ATE438548T1 - Diagnosesystem und verfahren zum überwachen eines eisenbahnsystems - Google Patents
Diagnosesystem und verfahren zum überwachen eines eisenbahnsystemsInfo
- Publication number
- ATE438548T1 ATE438548T1 AT06019461T AT06019461T ATE438548T1 AT E438548 T1 ATE438548 T1 AT E438548T1 AT 06019461 T AT06019461 T AT 06019461T AT 06019461 T AT06019461 T AT 06019461T AT E438548 T1 ATE438548 T1 AT E438548T1
- Authority
- AT
- Austria
- Prior art keywords
- rail
- infrastructure
- location
- events
- vehicles
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/50—Trackside diagnosis or maintenance, e.g. software upgrades
- B61L27/57—Trackside diagnosis or maintenance, e.g. software upgrades for vehicles or trains, e.g. trackside supervision of train conditions
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- General Health & Medical Sciences (AREA)
- Mechanical Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Traffic Control Systems (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP06019461A EP1900597B1 (de) | 2006-09-18 | 2006-09-18 | Diagnosesystem und Verfahren zum Überwachen eines Eisenbahnsystems |
Publications (1)
Publication Number | Publication Date |
---|---|
ATE438548T1 true ATE438548T1 (de) | 2009-08-15 |
Family
ID=37773337
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AT06019461T ATE438548T1 (de) | 2006-09-18 | 2006-09-18 | Diagnosesystem und verfahren zum überwachen eines eisenbahnsystems |
Country Status (6)
Country | Link |
---|---|
US (1) | US20100204857A1 (de) |
EP (2) | EP1900597B1 (de) |
AT (1) | ATE438548T1 (de) |
CA (1) | CA2663585C (de) |
DE (1) | DE602006008308D1 (de) |
WO (1) | WO2008034583A1 (de) |
Families Citing this family (53)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11208129B2 (en) * | 2002-06-04 | 2021-12-28 | Transportation Ip Holdings, Llc | Vehicle control system and method |
US8231270B2 (en) * | 2008-01-03 | 2012-07-31 | Concaten, Inc. | Integrated rail efficiency and safety support system |
DE102008028264B3 (de) * | 2008-06-13 | 2009-12-17 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Verfahren zur Überwachung wenigstens eines das Betriebsverhalten von Fahrzeugen oder Fahrzeugzügen beeinflussenden Systemparameters |
DE102009002678B4 (de) * | 2009-04-27 | 2012-04-26 | AGG Anlagen- und Gerätebau GmbH | Prüfverfahren für Drehgestelle sowie Prüf- und Montagestand |
FR2945013B1 (fr) * | 2009-04-30 | 2016-08-12 | Alstom Transport Sa | Procede de transfert de donnees d'alerte entre un vehicule ferroviaire en panne et un centre de controle,dispositif associe |
GB0911836D0 (en) | 2009-07-08 | 2009-08-19 | Optimized Systems And Solution | Machine operation management |
DE102009037637A1 (de) * | 2009-08-14 | 2011-02-24 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Verfahren und elektronische Einrichtung zur Zustandsüberwachung von Bauteilen bei Schienenfahrzeugen |
DE102009053801B4 (de) * | 2009-11-18 | 2019-03-21 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Verfahren und Einrichtung zur Zustandsüberwachung wenigstens einen Radsatz aufweisenden Drehgestells eines Schienenfahrzeugs |
US20140232191A1 (en) * | 2011-09-29 | 2014-08-21 | Siemens Aktiengesellschaft | Contact wire system for traction supply of an electric tractive vehicle |
US20150220857A1 (en) * | 2011-10-10 | 2015-08-06 | Syntel, Inc. | Store service workbench |
EP2650191B1 (de) | 2012-04-12 | 2019-01-16 | Progress Rail Services Corporation | Verfahren zum Erkennen und Signalisieren eines Hotbox-Zustands |
EP2650190A1 (de) * | 2012-04-12 | 2013-10-16 | Progress Rail Services Corporation | Vorrichtung zum Erkennen eines Hotbox- oder eines heißen Reifenzustands |
DE102013201488A1 (de) | 2012-09-18 | 2014-04-10 | Siemens Aktiengesellschaft | Verfahren zur Diagnose von Streckenkomponenten eines Streckennetzes des Schienenverkehrs |
WO2014193610A1 (en) * | 2013-05-30 | 2014-12-04 | Wabtec Holding Corp. | Broken rail detection system for communications-based train control |
US9771087B2 (en) * | 2013-10-04 | 2017-09-26 | Nippon Steel & Sumitomo Metal Corporation | Abnormality detection method for vehicle body tilt control device |
JP6079672B2 (ja) * | 2014-03-10 | 2017-02-15 | 村田機械株式会社 | 搬送車システム |
US10507851B1 (en) * | 2014-07-24 | 2019-12-17 | Leo Byford | Railcar bearing and wheel monitoring system |
US9707982B1 (en) * | 2014-07-24 | 2017-07-18 | Leo Byford | Railcar bearing and wheel monitoring system |
US9701326B2 (en) * | 2014-09-12 | 2017-07-11 | Westinghouse Air Brake Technologies Corporation | Broken rail detection system for railway systems |
DE102014113371A1 (de) | 2014-09-17 | 2016-03-17 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Verfahren zur Überwachung und Diagnose von Komponenten eines Schienenfahrzeugs, mit erweiterbarer Auswertungssoftware |
US9663127B2 (en) | 2014-10-28 | 2017-05-30 | Smartdrive Systems, Inc. | Rail vehicle event detection and recording system |
US9487222B2 (en) * | 2015-01-08 | 2016-11-08 | Smartdrive Systems, Inc. | System and method for aggregation display and analysis of rail vehicle event information |
US9902410B2 (en) | 2015-01-08 | 2018-02-27 | Smartdrive Systems, Inc. | System and method for synthesizing rail vehicle event information |
US9296401B1 (en) | 2015-01-12 | 2016-03-29 | Smartdrive Systems, Inc. | Rail vehicle event triggering system and method |
DE102015211587A1 (de) * | 2015-06-23 | 2016-12-29 | Siemens Aktiengesellschaft | Steueranordnung für ein Fahrzeug |
DE102015211641A1 (de) * | 2015-06-24 | 2016-12-29 | Bayerische Motoren Werke Aktiengesellschaft | Verfahren, System, und Computer-lesbares Medium zum Speichern von Diagnosedaten eines Fahrzeugs |
GB2541710B (en) * | 2015-08-27 | 2017-12-13 | Hitachi Ltd | Locating train events on a railway network |
GB2542115B (en) * | 2015-09-03 | 2017-11-15 | Rail Vision Europe Ltd | Rail track asset survey system |
AU2017207434B2 (en) * | 2016-01-15 | 2019-11-14 | New York Air Brake, LLC | Train brake safety monitoring and fault action system with PTC brake performance assurance |
EP3254928A1 (de) | 2016-06-10 | 2017-12-13 | Bombardier Transportation GmbH | System und verfahren zur anlagenverwaltung von eisenbahnzügen |
DE102016116419A1 (de) | 2016-09-02 | 2018-03-08 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Verfahren und Vorrichtung zum Überwachen von Fahrzeugzuständen in Schienenfahrzeugen |
DE102016217883A1 (de) * | 2016-09-19 | 2018-03-22 | Siemens Aktiengesellschaft | Überwachung von Infrastruktureinrichtungen mittels Geoclustering |
CN106487592B (zh) * | 2016-10-21 | 2019-09-27 | 国家计算机网络与信息安全管理中心 | 一种基于数据立方体的分布式系统故障诊断方法 |
CN106502195A (zh) * | 2016-11-30 | 2017-03-15 | 河南中烟工业有限责任公司 | 一种新型zj17卷接机组安全防护联锁系统 |
US10724998B2 (en) * | 2017-01-17 | 2020-07-28 | Ge Global Sourcing Llc | Method and system for inspecting a rail profile using phased array technology |
US10940876B2 (en) * | 2017-02-02 | 2021-03-09 | Transportation Ip Holdings, Llc | Route examination system |
DE102017104202A1 (de) | 2017-03-01 | 2018-09-06 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Verfahren zur kontinuierlichen Anpassung und Erweiterung von Streckendaten für ein Schienenfahrzeug |
CN110622220B (zh) * | 2017-05-05 | 2023-03-10 | 福特全球技术公司 | 自适应诊断参数化 |
EP3684671A1 (de) * | 2017-09-18 | 2020-07-29 | SEW-EURODRIVE GmbH & Co. KG | Schienenanlage und verfahren zum betreiben einer schienenanlage mit schienengeführtem mobilteil und zentraler steuerung |
AU2017232220B2 (en) * | 2017-09-24 | 2021-11-11 | Rail Vision Europe Ltd | Railroadtrack asset survey system |
DE112017008274T5 (de) * | 2017-12-14 | 2020-08-27 | Mitsubishi Electric Corporation | Verteilungseinrichtung, Empfangseinrichtung, Datenverteilungssystem und Datenverteilungsverfahren |
EP3594084A1 (de) * | 2018-07-13 | 2020-01-15 | Schweizerische Bundesbahnen SBB | Verfahren und vorrichtung zur überwachung eines eisenbahnnetzes und eisenbahnnetz |
WO2020051395A1 (en) * | 2018-09-07 | 2020-03-12 | Hitachi Rail Sts Usa, Inc. | Railway diagnostic systems and methods |
EP3623258A1 (de) * | 2018-09-13 | 2020-03-18 | ABB Schweiz AG | Verfahren zur überwachung eines stromnetzes eines elektrischen eisenbahnsystems |
CN110263066B (zh) * | 2019-06-13 | 2022-11-29 | 优信拍(北京)信息科技有限公司 | 一种车辆筛选方法及装置 |
US20220355839A1 (en) * | 2019-07-02 | 2022-11-10 | Konux Gmbh | Monitoring, predicting and maintaining the condition of railroad elements with digital twins |
CN111332340A (zh) * | 2020-03-06 | 2020-06-26 | 东莞理工学院 | 一种轨道交通监测数据的存储和处理方法及系统 |
US20220161834A1 (en) * | 2020-11-23 | 2022-05-26 | New York City Transit Authority | Station Time, Grade Time, Stop Time, and Relay Time Testing Device |
US11858543B2 (en) * | 2020-12-21 | 2024-01-02 | Progress Rail Services Corporation | System and method for controlling operations of a train using energy management machine learning models |
WO2022189009A1 (de) * | 2021-03-10 | 2022-09-15 | Schunk Transit Systems Gmbh | Verfahren zur überwachung von schienenfahrzeugen |
SE2250683A1 (en) * | 2022-06-07 | 2023-12-08 | Txg Ecobogie Ab | Supplementary drive system for a train |
CN117949020B (zh) * | 2024-03-25 | 2024-06-18 | 深圳市城市交通规划设计研究中心股份有限公司 | 基于列车行驶特征的便捷式添乘仪数据里程校准方法 |
CN118403795B (zh) * | 2024-06-27 | 2024-09-20 | 江苏勒捷特自控科技有限公司 | 物流视觉差速分离高速供货系统 |
Family Cites Families (41)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6277002A (ja) | 1985-09-30 | 1987-04-09 | Mitsubishi Electric Corp | 列車用計測センサ検査装置 |
US5433111A (en) * | 1994-05-05 | 1995-07-18 | General Electric Company | Apparatus and method for detecting defective conditions in railway vehicle wheels and railtracks |
DE19501994A1 (de) | 1995-01-11 | 1996-07-18 | Elpro Ag | Verfahren und Einrichtung zur Erfassung der Zugstandorte und Übermittlung aller Zugstandorte an Triebfahrzeuge sowie Zugleitungen oder andere berechtigte Nutzer |
US5867404A (en) * | 1996-04-01 | 1999-02-02 | Cairo Systems, Inc. | Method and apparatus for monitoring railway defects |
US6044698A (en) | 1996-04-01 | 2000-04-04 | Cairo Systems, Inc. | Method and apparatus including accelerometer and tilt sensor for detecting railway anomalies |
US5956664A (en) | 1996-04-01 | 1999-09-21 | Cairo Systems, Inc. | Method and apparatus for monitoring railway defects |
US6125311A (en) * | 1997-12-31 | 2000-09-26 | Maryland Technology Corporation | Railway operation monitoring and diagnosing systems |
DE19827271C5 (de) * | 1998-06-19 | 2008-11-27 | MÜLLER, Andreas | On-line Erfassungssystem mit Auswerteteil für rad- und gleisbezogene Daten für Hochgeschwindigkeitszüge |
DE19852220C2 (de) | 1998-11-12 | 2001-07-26 | Stn Atlas Elektronik Gmbh | Verfahren zur Erkennung von Schäden im Schienenverkehr |
DE19858937A1 (de) * | 1998-12-08 | 2000-06-15 | Gerd Klenke | Verfahren und Einrichtung zum Überwachen des Schienenverkehrs |
US6681160B2 (en) | 1999-06-15 | 2004-01-20 | Andian Technologies Ltd. | Geometric track and track/vehicle analyzers and methods for controlling railroad systems |
US6263265B1 (en) * | 1999-10-01 | 2001-07-17 | General Electric Company | Web information vault |
BR0013585A (pt) | 1999-08-23 | 2002-07-23 | Gen Electric | Aparelho e método para administrar uma frota de bens móveis |
US7219067B1 (en) * | 1999-09-10 | 2007-05-15 | Ge Harris Railway Electronics Llc | Total transportation management system |
AU7365500A (en) | 1999-09-10 | 2001-04-10 | Ge-Harris Railways Electronics, L.L.C. | Total transportation management system |
WO2001030632A1 (en) | 1999-10-28 | 2001-05-03 | General Electric Company | Diagnosis and repair system and method |
WO2001031844A2 (en) * | 1999-10-28 | 2001-05-03 | General Electric Company | Dual mode data communication for monitoring and diagnostics of remote assets |
US6651034B1 (en) * | 1999-10-28 | 2003-11-18 | General Electric Company | Apparatus and method for performance and fault data analysis |
US6434458B1 (en) | 1999-10-28 | 2002-08-13 | General Electric Company | Method and apparatus for vehicle data transfer optimization |
DE10022684A1 (de) | 2000-04-28 | 2001-10-31 | Deutsche Telekom Ag | Sicherheitssystem für Schienenfahrzeuge und Schienenfahrwege |
US6434452B1 (en) | 2000-10-31 | 2002-08-13 | General Electric Company | Track database integrity monitor for enhanced railroad safety distributed power |
EP1345802B2 (de) | 2000-12-22 | 2020-11-04 | DB Fernverkehr AG | Verfahren und vorrichtung zum überwachen des fahrverhaltens von schienenfahrzeugen |
GB0104688D0 (en) | 2001-02-26 | 2001-04-11 | Roke Manor Research | Active rail health monitoring system |
NL1020247C2 (nl) | 2001-03-27 | 2006-01-18 | Volker Stevin Rail & Traffic B | TRIS« (spoorweg informatie systeem). |
GB2392987B (en) | 2001-05-08 | 2005-08-31 | Safetran Systems Corp | Condition monitoring system |
GB2378248A (en) * | 2001-05-09 | 2003-02-05 | Worcester Entpr Ltd | A fault prediction system for vehicles |
US6688561B2 (en) | 2001-12-27 | 2004-02-10 | General Electric Company | Remote monitoring of grade crossing warning equipment |
US6799097B2 (en) * | 2002-06-24 | 2004-09-28 | Modular Mining Systems, Inc. | Integrated railroad system |
GB0216836D0 (en) * | 2002-07-19 | 2002-08-28 | Aea Technology Plc | Assessment of railway track quality |
US6993675B2 (en) * | 2002-07-31 | 2006-01-31 | General Electric Company | Method and system for monitoring problem resolution of a machine |
JP4827412B2 (ja) | 2002-09-05 | 2011-11-30 | ボンバルディール トランスポーテイション ゲゼルシャフト ミット ベシュレンクテル ハフツング | 車両の車両シャーシの状態を監視する方法及び装置 |
GB2392983A (en) | 2002-09-13 | 2004-03-17 | Bombardier Transp Gmbh | Remote system condition monitoring |
US6863246B2 (en) * | 2002-12-31 | 2005-03-08 | Quantum Engineering, Inc. | Method and system for automated fault reporting |
CA2454739C (en) | 2003-01-06 | 2011-09-13 | General Electric Company | Multi-level railway operations optimization |
US6871137B2 (en) | 2003-02-05 | 2005-03-22 | Gannett Fleming, Inc. | Intelligent road and rail information systems and methods |
GB0304633D0 (en) * | 2003-02-28 | 2003-04-02 | Cdsrail Ltd | Condition monitoring apparatus and method |
GB0318339D0 (en) | 2003-08-05 | 2003-09-10 | Oxford Biosignals Ltd | Installation condition monitoring system |
WO2005036199A2 (en) | 2003-10-06 | 2005-04-21 | Marshall University | Railroad surveying and monitoring system |
US20070203621A1 (en) | 2004-11-23 | 2007-08-30 | Lioyd Haugen | Rail track evaluation system |
EP1861303B1 (de) | 2005-03-14 | 2009-07-08 | Mp S.R.L. | Kommunikations-, überwachungs- und steuervorrichtung und verwandtes verfahren für den eisenbahnverkehr |
DE202006005190U1 (de) * | 2006-03-31 | 2006-06-22 | Neuroth, Bernd, Tres Cantos | Anordnung zur Überprüfung der Laufräder von Schienenfahrzeugen |
-
2006
- 2006-09-18 AT AT06019461T patent/ATE438548T1/de not_active IP Right Cessation
- 2006-09-18 DE DE602006008308T patent/DE602006008308D1/de active Active
- 2006-09-18 EP EP06019461A patent/EP1900597B1/de active Active
-
2007
- 2007-09-18 US US12/441,724 patent/US20100204857A1/en not_active Abandoned
- 2007-09-18 EP EP07818218.5A patent/EP2064106B1/de active Active
- 2007-09-18 CA CA2663585A patent/CA2663585C/en active Active
- 2007-09-18 WO PCT/EP2007/008116 patent/WO2008034583A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
CA2663585C (en) | 2016-01-05 |
DE602006008308D1 (de) | 2009-09-17 |
WO2008034583A1 (en) | 2008-03-27 |
US20100204857A1 (en) | 2010-08-12 |
CA2663585A1 (en) | 2008-03-27 |
EP2064106B1 (de) | 2016-06-15 |
EP1900597A1 (de) | 2008-03-19 |
EP1900597B1 (de) | 2009-08-05 |
EP2064106A1 (de) | 2009-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ATE438548T1 (de) | Diagnosesystem und verfahren zum überwachen eines eisenbahnsystems | |
DE60305783D1 (de) | Verfahren und System zur Prüfung eines Fahrzeugs mit Onboard-Diagnoseeinrichtung | |
ATE514986T1 (de) | Verfahren und vorrichtung zur erzeugung mindestens einer gewählten flugbahn eines fahrzeugs | |
DE502008002743D1 (de) | Vorrichtung und verfahren zur fehlerüberwachung von fahrwerkskomponenten von schienenfahrzeugen | |
PL2152560T3 (pl) | Urządzenie do kontroli wad komponentów podwozia pojazdów szynowych | |
ATE459511T1 (de) | Verfahren und system zur bereitstellung von fahrinformationen für den fahrer eines fahrzeugs | |
AU2020482144B2 (en) | Track state monitoring device, track state monitoring system and track state monitoring method | |
DE502008001012D1 (de) | Verfahren und Vorrichtung zum Ermitteln einer auf eine Strecke eines Straßennetzes bezogenen Verkehrsgröße | |
JP7271798B2 (ja) | 締結具監視装置、締結具監視システム及び締結具監視方法 | |
ATE534099T1 (de) | Verfahren und vorrichtung zum bestimmen der position eines verkehrszeichens | |
ATE375416T1 (de) | Kontrollvorrichtung und verfahren zur überwachung eines arbeitszuges | |
ITTO20070869A1 (it) | Dispositivo per il monitoraggio e l'analisi della conduzione di un autoveicolo | |
EP2464556A2 (de) | Verfahren und elektronische einrichtung zur zustandsüberwachung von bauteilen bei schienenfahrzeugen | |
DE102017130412A1 (de) | Tastenfeld-mastercode | |
Tsunashima et al. | Development of Track Condition Monitoring System Using On-board Sensing Device | |
EP1857982A3 (de) | Diagnosesystem für Nebenfahrzeuge, insbesondere Gleisbaumaschinen | |
CN104903175B (zh) | 用于分析撒布剂和用于控制播撒撒布剂到用于轨道车辆的轨道上的方法和装置 | |
DE112004000664D2 (de) | Vorrichtung und Verfahren zur Messung von Beschleunigungen für ein Fahrzeug-Insassenschutzsystem | |
JP2011011715A (ja) | 異常原因特定装置、異常原因特定システム、および異常原因特定方法 | |
DE102011079886A1 (de) | Verfahren und Vorrichtung zum Bestimmen aktueller fahrzeugspezifischer Orientierungsdaten für ein Fahrzeug | |
FR2933657B1 (fr) | Dispositif d'evaluation de l'acceleration transversale d'un vehicule automobile et procede correspondant | |
Balfe et al. | A framework for human factors analysis of railway on-train data | |
JP2013100111A (ja) | 異常原因特定装置、異常原因特定システム、および異常原因特定方法 | |
DE102020118670A1 (de) | Beobachtungsverfahren | |
DE102006062549B4 (de) | Verfahren und Einrichtung zum automatischen Positionieren von streckenseitigen Infrastrukturen |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
RER | Ceased as to paragraph 5 lit. 3 law introducing patent treaties |