[go: up one dir, main page]

BE1031199B1 - Additional reinforcement device for a climbing formwork system with a large upward tilt angle resistant to the self-weight of the concrete - Google Patents

Additional reinforcement device for a climbing formwork system with a large upward tilt angle resistant to the self-weight of the concrete Download PDF

Info

Publication number
BE1031199B1
BE1031199B1 BE20245196A BE202405196A BE1031199B1 BE 1031199 B1 BE1031199 B1 BE 1031199B1 BE 20245196 A BE20245196 A BE 20245196A BE 202405196 A BE202405196 A BE 202405196A BE 1031199 B1 BE1031199 B1 BE 1031199B1
Authority
BE
Belgium
Prior art keywords
formwork system
climbing formwork
support
steel profile
self
Prior art date
Application number
BE20245196A
Other languages
French (fr)
Other versions
BE1031199A1 (en
Inventor
Xuejiang Chen
Hong Chen
Huoyong Cao
Lianfang Li
Wenrong Ma
Chao Hu
Yong Xu
Jie Wang
Long Chen
Yong Lan
Xiangjun Zeng
Guang Luo
Zhen Yang
Yue He
Ji Ma
Menghua Li
Biao Li
Hai Fan
Zhaojia Chen
Gui Zhou
Original Assignee
No 3 Eng Company Of China Railway No 8 Eng Group
China Railway No 8 Eng Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 3 Eng Company Of China Railway No 8 Eng Group, China Railway No 8 Eng Group filed Critical No 3 Eng Company Of China Railway No 8 Eng Group
Publication of BE1031199A1 publication Critical patent/BE1031199A1/en
Application granted granted Critical
Publication of BE1031199B1 publication Critical patent/BE1031199B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3247Storey high safety barrier hung from the facade and sliding up from level to level as work progresses

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

La présente invention concerne le domaine de la construction de bâtiments et divulgue spécifiquement un dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton ; comprenant une pièce d'ancrage préintégrée préinstallée dans le segment déjà construit et disposée du même côté que le système de coffrage grimpant, un profilé d'acier de liaison situé à l'extérieur du système de coffrage grimpant et connecté au système de coffrage grimpant, et une pièce de connexion de support située près du segment déjà construit d'un côté et connectée à la pièce d'ancrage préintégrée. Cette invention permet de transférer efficacement la charge au segment déjà construit, évitant ainsi le transfert de la charge du béton au système de coffrage grimpant pendant le processus de construction, assurant ainsi la sécurité de la construction.The present invention relates to the field of building construction and specifically discloses a supplementary reinforcement device for a large upward tilt angle climbing formwork system resisting the self-weight of concrete; comprising a pre-embedded anchor piece pre-installed in the already constructed segment and arranged on the same side as the climbing formwork system, a connecting steel profile located outside the climbing formwork system and connected to the climbing formwork system, and a support connection piece located near the already constructed segment on one side and connected to the pre-embedded anchor piece. This invention can effectively transfer the load to the already constructed segment, thereby avoiding the transfer of the load of the concrete to the climbing formwork system during the construction process, thereby ensuring the safety of construction.

Description

Dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du bétonAdditional reinforcement device for a climbing formwork system with a large upward tilt angle resistant to the self-weight of the concrete

Domaine techniqueTechnical field

La présente invention concerne le domaine de la construction de bâtiments, et plus spécifiquement, un dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton.The present invention relates to the field of building construction, and more specifically, to an additional reinforcement device for a climbing formwork system with a large upward tilt angle resisting the self-weight of the concrete.

Technique antérieurePrior art

Avec le progrès de la société, les goûts esthétiques des gens pour les structures de ponts deviennent de plus en plus personnalisés, et la conception des ponts devient diversifiée. Pour la conception de la tour principale des ponts à haubans, l'angle d'inclinaison de l'espace de la tour devient de plus en plus grand. Ainsi, pour la construction du corps de la tour des ponts à haubans, la méthode de construction la plus mature à l'heure actuelle est l'utilisation de la construction par coffrage grimpant hydraulique, mais pour la construction du corps de la tour à grand angle d'inclinaison, en raison du poids propre important du béton lors du coulage des sections inclinées et du déplacement du centre de gravité, les exigences en matière de rigidité et de résistance du système de coffrage grimpant deviennent plus élevées. Si la totalité de la force due au poids propre est transférée au corps du coffrage grimpant, cela dépasserait la limite de conception des éléments du coffrage, donc un dispositif de — renfort supplémentaire résistant au poids propre du béton est conçu séparément sur la face vers le haut, qui résiste à la force due au poids propre du béton lors du coulage par l'intermédiaire de profilés d'acier de liaison, réduisant autant que possible le transfert de la charge due au poids propre du béton à la structure du corps du coffrage grimpant.With the progress of society, people's aesthetic tastes for bridge structures become more and more personalized, and the design of bridges becomes diversified. For the design of the main tower of cable-stayed bridges, the inclination angle of the tower space becomes larger and larger. Therefore, for the construction of the tower body of cable-stayed bridges, the most mature construction method at present is the use of hydraulic climbing formwork construction, but for the construction of the tower body with large inclination angle, due to the large self-weight of concrete when pouring inclined sections and the displacement of the center of gravity, the requirements for the rigidity and strength of the climbing formwork system become higher. If the entire self-weight force is transferred to the climbing formwork body, it would exceed the design limit of the formwork elements, so an additional reinforcement device resisting the self-weight of the concrete is designed separately on the upward face, which resists the self-weight force of the concrete during pouring through connecting steel profiles, reducing the transfer of the self-weight load of the concrete to the structure of the climbing formwork body as much as possible.

Dans la pratique, en plus de l'optimisation de la conception structurelle du système de coffrage grimpant, cela s'accompagne souvent de l'utilisation de plus de matériaux de coffrage grimpant en raison de l'augmentation des besoins en rigidité du système de coffrage grimpant, ce qui rend le coffrage grimpant plus lourd, augmente les coûts de construction et réduit considérablement la sécurité existante, présentant des risques de sécurité potentiels.In practice, in addition to optimizing the structural design of the climbing formwork system, it is often accompanied by the use of more climbing formwork materials due to the increase in the rigidity requirements of the climbing formwork system, which makes the climbing formwork heavier, increases construction costs, and greatly reduces the existing safety, posing potential safety hazards.

Exposé de l’inventionDisclosure of the invention

Le problème technique que la présente invention vise à résoudre est de fournir un dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton, qui, par l'intermédiaire d'un dispositif de profilés d'acier de liaison, transfère la charge au segment déjà construit, pouvant efficacement éviter le transfert de la charge du béton au système de coffrage grimpant pendant le processus de construction, assurant ainsi la sécurité de la construction.The technical problem which the present invention aims to solve is to provide a supplementary reinforcement device for a large upward tilt angle climbing formwork system resisting the self-weight of concrete, which, through a connecting steel profile device, transfers the load to the already constructed segment, can effectively avoid the transfer of the load of the concrete to the climbing formwork system during the construction process, thereby ensuring the safety of construction.

La solution adoptée par la présente invention pour résoudre le problème technique est:The solution adopted by the present invention to solve the technical problem is:

Un dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton, dans lequel le système de coffrage grimpant est installé sur le côté extérieur du segment en cours de construction, le système de coffrage grimpant comprenant un système de coffrage grimpant et un système de coffrage grimpant hydraulique connecté au système de coffrage grimpant ; le dispositif de profilés d'acier de liaison comprend une pièce d'ancrage préintégrée préinstallée dans le segment déjà construit et disposée du même côté que le système de coffrage grimpant, un profilé d'acier de liaison situé à l'extérieur du système de coffrage grimpant et connecté au système de coffrage grimpant, et une pièce de connexion de support située près du segment déjà construit d'un côté et connectée à la pièce d'ancrage préintégrée.An additional reinforcement device for a climbing formwork system with a large upward tilt angle resisting the self-weight of concrete, in which the climbing formwork system is installed on the outer side of the segment under construction, the climbing formwork system comprising a climbing formwork system and a hydraulic climbing formwork system connected to the climbing formwork system; the connecting steel profile device comprises a pre-embedded anchor piece pre-installed in the already constructed segment and arranged on the same side as the climbing formwork system, a connecting steel profile located outside the climbing formwork system and connected to the climbing formwork system, and a support connection piece located near the already constructed segment on one side and connected to the pre-embedded anchor piece.

Lors de la construction du segment en cours de construction, un ossature sera installée dans la zone de construction du segment en cours de construction pour soutenir l'acier d'armature à ce stade, puis le système de coffrage grimpant sera installé, et plusieurs groupes de profilés d'acier de liaison seront installés à l'extérieur du système de coffrage grimpant, par plusieurs groupes de pièces de connexion de support configurées pour correspondre un à un aux profilés d'acier de liaison, ils seront connectés aux pièces d'ancrage préintégrées préinstallées sur le segment déjà construit en nombre égal aux pièces de connexion de support ; en même temps, le haut du profilé d'acier de liaison sera connecté à l'ossature ; après l'achèvement du coulage du béton du segment en cours de construction, la charge due au poids propre du béton de ce segment exercera une force sur le système de coffrage grimpant, les profilés d'acier de liaison étant connectés à l'ossature et au segment déjà construit, transférant ainsi cette force de charge au segment déjà construit ; évitant ainsi le transfert de la charge du béton au système de coffrage grimpant hydraulique pendant le processus de construction, assurant la sécurité de la construction.When constructing the segment under construction, a frame will be installed in the construction area of the segment under construction to support the reinforcing steel at this stage, and then the climbing formwork system will be installed, and several groups of connecting steel profiles will be installed outside the climbing formwork system, by several groups of supporting connection pieces configured to match the connecting steel profiles one by one, they will be connected to the pre-embedded anchor pieces pre-installed on the already constructed segment in number equal to the supporting connection pieces; at the same time, the top of the connecting steel profile will be connected to the frame; after the completion of the concrete pouring of the segment under construction, the load due to the self-weight of the concrete of this segment will exert a force on the climbing formwork system, the connecting steel profiles being connected to the frame and the already constructed segment, thereby transferring this load force to the already constructed segment; thus avoiding the transfer of the concrete load to the hydraulic climbing formwork system during the construction process, ensuring construction safety.

Dans certains modes de réalisation possibles, afin de réaliser efficacement le soutien et la résistance au tirage des profilés d'acier de liaison ;In some possible embodiments, in order to effectively achieve the support and resistance to pulling of the connecting steel profiles;

La pièce d'ancrage préintégrée est en deux groupes, comprenant une pièce d'ancrage de support connectée au bas de la pièce de connexion de support, et une pièce d'ancrage anti-arrachement située entre la pièce d'ancrage de support et le segment en cours de construction.The pre-embedded anchor piece is in two groups, including a support anchor piece connected to the bottom of the support connection piece, and an anti-pullout anchor piece located between the support anchor piece and the segment under construction.

Dans certains modes de réalisation possibles,In some possible embodiments,

La structure de la pièce d'ancrage de support et de la pièce d'ancrage anti-arrachement est la même, toutes deux étant des cônes d'escalade, comprenant une vis d'ancrage préinstallée dans le segment déjà construit, un cône monté sur la vis, et un boulon de blocage vissé coaxialement au cône ; la grande surface du cône est sur le même plan que la surface extérieure du segment déjà construit.The structure of the support anchor piece and the anti-pullout anchor piece is the same, both being climbing cones, comprising an anchor screw pre-installed in the already constructed segment, a cone mounted on the screw, and a locking bolt screwed coaxially to the cone; the large surface of the cone is on the same plane as the outer surface of the already constructed segment.

Dans certains modes de réalisation possibles, afin de réaliser efficacement la connexion de la pièce de connexion de support respectivement à la pièce d'ancrage de support et à la pièce d'ancrage anti-arrachement ;In some possible embodiments, in order to effectively achieve the connection of the support connection piece respectively to the support anchor piece and the anti-tear anchor piece;

La pièce de connexion de support comprend un profilé d'acier de support connecté au bas du profilé d'acier de liaison par des boulons à bride, et deux groupes de supports installés sur le profilé d'acier de support et connectés respectivement à la pièce d'ancrage de support et à la pièce d'ancrage anti-arrachement.The supporting connecting piece comprises a supporting steel profile connected to the bottom of the connecting steel profile by flange bolts, and two groups of brackets installed on the supporting steel profile and connected to the supporting anchor piece and the anti-pull anchor piece respectively.

Dans certains modes de réalisation possibles, afin que les deux groupes de supports puissent réaliser le soutien et la résistance au tirage ;In some possible embodiments, so that both groups of supports can provide support and resistance to pulling;

Les deux groupes de supports comprennent un support de suspension situé à l'extrémité du profilé d'acier de support éloignée du profilé d'acier de liaison, et un support anti-arrachement situé entre le support de suspension et le profilé d'acier de liaison.The two groups of brackets include a suspension bracket located at the end of the support steel profile away from the connecting steel profile, and an anti-tear bracket located between the suspension bracket and the connecting steel profile.

Dans certains modes de réalisation possibles,In some possible embodiments,

Le support de suspension comprend une base connectée au bas du profilé d'acier de support ; un trou traversant adapté pour être installé avec un boulon de blocage est disposé sur la base.The suspension bracket comprises a base connected to the bottom of the supporting steel profile; a through hole suitable for being installed with a locking bolt is provided on the base.

Dans certains modes de réalisation possibles,In some possible embodiments,

Le support anti-arrachement comprend une base située entre le profilé d'acier de support et le segment déjà construit, et une tige de connexion traversant le profilé d'acier de support et connectée à la base ; un trou traversant adapté pour être utilisé avec un boulon de blocage est disposé sur la base.The anti-tear bracket comprises a base located between the supporting steel profile and the already constructed segment, and a connecting rod passing through the supporting steel profile and connected to the base; a through hole suitable for use with a locking bolt is provided on the base.

Dans certains modes de réalisation possibles, afin que la connexion du profilé d'acier de liaison à l'ossature puisse efficacement réaliser le transfert de la charge due au poids propre du béton au segment déjà construit ;In some possible embodiments, in order that the connection of the connecting steel profile to the frame can effectively achieve the transfer of the load due to the self-weight of the concrete to the already constructed segment;

Une tige de traction est installée sur le haut du profilé d'acier de liaison, l'axe de la tige de traction formant un angle A avec la direction horizontale, À est entre 25 et 45°.A pull rod is installed on the top of the connecting steel profile, the axis of the pull rod forming an angle A with the horizontal direction, A is between 25 and 45°.

Dans certains modes de réalisation possibles,In some possible embodiments,

La pièce d'ancrage de support et la pièce d'ancrage anti-arrachement sont toutes deux en deux groupes et sont configurées pour correspondre respectivement au support de suspension et au support anti-arrachement.The support anchor piece and the anti-tear anchor piece are both in two groups and are configured to correspond to the suspension bracket and the anti-tear bracket respectively.

Par rapport à l'état de la technique, les effets bénéfiques de la présente invention :Compared to the prior art, the beneficial effects of the present invention:

Dans la présente invention, la connexion des profilés d'acier de liaison respectivement au segment déjà construit et à l'ossature, permet, après l'achèvement du coulage du béton du segment en cours de construction, de transférer la charge due au poids propre du béton au segment déjà construit, évitant ainsi que la charge due au poids propre du béton agisse directement sur le système de coffrage grimpant par rapport à l'état de la technique ;In the present invention, the connection of the connecting steel profiles respectively to the already constructed segment and to the frame, allows, after completion of the concrete pouring of the segment under construction, to transfer the load due to the self-weight of the concrete to the already constructed segment, thus avoiding that the load due to the self-weight of the concrete acts directly on the climbing formwork system compared to the state of the art;

Dans la présente invention, en préinstallant respectivement dans le segment déjà construit la pièce d'ancrage anti-arrachement et la pièce d'ancrage de support, une connexion de soutien efficace de la pièce de connexion de support est réalisée, — réalisant ainsi le soutien et la fixation du profilé d'acier de liaison ;In the present invention, by pre-installing respectively in the already constructed segment the anti-tearing anchor piece and the support anchor piece, an effective support connection of the support connection piece is realized, — thereby realizing the support and fixing of the connecting steel profile;

La structure de la présente invention est simple et pratique.The structure of the present invention is simple and practical.

Brève description des dessinsBrief description of the drawings

La figure 1 est un schéma structurel de la présente invention ; 5 La figure 2 est un schéma agrandi de la partie A de la figure 1 ;Figure 1 is a structural diagram of the present invention; Figure 2 is an enlarged diagram of part A of Figure 1;

La figure 3 est un schéma agrandi de la partie B de la figure 1 ;Figure 3 is an enlarged diagram of part B of Figure 1;

La figure 4 est un schéma d'utilisation de la présente invention ;Figure 4 is a diagram of use of the present invention;

Signes de référence : 10, segment déjà construit ; 20, segment en cours de construction ; 30, système de coffrage grimpant ; 40, ossature ; 50, système de coffrage grimpant hydraulique ; 1, pièce d'ancrage préintégrée ; 11, pièce d'ancrage de support ; 12, pièce d'ancrage anti-arrachement ; 2, profilé d'acier de liaison ; 3, pièce de connexion de support ; 31, profilé d'acier de support ; 32, support de suspension ; 33, support anti-arrachement.Reference signs: 10, segment already constructed; 20, segment under construction; 30, climbing formwork system; 40, framework; 50, hydraulic climbing formwork system; 1, pre-integrated anchor piece; 11, support anchor piece; 12, anti-pull-out anchor piece; 2, connecting steel profile; 3, support connection piece; 31, support steel profile; 32, suspension bracket; 33, anti-pull-out bracket.

Description détaillée des modes de réalisationDetailed description of the embodiments

Dans la présente invention, sauf indication contraire explicite et limitative, les termes tels que "installation", "connexion", "fixation", etc, doivent être compris au sens large, par exemple, ils peuvent être une connexion fixe ou une connexion détachable, ou intégrée ; ils peuvent être directement connectés ou indirectement connectés via un intermédiaire, peuvent être la communication interne entre deux éléments ou la relation d'interaction entre deux éléments. Les termes "premier", "deuxième" et des termes similaires dans cette demande ne désignent pas un ordre, une quantité ou une importance spécifiques, mais sont utilisés pour distinguer différents composants. De même, les termes "un" ou "une" et similaires ne désignent pas une limitation de quantité, mais indiquent l'existence d'au moins un. Dans les modes de réalisation de cette demande, "et/ou" décrit une relation d'association entre des objets associés, indiquant qu'il peut exister trois relations, par exemple, A et/ou B, peut signifier : A existe seul, À et B existent simultanément, B existe seul. Dans la description des modes de réalisation de cette demande, sauf indication contraire, le sens de "plusieurs" signifie deux ou plus, par exemple, plusieurs colonnes de positionnement signifient deux ou plus de ces colonnes. Pour ceux dans le domaine de l'art, les termes ci-dessus peuvent être compris dans la présente invention selon des situations spécifiques.In the present invention, unless explicitly and limitingly indicated otherwise, terms such as "installation", "connection", "fixing", etc., should be understood in a broad sense, for example, they may be a fixed connection or a detachable connection, or integrated; they may be directly connected or indirectly connected via an intermediary, may be the internal communication between two elements or the interaction relationship between two elements. The terms "first", "second" and similar terms in this application do not denote a specific order, quantity or importance, but are used to distinguish different components. Similarly, the terms "one" or "an" and the like do not denote a limitation of quantity, but indicate the existence of at least one. In the embodiments of this application, "and/or" describes an association relationship between associated objects, indicating that there may be three relationships, for example, A and/or B, may mean: A exists alone, A and B exist simultaneously, B exists alone. In describing the embodiments of this application, unless otherwise indicated, the meaning of "multiple" means two or more, for example, multiple positioning columns means two or more such columns. For those in the art, the above terms may be understood in the present invention according to specific situations.

La présente invention est décrite en détail ci-dessous.The present invention is described in detail below.

Comme illustré dans les figures 1 à 4 :As illustrated in Figures 1 to 4:

Un dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton, dans lequel le système de coffrage grimpant est installé sur le côté extérieur du segment en cours de construction 20, le système de coffrage grimpant comprenant un système de coffrage grimpant 30 et un système de coffrage grimpant hydraulique 50 connecté au système de coffrage grimpant 30 ; le dispositif de profilés d'acier de liaison comprend une pièce d'ancrage préintégrée 1 préinstallée dans le segment déjà construit 10 et disposée du même côté que le système de coffrage grimpant 30, un profilé d'acier de liaison 2 situé à l'extérieur du système de coffrage grimpant 30 et connecté au système de coffrage grimpant 30, et une pièce de connexion de support 3 située près du segment déjà construit 10 d'un côté et connectée à la pièce d'ancrage préintégrée 1 ; le haut du profilé d'acier de liaison 2 est connecté à l'ossature 40.An additional reinforcement device for a climbing formwork system with a large upward tilt angle resisting the self-weight of concrete, wherein the climbing formwork system is installed on the outer side of the segment under construction 20, the climbing formwork system comprising a climbing formwork system 30 and a hydraulic climbing formwork system 50 connected to the climbing formwork system 30; the connecting steel profile device comprises a pre-embedded anchor piece 1 pre-installed in the already constructed segment 10 and arranged on the same side as the climbing formwork system 30, a connecting steel profile 2 located outside the climbing formwork system 30 and connected to the climbing formwork system 30, and a support connection piece 3 located near the already constructed segment 10 on one side and connected to the pre-embedded anchor piece 1; the top of the connecting steel profile 2 is connected to the frame 40.

Lors de la construction du segment en cours de construction 20, un ossature 40 sera installée dans la zone de construction du segment en cours de construction 20 pour soutenir l'acier d'armature à ce stade, puis le système de coffrage grimpant 30 sera installé, et plusieurs groupes de profilés d'acier de liaison 2 seront installés à l'extérieur du système de coffrage grimpant 30, par plusieurs groupes de pièces de connexion de support 3 configurées pour correspondre un à un aux profilés d'acier de liaison 2, ils seront connectés aux pièces d'ancrage préintégrées 1 préinstallées sur le segment déjà construit 10 en nombre égal aux pièces de connexion de support 3 ; en même temps, le haut du profilé d'acier de liaison 2 sera connecté à l'ossature 40 ; après l'achèvement du coulage du béton du segment en cours de construction 20, la charge due au poids propre du béton de ce segment exercera une force sur le système de coffrage grimpant 30, les profilés d'acier de liaison 2 étant connectés à l'ossature 40 et au segment déjà construit 10, transférant ainsi cette force de charge au segment déjà construit 10 ; évitant ainsi le transfert de la charge du béton au système de coffrage — grimpant hydraulique 50 pendant le processus de construction, assurant la sécurité de la construction.When constructing the under-construction segment 20, a frame 40 will be installed in the construction area of the under-construction segment 20 to support the reinforcing steel at this stage, and then the climbing formwork system 30 will be installed, and several groups of connecting steel profiles 2 will be installed outside the climbing formwork system 30, by several groups of supporting connection pieces 3 configured to correspond one by one to the connecting steel profiles 2, they will be connected to the pre-embedded anchor pieces 1 pre-installed on the already constructed segment 10 in number equal to the supporting connection pieces 3; at the same time, the top of the connecting steel profile 2 will be connected to the frame 40; after the completion of the concrete pouring of the segment under construction 20, the load due to the self-weight of the concrete of this segment will exert a force on the climbing formwork system 30, the connecting steel profiles 2 being connected to the frame 40 and the already constructed segment 10, thereby transferring this load force to the already constructed segment 10; thereby avoiding the transfer of the load of the concrete to the hydraulic climbing formwork system 50 during the construction process, ensuring the safety of the construction.

Dans certains modes de réalisation possibles, afin de réaliser efficacement le soutien et la résistance au tirage des profilés d'acier de liaison 2 ;In some possible embodiments, in order to effectively achieve the support and resistance to pulling of the connecting steel profiles 2;

La pièce d'ancrage préintégrée 1 est en deux groupes, comprenant une pièce d'ancrage de support 11 connectée au bas de la pièce de connexion de support 3, et une pièce d'ancrage anti-arrachement 12 située entre la pièce d'ancrage de support 11 et le segment en cours de construction 20.The pre-integrated anchor piece 1 is in two groups, comprising a support anchor piece 11 connected to the bottom of the support connection piece 3, and an anti-pullout anchor piece 12 located between the support anchor piece 11 and the segment under construction 20.

La pièce d'ancrage de support 11 sert à soutenir le profilé d'acier de liaison 2, et la pièce d'ancrage anti-arrachement 12 agit comme un élément de traction, ayant une bonne capacité de résistance à l'arrachement.The supporting anchor piece 11 serves to support the connecting steel profile 2, and the anti-pull-out anchor piece 12 acts as a tensile member, having good pull-out resistance capability.

Dans certains modes de réalisation possibles,In some possible embodiments,

La structure de la pièce d'ancrage de support 11 et de la pièce d'ancrage anti-arrachement 12 est la même, toutes deux étant des cônes d'escalade, comprenant une vis d'ancrage préinstallée dans le segment déjà construit 10, un cône monté sur la vis, et un boulon de blocage vissé coaxialement au cône ; la grande surface du cône est sur le même plan que la surface extérieure du segment déjà construit 10.The structure of the support anchor 11 and the anti-tear anchor 12 is the same, both being climbing cones, comprising an anchor screw pre-installed in the already constructed segment 10, a cone mounted on the screw, and a locking bolt screwed coaxially to the cone; the large surface of the cone is on the same plane as the outer surface of the already constructed segment 10.

La pièce d'ancrage de support 11 et la pièce d'ancrage anti-arrachement 12 comprennent chacune une vis d'ancrage préinstallée dans le segment déjà construit 10, près du côté du profilé d'acier de liaison 2, le cône étant monté sur la vis d'ancrage, l'axe du cône étant perpendiculaire à la surface extérieure du segment déjà construit 10 près du côté du profilé d'acier de liaison 2 ; le boulon de blocage est utilisé pour connecter la pièce de connexion de support 3 à la pièce d'ancrage de support 11 ou à la pièce d'ancrage anti-arrachement 12 correspondante.The support anchor piece 11 and the anti-tear anchor piece 12 each comprise an anchor screw pre-installed in the already constructed segment 10, near the side of the connecting steel profile 2, the cone being mounted on the anchor screw, the axis of the cone being perpendicular to the outer surface of the already constructed segment 10 near the side of the connecting steel profile 2; the locking bolt is used to connect the support connection piece 3 to the support anchor piece 11 or the corresponding anti-tear anchor piece 12.

Dans certains modes de réalisation possibles, afin de réaliser efficacement la connexion de la pièce de connexion de support 3 à la pièce d'ancrage de support 11 et à la pièce d'ancrage anti-arrachement 12 ;In some possible embodiments, in order to effectively achieve the connection of the support connection piece 3 to the support anchor piece 11 and the anti-tear anchor piece 12;

La pièce de connexion de support 3 comprend un profilé d'acier de support 31 connecté au bas du profilé d'acier de liaison 2 par des boulons à bride, et deux groupes de supports installés sur le profilé d'acier de support 31 et connectés respectivement à la pièce d'ancrage de support 11 et à la pièce d'ancrage anti-arrachement 12.The support connecting piece 3 comprises a support steel profile 31 connected to the bottom of the connecting steel profile 2 by flange bolts, and two groups of brackets installed on the support steel profile 31 and connected to the support anchor piece 11 and the anti-tearing anchor piece 12 respectively.

Le profilé d'acier de support 31 est connecté au bas du profilé d'acier de liaison 2 et son côté proche du segment déjà construit 10 est sur le même plan, formant un espace entre le profilé d'acier de support 31 et le segment déjà construit 10, les deux groupes de supports étant situés dans cet espace et connectés respectivement à la piece d'ancrage de support 11 ou à la pièce d'ancrage anti-arrachement 12.The supporting steel profile 31 is connected to the bottom of the connecting steel profile 2 and its side close to the already constructed segment 10 is on the same plane, forming a space between the supporting steel profile 31 and the already constructed segment 10, the two groups of supports being located in this space and connected respectively to the supporting anchor piece 11 or the anti-tearing anchor piece 12.

Le dispositif est divisé en deux sections, la section inférieure (pièce de connexion de support 3) étant connectée au segment déjà construit 10 par la pièce d'ancrage préintégrée 1, et la section supérieure (profilé d'acier de liaison 2) étant connectée au système de coffrage grimpant 30. Lors du coffrage, il suffit de retirer les boulons à bride utilisés pour connecter le profilé d'acier de support 31 au profilé d'acier de liaison 2, et la section supérieure (profilé d'acier de liaison 2 connecté au système de coffrage grimpant 30) peut avancer ou reculer avec le système de coffrage grimpant 30. Lors de la construction cyclique des segments, il suffit de réinstaller le profilé d'acier de support 31, le support anti-arrachement 33 et le support de suspension 32.The device is divided into two sections, the lower section (support connecting piece 3) being connected to the already constructed segment 10 by the pre-embedded anchor piece 1, and the upper section (connecting steel profile 2) being connected to the climbing formwork system 30. When forming, it is sufficient to remove the flange bolts used to connect the supporting steel profile 31 to the connecting steel profile 2, and the upper section (connecting steel profile 2 connected to the climbing formwork system 30) can move forward or backward with the climbing formwork system 30. When cyclically constructing the segments, it is sufficient to reinstall the supporting steel profile 31, the anti-pull bracket 33 and the suspension bracket 32.

De plus, les profilés d'acier de liaison 2 et les profilés d'acier de support 31 sont fabriqués à partir de matériaux de profilés d'acier légers et pratiques ayant un certain coefficient de résistance à la flexion, tels que des profilés en U doubles ou des profilés en | ; ils sont connectés l'un à l'autre par des boulons à bride ;In addition, the connecting steel profiles 2 and the supporting steel profiles 31 are made of lightweight and practical steel profile materials having a certain bending strength coefficient, such as double U-profiles or | profiles; they are connected to each other by flange bolts;

Dans certains modes de réalisation possibles, afin que les deux groupes de supports puissent réaliser le soutien et la résistance au tirage ;In some possible embodiments, so that both groups of supports can provide support and resistance to pulling;

Comme illustré dans les figures 1 à 3, les deux groupes de supports comprennent un support de suspension 32 situé à l'extrémité du profilé d'acier de support 31 éloignée du profilé d'acier de liaison 2, et un support anti-arrachement 33 situé entre le support de suspension 32 et le profilé d'acier de liaison 2.As illustrated in FIGS. 1 to 3, the two groups of brackets comprise a suspension bracket 32 located at the end of the support steel profile 31 remote from the connecting steel profile 2, and an anti-tearing bracket 33 located between the suspension bracket 32 and the connecting steel profile 2.

Comme illustré dans la figure 2, le support de suspension 32 est connecté à la pièce d'ancrage de support 11, et le support anti-arrachement 33 est connecté à la pièce d'ancrage anti-arrachement 12 ; réalisant ainsi le soutien et la résistance au tirage du profilé d'acier de liaison 2, évitant une situation de soutien instable sous l'effet de la charge due au poids propre du béton.As shown in FIG. 2, the suspension bracket 32 is connected to the support anchor piece 11, and the anti-pull-out bracket 33 is connected to the anti-pull-out anchor piece 12; thereby realizing the support and pulling resistance of the connecting steel profile 2, avoiding an unstable support situation under the load due to the self-weight of the concrete.

Dans certains modes de réalisation possibles, afin de réaliser efficacement la connexion du support de suspension 32 au profilé d'acier de support 31 ; le support de suspension 32 comprend une base connectée au bas du profilé d'acier de support 31 ; un trou traversant adapté pour être installé avec un boulon de blocage est disposé sur la base.In some possible embodiments, in order to effectively realize the connection of the suspension bracket 32 to the support steel profile 31; the suspension bracket 32 comprises a base connected to the bottom of the support steel profile 31; a through hole suitable for being installed with a locking bolt is provided on the base.

Lors de la connexion, le trou traversant de la base est aligné coaxialement avec le trou fileté sur le cône, et la base agit sur le segment déjà construit 10, l'extrémité du boulon de blocage passant à travers le trou traversant pour entrer dans le trou fileté sur le cône, et après serrage, réalisant la connexion de la base avec la pièce d'ancrage de support 11.When connecting, the through hole of the base is coaxially aligned with the threaded hole on the cone, and the base acts on the already constructed segment 10, the end of the locking bolt passing through the through hole to enter the threaded hole on the cone, and after tightening, realizing the connection of the base with the support anchor piece 11.

Dans certains modes de réalisation possibles, afin de réaliser efficacement la connexion du support anti-arrachement 33 au profilé d'acier de support 31 ;In some possible embodiments, in order to effectively achieve the connection of the anti-tear bracket 33 to the supporting steel profile 31;

Comme illustré dans la figure 3, le support anti-arrachement 33 comprend une base située entre le profilé d'acier de support 31 et le segment déjà construit 10, et une tige de connexion traversant le profilé d'acier de support 31 et connectée à la base ; un trou traversant adapté pour être utilisé avec un boulon de blocage est disposé sur la base.As illustrated in FIG. 3, the anti-tear bracket 33 comprises a base located between the support steel profile 31 and the already constructed segment 10, and a connecting rod passing through the support steel profile 31 and connected to the base; a through hole suitable for use with a locking bolt is provided on the base.

L'extrémité de la tige de connexion passant à travers le profilé d'acier de support et connectée à la base, l'autre extrémité de la tige de connexion étant équipée d'un écrou à l'extérieur, après que le support anti-arrachement 33 soit connecté à la pièce d'ancrage anti-arrachement 12 par le boulon de blocage, l'écrou est utilisé pour fixer la tige de connexion.The end of the connecting rod passing through the supporting steel profile and connected to the base, the other end of the connecting rod being equipped with a nut outside, after the anti-tearing bracket 33 is connected to the anti-tearing anchor piece 12 by the locking bolt, the nut is used to fix the connecting rod.

Dans certains modes de réalisation possibles, afin que la connexion du profilé d'acier de liaison 2 à l'ossature 40 puisse efficacement réaliser le transfert de la charge due au poids propre du béton au segment déjà construit 10 ;In some possible embodiments, in order that the connection of the connecting steel profile 2 to the frame 40 can effectively achieve the transfer of the load due to the self-weight of the concrete to the already constructed segment 10;

Comme illustré dans la figure 1, une tige de traction est installée sur le haut du profilé d'acier de liaison 2, l'axe de la tige de traction formant un angle À avec la direction horizontale, À est entre 25 et 45°.As shown in Figure 1, a pull rod is installed on the top of the connecting steel profile 2, the axis of the pull rod forming an angle λ with the horizontal direction, λ is between 25 and 45°.

Dans certains modes de réalisation possibles, afin de garantir que chaque groupe de profilés d'acier de support 31 puisse être efficacement connecté au segment déjà construit 10 ;In some possible embodiments, in order to ensure that each group of supporting steel profiles 31 can be efficiently connected to the already constructed segment 10;

Les pièces d'ancrage de support 11 et les pièces d'ancrage anti-arrachement 12 sont toutes deux en deux groupes et sont configurées pour correspondre respectivement au support de suspension 32 et au support anti-arrachement 33.The support anchor pieces 11 and the anti-tear anchor pieces 12 are both in two groups and are configured to correspond to the suspension bracket 32 and the anti-tear bracket 33, respectively.

Comme illustré dans la figure 4, lors de l'utilisation, le profilé d'acier de liaison 2 est installé à l'extérieur du système de coffrage grimpant 30, le bas du profilé d'acier de liaison 2 est connecté au profilé d'acier de support 31, et le profilé d'acier de support 31 est connecté respectivement au support anti-arrachement 33 et au support de suspension 32, qui sont préinstallés dans le segment déjà construit 10, et en même temps, la tige de traction sur le haut du profilé d'acier de liaison 2 est connectée à l'ossature 40 par un câble, puis la construction du béton dans le segment en cours de construction 20 est effectuée ; après que la résistance du béton atteigne les exigences de décoffrage, le support anti-arrachement 33 et la pièce d'ancrage anti-arrachement 12, le support de suspension 32 et la pièce d'ancrage de support 11, le profilé d'acier de support 31 et le profilé d'acier de liaison 2, la tige de traction et l'ossature 40 sont séparés respectivement ; ensuite, le système de coffrage grimpant hydraulique 50 peut être utilisé pour élever le profilé d'acier de liaison 2 et le système de coffrage grimpant 30 jusqu'au prochain segment en cours de construction, pour effectuer la construction du prochain segment, jusqu'à ce que tous les segments soient complètement construits.As shown in FIG. 4, when in use, the connecting steel profile 2 is installed outside the climbing formwork system 30, the bottom of the connecting steel profile 2 is connected to the supporting steel profile 31, and the supporting steel profile 31 is respectively connected to the anti-pull bracket 33 and the suspension bracket 32, which are pre-installed in the already constructed segment 10, and at the same time, the pull rod on the top of the connecting steel profile 2 is connected to the frame 40 by a cable, and then the concrete construction in the segment under construction 20 is carried out; after the concrete strength reaches the formwork requirements, the anti-pull-out bracket 33 and the anti-pull-out anchor piece 12, the suspension bracket 32 and the support anchor piece 11, the support steel profile 31 and the connecting steel profile 2, the pull rod and the frame 40 are separated respectively; then, the hydraulic climbing formwork system 50 can be used to raise the connecting steel profile 2 and the climbing formwork system 30 to the next segment under construction, to carry out the construction of the next segment, until all the segments are completely constructed.

La présente invention n'est pas limitée aux modes de réalisation spécifiques décrits ci-dessus. L'invention s'étend à toute nouvelle caractéristique ou tout nouveau combinaison révélée dans cette description, ainsi qu'à tout nouveau pas ou toute nouvelle combinaison de pas dans tout procédé ou processus décrit.The present invention is not limited to the specific embodiments described above. The invention extends to any new feature or combination disclosed in this description, as well as to any new step or combination of steps in any method or process described.

Claims (9)

RevendicationsClaims 1. Un dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton, où le système de coffrage est installé sur le côté extérieur du segment en cours de construction, le système de coffrage comprenant un système de coffrage grimpant et un système de coffrage grimpant hydraulique connecté au système de coffrage grimpant ; caractérisé en ce qu'il comprend une pièce d'ancrage préintégrée installée dans le segment déjà construit et disposée du même côté que le système de coffrage grimpant, un profilé d'acier de liaison situé à l'extérieur du système de coffrage grimpant et connecté au système de coffrage grimpant, et une pièce de connexion de support proche du côté du segment déjà construit et connectée à la pièce d'ancrage préintégrée.1. An additional reinforcement device for a climbing formwork system with a large upward tilt angle resisting the self-weight of concrete, wherein the formwork system is installed on the outer side of the segment under construction, the formwork system comprising a climbing formwork system and a hydraulic climbing formwork system connected to the climbing formwork system; characterized in that it comprises a pre-integrated anchoring piece installed in the already constructed segment and arranged on the same side as the climbing formwork system, a connecting steel profile located outside the climbing formwork system and connected to the climbing formwork system, and a support connection piece close to the side of the already constructed segment and connected to the pre-integrated anchoring piece. 2. Le dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton selon la revendication 1, caractérisé en ce que la pièce d'ancrage préintégrée comprend deux ensembles, comprenant une pièce d'ancrage de support connectée au bas de la pièce de connexion de support, et une pièce d'ancrage anti-arrachement située entre la pièce d'ancrage de support et le segment en cours de construction.2. The additional reinforcement device for a climbing formwork system with a large upward tilt angle resisting the self-weight of concrete according to claim 1, characterized in that the pre-integrated anchoring piece comprises two assemblies, comprising a support anchoring piece connected to the bottom of the support connection piece, and an anti-pull-out anchoring piece located between the support anchoring piece and the segment under construction. 3. Le dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton selon la revendication 2, caractérisé en ce que la pièce d'ancrage de support et la pièce d'ancrage anti-arrachement ont la même structure et sont toutes deux coniques, comprenant une vis d'ancrage préintégrée dans le segment déjà construit, un cône monté sur la vis, et un boulon de verrouillage vissé coaxialement avec le cône ; la grande surface du cône est sur le même plan que la surface extérieure du segment déjà construit.3. The additional reinforcement device for a climbing formwork system with a large upward inclination angle resistant to the self-weight of concrete according to claim 2, characterized in that the support anchor piece and the anti-pullout anchor piece have the same structure and are both conical, comprising an anchor screw pre-integrated in the already constructed segment, a cone mounted on the screw, and a locking bolt screwed coaxially with the cone; the large surface of the cone is on the same plane as the outer surface of the already constructed segment. 4. Le dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton selon la revendication 3, caractérisé en ce que la pièce de connexion de support comprend un profilé d'acier de support connecté au bas du profilé d'acier de liaison, et deux ensembles de supports installés sur le profilé d'acier de support et connectés respectivement à la pièce d'ancrage de support et à la pièce d'ancrage anti-arrachement.4. The additional reinforcement device for a large upward tilt angle climbing formwork system resisting the self-weight of concrete according to claim 3, characterized in that the support connection piece comprises a support steel profile connected to the bottom of the connecting steel profile, and two sets of brackets installed on the support steel profile and connected respectively to the support anchor piece and the anti-pull anchor piece. 5. Le dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton selon la revendication 4, caractérisé en ce que les deux ensembles de supports comprennent un support de suspension situé à l'extrémité du profilé d'acier de support éloignée du profilé d'acier de liaison, et un support anti-arrachement situé entre le support de suspension et le profilé d'acier de liaison.5. The additional reinforcement device for a climbing formwork system with a large upward tilt angle resisting the self-weight of the concrete according to claim 4, characterized in that the two sets of supports comprise a suspension support located at the end of the support steel profile remote from the connecting steel profile, and an anti-tearing support located between the suspension support and the connecting steel profile. 6. Le dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton selon la revendication 5, caractérisé en ce que le support de suspension comprend une base connectée au bas du profilé d'acier de support ; un trou traversant adapté pour être installé avec le boulon de verrouillage est disposé sur ladite base.6. The additional reinforcement device for a climbing formwork system with a large upward tilt angle resisting the self-weight of concrete according to claim 5, characterized in that the suspension bracket comprises a base connected to the bottom of the supporting steel profile; a through hole adapted to be installed with the locking bolt is provided on said base. 7. Le dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton selon la revendication 5, caractérisé en ce que le support anti-arrachement comprend une base située entre le profilé d'acier de support et le segment déjà construit, et une tige de liaison traversant le profilé d'acier de support et connectée à la base ; un trou traversant adapté pour être utilisé avec le boulon de verrouillage est disposé sur ladite base.7. The additional reinforcement device for a climbing formwork system with a large upward tilt angle resisting the self-weight of the concrete according to claim 5, characterized in that the anti-pull-out support comprises a base located between the supporting steel profile and the already constructed segment, and a connecting rod passing through the supporting steel profile and connected to the base; a through hole adapted to be used with the locking bolt is provided on said base. 8. Le dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton selon l'une quelconque des revendications 1 à 7, caractérisé en ce qu'une tige de traction est installée sur le dessus du profilé d'acier de liaison, l'angle formé par l'axe de la tige de traction et la direction horizontale étant A, À est entre 25 et 45°.8. The additional reinforcement device for a climbing formwork system with a large upward inclination angle resisting the self-weight of concrete according to any one of claims 1 to 7, characterized in that a pull rod is installed on the top of the connecting steel profile, the angle formed by the axis of the pull rod and the horizontal direction being A, A is between 25 and 45°. 9. Le dispositif de renfort supplémentaire pour un système de coffrage grimpant à grand angle d'inclinaison vers le haut résistant au poids propre du béton selon l'une quelconque des revendications 5 à 7, caractérisé en ce que les pièces d'ancrage de support et les pièces d'ancrage anti-arrachement sont toutes deux en deux ensembles et sont disposées en correspondance avec le support de suspension et le support anti-arrachement, respectivement.9. The additional reinforcement device for a climbing formwork system with a large upward inclination angle resisting the self-weight of concrete according to any one of claims 5 to 7, characterized in that the support anchoring pieces and the anti-tearing anchoring pieces are both in two sets and are arranged in correspondence with the suspension bracket and the anti-tearing bracket, respectively.
BE20245196A 2023-04-06 2024-04-05 Additional reinforcement device for a climbing formwork system with a large upward tilt angle resistant to the self-weight of the concrete BE1031199B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320742188.1U CN219862425U (en) 2023-04-06 2023-04-06 Additional back edge device for resisting dead weight of concrete of upward large-inclination climbing formwork system

Publications (2)

Publication Number Publication Date
BE1031199A1 BE1031199A1 (en) 2024-07-17
BE1031199B1 true BE1031199B1 (en) 2025-02-18

Family

ID=88368715

Family Applications (1)

Application Number Title Priority Date Filing Date
BE20245196A BE1031199B1 (en) 2023-04-06 2024-04-05 Additional reinforcement device for a climbing formwork system with a large upward tilt angle resistant to the self-weight of the concrete

Country Status (2)

Country Link
CN (1) CN219862425U (en)
BE (1) BE1031199B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4060358A (en) * 1975-06-05 1977-11-29 Coignet S.A. Climbing scaffolding assemblies with associated shuttering
DE7723305U1 (en) * 1977-07-26 1980-04-17 Dyckerhoff & Widmann Ag, 8000 Muenchen CLIMBING SHUTTER FOR PRODUCING A REINFORCED CONCRETE CONSTRUCTION WITH OUTSIDE WALLS CURVED IN THE BASIC AND LAYOUT
CN204112721U (en) * 2014-09-24 2015-01-21 中建一局集团建设发展有限公司 The huge post climbing apparatus of a kind of track attaching superelevation support body steel reinforced concrete
CN113338170A (en) * 2021-06-30 2021-09-03 郑州大学 Construction method of template system for construction creeping formwork of large-inclination tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4060358A (en) * 1975-06-05 1977-11-29 Coignet S.A. Climbing scaffolding assemblies with associated shuttering
DE7723305U1 (en) * 1977-07-26 1980-04-17 Dyckerhoff & Widmann Ag, 8000 Muenchen CLIMBING SHUTTER FOR PRODUCING A REINFORCED CONCRETE CONSTRUCTION WITH OUTSIDE WALLS CURVED IN THE BASIC AND LAYOUT
CN204112721U (en) * 2014-09-24 2015-01-21 中建一局集团建设发展有限公司 The huge post climbing apparatus of a kind of track attaching superelevation support body steel reinforced concrete
CN113338170A (en) * 2021-06-30 2021-09-03 郑州大学 Construction method of template system for construction creeping formwork of large-inclination tower

Also Published As

Publication number Publication date
CN219862425U (en) 2023-10-20
BE1031199A1 (en) 2024-07-17

Similar Documents

Publication Publication Date Title
CN107989366B (en) Be used for beam form bearing structure subassembly
FR2916785A1 (en) Large size wind turbine setting down and raising device, has leg supporting tower of wind turbine at level of separator when tower is horizontal and blades of nacelle are on ground and protected
CN1082121C (en) Concrete building frame construction device
WO2020012094A1 (en) Wind turbine tower comprising a lattice structure with wooden posts and a metal junction piece between the wind turbine mast and said posts
BE1031199B1 (en) Additional reinforcement device for a climbing formwork system with a large upward tilt angle resistant to the self-weight of the concrete
KR100832100B1 (en) Pylon base stress reduction hypothesis structure and pylon base base stress reduction method
WO2011005087A1 (en) Forkhead for use in a modular scaffolding system, and method of constructing a scaffold frame using the same
CA2238255C (en) Device for lifting a framework and any construction supported thereon
EP0777080B1 (en) Method for mounting a steam generating boiler
EP0387127A2 (en) Facade structure of the curtain wall type with tensioned cables or cords
FR2624903A1 (en) Process for fixing pylons and related device
FR2652844A1 (en) THREADED MEMBRANE ROOF STRUCTURE.
EP1826327A1 (en) Building structure
CN115233824A (en) Large-cantilever eccentric ring steel structure and construction method thereof
FR2555223A1 (en) Upright provided with a threaded base element and intended for the mounting of a guard-rail, handrail or the like
FR2741896A1 (en) IMPROVEMENTS TO PROCESSES FOR REHABILITATING SUSPENDED BRIDGES AND TO BRIDGES THUS REHABILITED
WO2018203016A1 (en) Set of structural elements intended for forming a multi-storey above-ground car park, and corresponding multi-storey above-ground car park
FR3095664A1 (en) JUNCTION MODULE FOR SUSPENDED DECK
EP0242238B1 (en) Steel and reinforced concrete structures, particularly for producing girders, in particular girders used as purlins or girders with a large span
CN205206100U (en) One -way steel cable point of superelevation supporting ARC unit glass curtain wall
FR2901296A1 (en) SCAFFOLDING DEVICE, LATTICE PYLONE WITH SUCH SCAFFOLDING DEVICE, AND METHOD FOR RENOVATING LATTICE HOLLOW PYLONES USING SUCH SCAFFOLDING DEVICE
EP2711260B1 (en) Aerial cableway station, in particular of a chair-lift or cable-car, and methods for assembling and dismantling such a station
FR2615220A1 (en) METHOD FOR THE SUCCESSIVE CONSTRUCTION OF SUPERIMPOSED BUILDING FLOORS
FR2846681A1 (en) Modular load bearing structure comprises vertical support posts connected by long beams, certain beams, supported on sloping buttress connecting rods, consist of juxtaposed spandrels delimiting central space through which cable passes
FR2851780A1 (en) Prefabricated bridge girder comprises concrete base plate with lateral portion projecting from web and stowing support extending over upper face of lateral portion