[go: up one dir, main page]

AT97351B - Protective device for electrical systems. - Google Patents

Protective device for electrical systems.

Info

Publication number
AT97351B
AT97351B AT97351DA AT97351B AT 97351 B AT97351 B AT 97351B AT 97351D A AT97351D A AT 97351DA AT 97351 B AT97351 B AT 97351B
Authority
AT
Austria
Prior art keywords
protective device
control centers
electrical systems
section
switches
Prior art date
Application number
Other languages
German (de)
Original Assignee
Siemens Schuckertwerke Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Schuckertwerke Gmbh filed Critical Siemens Schuckertwerke Gmbh
Application granted granted Critical
Publication of AT97351B publication Critical patent/AT97351B/en

Links

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Schutzeinrichtung für elektrische Anlagen. 
 EMI1.1 
 



   Der Gegenstand der Erfindung ist eine Schutzeinrichtung, bei der im Falle, dass eine der beiden Zentralen stillgesetzt ist und nur als Unterstation wirkt, beim Auftreten eines Fehlers in der Leitungsstrecke zwischen den beiden Zentralen nur diese abgeschaltet wird. Dies wird nach der Erfindung dadurch erreicht, dass die Auslösekreise der Streckenschalter zwischen den Zentralen mit zwei Zeitrelais von verschiedener Verzögerung versehen sind, von denen je nach der Richtung des Energieflusses nur das eine anspricht. 
 EMI1.2 
 mit gegenläufiger Staffelung eingetragen. Die Schalter der Teilstrecke A erhalten je zwei Verzögerungen, eine von einer und eine von sechs Sekunden. 



   Fig. 3 zeigt eine Ausführungsform einer solchen Schutzeinrichtung. 



   Die Teilstrecke A ist von den Schaltern 11 und 12 eingegrenzt. Hinter der Station I in der Teilstrecke B liegt der Streckenschalter 13, hinter der Station II in der Teilstrecke E der Schalter 14. Die zu 
 EMI1.3 
 

 <Desc/Clms Page number 2> 

 
 EMI2.1 
 bis 414 der Schalter an das Netz P N geschaltet werden. 



   Die Einrichtung wirkt in folgender Weise : Es sei angenommen, dass die Zentrale I stillgesetzt ist und nur als Unterstation arbeitet und dass in der Leitungsstrecke A zwischen der Zentrale I und   II   ein Fehler aufgetreten ist. Von der Station   II   fliesst Strom zum Fehler hin. Das Energierichtungsrelais 112 spricht also an und schliesst die Kontakte   512,   so dass das Auslöserelais 212 b mit sechs Sekunden Verzögerung zu arbeiten beginnt. Da aber gleichzeitig das Energierichtungsrelais 114 die Kontakte 514a geschlossen 
 EMI2.2 
 löserelais 211a und   211b.   Da gleichzeitig das Energierichtungsrelais 113 die Kontakte 513b   schliesst,   so löst das   Relais 211b   den Schalter 11 über die Kontakte 311b und die Spule 411 aus.

   Damit ist die Teilstrecke A abgetrennt, ohne dass eine der gesunden Strecken in Mitleidenschaft gezogen worden wäre. 



   Wird die Zentrale II stillgesetzt und arbeitet nur die Zentrale I, so arbeiten beim Auftreten einee Fehlers in der Strecke A nur die gleichen Auslöserelais mit einer Sekunde Verzögerung. Sobald aber ein Störung in irgendeiner der andern Teilstrecken auftritt, so treten nur die Auslöserelais 211a und 212b in Wirkung, fuhren aber keine Auslösung ihrer Schalter herbei, weil sie die längste Auslösezeit haben. 



  Wenn beide Zentralen arbeiten, so fliesst beim Auftreten eines Fehlers in der Teilstrecke A kein Kurzschlussstrom über die Teilstrecken B bis   B   und es lösen die Streckenschalter mit sechs Sekunden Verzögerung aus. Ist beispielsweise die Maschinenleistung der Zentrale I gegenüber der der Zentrale II sehr klein, so liefert die Zentrale II auch über den Ring E bis B Strom zum Fehler in A. Dann aber wird der mit fünf Sekunden verzögerte Schaltern B verriegelt und der mit einer Sekunde verzögerte Schalter in A wird aus-   gelöst.   



     Die Verzögerung   der Auslöserelais kann vom Strom abhängig, begrenzt abhängig oder von ihm unabhängig sein. 



   PATENT-ANSPRÜCHE :
1. Schutzeinrichtung für elektrische Anlagen, die von mehreren Zentralen gespeist werden und mit gegenläufiger Staffelung der Auslöserelais versehen sind, zum Eingrenzen eines Fehlers in der Leitungstrecke zwischen zwei Zentralen, dadurch gekennzeichnet, dass die Auslösekreise der   Streekenschalter   zwischen den Zentralen mit je zwei Zeitrelais von verschiedener   Verzögerung   versehen sind, von denen je nach der Richtung des Energieflusses nur das eine anspricht. 

**WARNUNG** Ende DESC Feld kannt Anfang CLMS uberlappen**.



   <Desc / Clms Page number 1>
 



  Protective device for electrical systems.
 EMI1.1
 



   The subject of the invention is a protective device in which, in the event that one of the two central units is shut down and only acts as a substation, only this is switched off when a fault occurs in the line between the two central units. This is achieved according to the invention in that the tripping circuits of the line switches between the control centers are provided with two time relays with different delays, of which only one responds depending on the direction of the energy flow.
 EMI1.2
 entered with opposite graduation. The switches of section A each receive two delays, one of one and one of six seconds.



   Fig. 3 shows an embodiment of such a protective device.



   Section A is delimited by switches 11 and 12. Behind station I in section B is the line switch 13, behind station II in section E is switch 14
 EMI1.3
 

 <Desc / Clms Page number 2>

 
 EMI2.1
 to 414 the switches are switched to the network P N.



   The device works in the following way: It is assumed that the control center I is shut down and only works as a substation and that an error has occurred in the line section A between the control centers I and II. Current flows from station II to the fault. The energy direction relay 112 responds and closes the contacts 512, so that the trip relay 212b begins to work with a six second delay. However, since the energy direction relay 114 closes the contacts 514a at the same time
 EMI2.2
 release relays 211a and 211b. Since the energy direction relay 113 closes the contacts 513b at the same time, the relay 211b triggers the switch 11 via the contacts 311b and the coil 411.

   Section A is thus cut off without any of the healthy sections being affected.



   If the control center II is shut down and only the control center I is working, if a fault occurs in the line A, only the same trip relays work with a one-second delay. As soon as a fault occurs in any of the other sections, only the tripping relays 211a and 212b come into effect, but do not trigger their switches because they have the longest tripping time.



  If both control panels are working, if a fault occurs in section A, no short-circuit current flows through sections B to B and the section switches are triggered with a six-second delay. If, for example, the machine output of control center I is very small compared to that of control center II, control center II also supplies power to the error in A via ring E to B. Switch in A is triggered.



     The delay of the trip relay can be dependent on, limited or independent of the current.



   PATENT CLAIMS:
1. Protection device for electrical systems that are fed from several control centers and are provided with counter-grading of the trip relays to isolate a fault in the line between two control centers, characterized in that the trip circuits of the line switches between the control centers with two time relays of different Delays are provided, of which only one responds depending on the direction of the flow of energy.

** WARNING ** End of DESC field may overlap beginning of CLMS **.

 

Claims (1)

2. Schutzeinrichtung nachAnspruch l, dadurch gekennzeichnet, dass die von derteilstrecke zwischen den Zentralen aus gesehen hinter den Zentralen liegenden Energierichtungsrelais beim Verriegeln der zugehörigen Schalter Kontakte schliessen, die den Stromkreis der Auslöserelais zwischen den Zentralen mit kurzer Zeitverzögerung vorbereiten. **WARNUNG** Ende CLMS Feld Kannt Anfang DESC uberlappen**. 2. Protective device according to claim l, characterized in that the energy direction relays located behind the control centers when locking the associated switch, as seen from the partial route between the control centers, close contacts that prepare the circuit of the trip relay between the control centers with a short time delay. ** WARNING ** End of CLMS field may overlap beginning of DESC **.
AT97351D 1923-02-17 1923-07-25 Protective device for electrical systems. AT97351B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE97351X 1923-02-17

Publications (1)

Publication Number Publication Date
AT97351B true AT97351B (en) 1924-06-25

Family

ID=5646254

Family Applications (1)

Application Number Title Priority Date Filing Date
AT97351D AT97351B (en) 1923-02-17 1923-07-25 Protective device for electrical systems.

Country Status (1)

Country Link
AT (1) AT97351B (en)

Similar Documents

Publication Publication Date Title
AT97351B (en) Protective device for electrical systems.
DE646348C (en) Protective device for any number of parallel lines
DE552594C (en) High performance fuse
AT101881B (en) Device for protecting two parallel lines in AC systems.
AT130096B (en) Arrangement for switching off lines in the event of a double earth fault.
DE414370C (en) Protective device for electrical systems that are fed by several control centers and are provided with counter-grading of the trip relays to isolate a fault in the line between two control centers
AT121910B (en) Protective device for electrical systems.
DE637241C (en) Differential protection arrangement for parallel lines
AT131490B (en)
DE926800C (en) Length differential protection device
AT102449B (en) Protection device for two parallel alternating current lines fed from two sides.
DE653787C (en) Protective device for any number of parallel lines
AT111462B (en) Device for selective disconnection in the event of an earth fault for single-phase systems consisting of at least two parallel line pairs.
DE463421C (en) Device for the selective disconnection of faulty line sections in networks with switching relays, the tripping times of which are staggered
AT142065B (en) Device for switching off multi-phase lines.
DE497394C (en) Selective protection device
DE484038C (en) Device for selective shutdown in the event of an earth fault
DE665038C (en) Protection circuit for electrical system parts
DE528595C (en) Circuit arrangement for electrical system parts monitored by differential relays
DE681386C (en) Overcurrent protection device for electrical networks with strongly fluctuating operating currents
DE568689C (en) Switching arrangement in electrical distribution systems that are divided into individual network sections
AT142071B (en) Distance protection device dependent on the line resistance.
DE681061C (en) Protection circuit for electrical system parts
DE469831C (en) Arrangement for selective protection for double lines
DE742716C (en) Protection circuit for electrical system parts