B2
(en)
|
2011-03-11 |
2019-07-16 |
Schlumberger Technology Corporation |
Method of calibrating fracture geometry to microseismic events
|
US9618652B2
(en)
|
2011-11-04 |
2017-04-11 |
Schlumberger Technology Corporation |
Method of calibrating fracture geometry to microseismic events
|
US8664168B2
(en)
|
2011-03-30 |
2014-03-04 |
Baker Hughes Incorporated |
Method of using composites in the treatment of wells
|
CN104040376B
(zh)
|
2011-10-11 |
2017-10-24 |
普拉德研究及开发股份有限公司 |
用于执行增产作业的系统和方法
|
RU2575947C2
(ru)
*
|
2011-11-04 |
2016-02-27 |
Шлюмбергер Текнолоджи Б.В. |
Моделирование взаимодействия трещин гидравлического разрыва в системах сложных трещин
|
US10422208B2
(en)
|
2011-11-04 |
2019-09-24 |
Schlumberger Technology Corporation |
Stacked height growth fracture modeling
|
US10041327B2
(en)
|
2012-06-26 |
2018-08-07 |
Baker Hughes, A Ge Company, Llc |
Diverting systems for use in low temperature well treatment operations
|
US9920610B2
(en)
|
2012-06-26 |
2018-03-20 |
Baker Hughes, A Ge Company, Llc |
Method of using diverter and proppant mixture
|
US8342246B2
(en)
|
2012-01-26 |
2013-01-01 |
Expansion Energy, Llc |
Fracturing systems and methods utilyzing metacritical phase natural gas
|
US9316098B2
(en)
|
2012-01-26 |
2016-04-19 |
Expansion Energy Llc |
Non-hydraulic fracturing and cold foam proppant delivery systems, methods, and processes
|
CA3190714A1
(en)
|
2012-05-14 |
2013-11-14 |
Step Energy Services Ltd. |
Hybrid lpg frac
|
US11111766B2
(en)
|
2012-06-26 |
2021-09-07 |
Baker Hughes Holdings Llc |
Methods of improving hydraulic fracture network
|
MX366098B
(es)
|
2012-06-26 |
2019-06-27 |
Baker Hughes Inc |
Metodo para usar acidos ftalico y tereftalico y derivados de los mismos en operaciones de tratamiento de pozos.
|
CN104508079A
(zh)
|
2012-06-26 |
2015-04-08 |
贝克休斯公司 |
改进水力裂缝网络的方法
|
US10988678B2
(en)
|
2012-06-26 |
2021-04-27 |
Baker Hughes, A Ge Company, Llc |
Well treatment operations using diverting system
|
US9133700B2
(en)
|
2012-11-30 |
2015-09-15 |
General Electric Company |
CO2 fracturing system and method of use
|
US9429006B2
(en)
|
2013-03-01 |
2016-08-30 |
Baker Hughes Incorporated |
Method of enhancing fracture conductivity
|
BR112015025644A2
(pt)
*
|
2013-04-08 |
2017-07-18 |
Expansion Energy Llc |
sistemas, métodos e processos de fraturamento não hidráulico e de distribuição de propante de espuma fria
|
US8733442B1
(en)
*
|
2013-05-10 |
2014-05-27 |
Seawater Technologies, LLC |
Seawater transportation for utilization in hydrocarbon-related processes including rail transportation
|
US10125592B2
(en)
*
|
2013-08-08 |
2018-11-13 |
Halliburton Energy Services, Inc. |
Methods and systems for treatment of subterranean formations
|
US9587167B2
(en)
*
|
2013-10-18 |
2017-03-07 |
Chemical Flooding Technologies, LLC |
For storage of surfactant concentrate solution
|
WO2015112996A1
(en)
|
2014-01-27 |
2015-07-30 |
The Regents Of The University Of Michigan |
Interrogating subterranean hydraulic fractures using magnetoelastic resonators
|
CA2955926C
(en)
|
2014-07-23 |
2018-11-20 |
Baker Hughes Incorporated |
Composite comprising well treatment agent and/or a tracer adhered onto a calcined substrate of a metal oxide coated core and a method of using the same
|
WO2016025936A1
(en)
|
2014-08-15 |
2016-02-18 |
Baker Hughes Incorporated |
Diverting systems for use in well treatment operations
|
US9914872B2
(en)
|
2014-10-31 |
2018-03-13 |
Chevron U.S.A. Inc. |
Proppants
|
CN105986802B
(zh)
*
|
2015-02-13 |
2018-12-25 |
中国石油天然气股份有限公司 |
井下压裂的方法
|
US10774632B2
(en)
|
2015-12-02 |
2020-09-15 |
Halliburton Energy Services, Inc. |
Method of fracturing a formation using a combination of spacer fluid and proppant slurry
|
US10641083B2
(en)
|
2016-06-02 |
2020-05-05 |
Baker Hughes, A Ge Company, Llc |
Method of monitoring fluid flow from a reservoir using well treatment agents
|
US10413966B2
(en)
|
2016-06-20 |
2019-09-17 |
Baker Hughes, A Ge Company, Llc |
Nanoparticles having magnetic core encapsulated by carbon shell and composites of the same
|
US11365617B1
(en)
|
2017-01-24 |
2022-06-21 |
Devon Energy Corporation |
Systems and methods for controlling fracturing operations using monitor well pressure
|
US11028679B1
(en)
|
2017-01-24 |
2021-06-08 |
Devon Energy Corporation |
Systems and methods for controlling fracturing operations using monitor well pressure
|
US11254861B2
(en)
|
2017-07-13 |
2022-02-22 |
Baker Hughes Holdings Llc |
Delivery system for oil-soluble well treatment agents and methods of using the same
|
US12060523B2
(en)
|
2017-07-13 |
2024-08-13 |
Baker Hughes Holdings Llc |
Method of introducing oil-soluble well treatment agent into a well or subterranean formation
|
US11254850B2
(en)
|
2017-11-03 |
2022-02-22 |
Baker Hughes Holdings Llc |
Treatment methods using aqueous fluids containing oil-soluble treatment agents
|
CN109138959B
(zh)
*
|
2018-08-07 |
2020-06-19 |
中国石油大学(北京) |
一种超临界co2聚能压裂方法
|
CN109209330A
(zh)
*
|
2018-11-16 |
2019-01-15 |
中国石油大学(北京) |
一种造地层裂缝的方法及装置
|
WO2020251578A1
(en)
|
2019-06-13 |
2020-12-17 |
Halliburton Energy Services, Inc. |
Multi-component downhole treatment
|
US10989035B2
(en)
*
|
2019-06-20 |
2021-04-27 |
Halliburton Energy Services, Inc. |
Proppant ramp-up for cluster efficiency
|
CN110541696A
(zh)
*
|
2019-07-15 |
2019-12-06 |
河南理工大学 |
一种油气井二氧化碳爆破-水力压裂改造增产方法
|
CN110485985B
(zh)
*
|
2019-08-28 |
2021-10-29 |
太原理工大学 |
一种提高煤层压裂效果的方法
|
US11319790B2
(en)
|
2019-10-30 |
2022-05-03 |
Halliburton Energy Services, Inc. |
Proppant ramp up decision making
|
US10961444B1
(en)
|
2019-11-01 |
2021-03-30 |
Baker Hughes Oilfield Operations Llc |
Method of using coated composites containing delayed release agent in a well treatment operation
|
CN113027407B
(zh)
*
|
2021-04-21 |
2022-04-05 |
太原理工大学 |
一种泡沫-气体复合分段压裂地层方法
|
US11859490B2
(en)
|
2021-08-19 |
2024-01-02 |
Devon Energy Corporation |
Systems and methods for monitoring fracturing operations using monitor well flow
|
CN113563860B
(zh)
*
|
2021-08-22 |
2022-04-26 |
大庆永铸石油技术开发有限公司 |
页岩油藏用滑溜水压裂液体系制备方法及其泵注方法
|
CN116044366B
(zh)
*
|
2022-12-28 |
2023-09-22 |
捷贝通石油技术集团股份有限公司 |
油气储层射孔、压裂及生产阶段长效示踪实时监测方法
|