[go: up one dir, main page]

AT265944B - Processing system for large-format components, especially for silicate concrete and concrete slabs - Google Patents

Processing system for large-format components, especially for silicate concrete and concrete slabs

Info

Publication number
AT265944B
AT265944B AT306367A AT306367A AT265944B AT 265944 B AT265944 B AT 265944B AT 306367 A AT306367 A AT 306367A AT 306367 A AT306367 A AT 306367A AT 265944 B AT265944 B AT 265944B
Authority
AT
Austria
Prior art keywords
conveyor
components
concrete
processing system
silicate
Prior art date
Application number
AT306367A
Other languages
German (de)
Inventor
Moisei Khaimovich Nevelson
Vladimir Mikhailovich Pelevin
Original Assignee
Gvi Proekt Predprijatii Promy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gvi Proekt Predprijatii Promy filed Critical Gvi Proekt Predprijatii Promy
Priority to AT306367A priority Critical patent/AT265944B/en
Application granted granted Critical
Publication of AT265944B publication Critical patent/AT265944B/en

Links

Landscapes

  • Specific Conveyance Elements (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



   Bearbeitungsanlage für grossformatige Bauteile, insbesondere für   Silikatbeton-und   Betonplatten 
Die Erfindung bezieht sich auf Bearbeitungsanlagen für grossformatige Bauteile, auf denen insbesondere Silikatbeton-und Betonplatten   z. B.   gespachtelt, abgerieben, mit Einlegeteilen komplettiert, angestrichen oder andersartig oberflächenbearbeitet werden. 



   Bekannt sind Bearbeitungsanlagen für Bauteile, bei denen die zu bearbeitenden Bauteile horizontalliegend auf einem Förderer zwischen den Arbeitsgeräten verschoben werden, wobei sie auf diesem mit ihrer Unterseite aufliegen. Nur die Oberseite des Bauteils verbleibt hiebei für die Bearbeitung zugänglich. Der Bauteil muss zur Bearbeitung seiner Unterseite umgelegt werden. Eine solche Anlage befindet sich im Wjasow-Baukonstruktions-Grossbetrieb in Moskau im Betrieb. Das unvermeidliche Umlegen der Bauteile verlängert den Arbeitsablauf bei deren Bearbeitung und erschwert die Automatisierung des Prozesses. 



   Es sind auch Bearbeitungsanlagen für Bauteile bekannt, bei denen diese senkrecht auf dem Förderer stehen. So stehen beispielsweise im Rostokino-Stahlbetonkonstruktionswerk (Moskau) Silikatbetonplatten bei der Bearbeitung auf dem Fördererwagen. Sie werden in der Senkrechtlage durch eine Führungseinrichtung gehalten, die längs des oberen Bauteilrandes angeordnet ist. 



   Es ist ein Nachteil dieser Anlagen, dass auf ihnen nur Platten bestimmter Dicke und Höhe bearbeitet werden können, da die Anordnung der Führungseinrichtung von den Abmessungen der zu bearbeitenden Bauteile abhängt. 



   Es ist das Ziel der Erfindung, die erwähnten Nachteile zu beseitigen. 



   Der Erfindung liegt die Aufgabe zugrunde, eine solche Bearbeitungsanlage für grossformatige Bauteile zu schaffen, bei der die zu bearbeitenden Bauteile durch den ziehenden Trum eines Förderers zwischen den entlang dem Förderer aufgestellten Arbeitsgeräten verschoben werden und durch eine Führungseinrichtung gehalten werden, wobei die Bearbeitung von Bauteilen mit unterschiedlichen Abmessungen in einem Fertigungsfluss auf einer oder zwei Seiten ohne Umlegen der Bauteile möglich ist und die Werkstattsbearbeitung der Bauteile bei minimalem Zeit- und Arbeitsaufwand sowie geringem Platzbedarf vollkommen beendet werden kann. 



   Erfindungsgemäss wird dies dadurch erreicht, dass bei der Bearbeitungsanlage für Bauteile die Führungseinrichtung,   z. B.   in Form von Rollen, auf einer Seite des Förderers unter einem Winkel zur Senkrechten montiert ist, so dass die zu bearbeitenden Bauteile während ihrer Verschiebung zwischen den Arbeitsgeräten in schräger Lage gehalten werden. 



   Die Rollen können auf einem an einem Förderergerüst befestigten Rahmen angeordnet sein, wobei die Rollen in einer Ebene mit einer Neigung von   5... 300 relativ   zur Senkrechten montiert und in benachbarten Reihen gegeneinander versetzt sind. 



   Die Zeichnungen stellen eine konkrete Ausführung der Bearbeitungsanlage für grossformatige Bauteile dar ; es zeigen Fig. l die Seitenansicht der Endbearbeitungsanlage für Bauplatten, Fig. 2 die 

 <Desc/Clms Page number 2> 

 Draufsicht auf dieselbe Anlage, Fig. 3 einen Schnitt durch dieselbe Anlage nach Linie   I-I   der   Fig. l, Fig. 4   einen Schnitt durch dieselbe Anlage nach Linie II-II der Fig. l und Fig. 5 einen Schnitt durch dieselbe Anlage nach Linie III-III der   Fig. 1.   



   Die in den Zeichnungen (Fig. l und 2) dargestellte Anlage besteht aus dem auf dem Gerüst   --l--   aufgesetzten   Wandertischförderer--2--mit Antriebsstation--3--und   Spannstation 
 EMI2.1 
 einen Seite des Förderers --2-- auf seinem   Gerüst--l--unter   einem Winkel von 80 (Fig. 3) relativ zur senkrechten Ebene-A-montiert. Die   Rollen --6-- befinden   sich in einer Ebene und in versetzter Anordnung. 



   Zum Ausrüsten der Platten mit Einlegeteilen, beispielsweise mit Fensterrahmen und Metallteilen, sowie zum Ausbessern unwesentlicher Fehler von Hand sind am   Gerüst-l-des Förderers-2-     Hubbühnen--10   und 11-- (Fig. 2) vorgesehen. Diese Bühnen befinden sich auf beiden Seiten des Förderers. Die Platten-B-sind auf einer Seite zur Bearbeitung vollkommen frei zugänglich ; auf der andern Seite sind an den erforderlichen Stellen die Abstände zwischen den   Rollen--6--so   weit vergrössert, dass Plattenoberflächenabschnitte freibleiben, die zur Nachbearbeitung mit Handwerkzeugen ausreichend sind. 
 EMI2.2 
 diese Seiten bearbeiten. 



   Die   Anstreicheinrichtung--8-- (Fig. 1, 2   und 5) besitzt   Düsen--12--zum   Aufspritzen der Farbe in der luftdicht geschlossenen Kammer-13-. 



   Die Trockenkammer--9- (Fig. l und 2) ist ein luftdicht gemachter, geheizter Raum, bei dessen Durchfahren die frischgestrichenen Platten trocknen. 



   Die Anlage arbeitet folgendermassen (Fig. l und 2) :
Platte-B-wird mittels Kran derartig auf den Wandertischförderer gesetzt, dass eine ihrer Seitenflächen auf den   Rollen     Rahmen-5-aufliegt   und eine ihrer Stirnflächen auf dem Förderer ruht. Da die   Rahmen --5-- mit   den   Rollen --6-- unter   einem Winkel von   80 relativ   zur Senkrechtebene --A-- angeordnet sind, nimmt die auf den Förderer aufgelegte   Platte-B-eine   geneigte Lage ein, die mit der Senkrechtebene denselben Winkel bildet. Mit dieser Neigung durchfährt die   Platte-B-die Abreibvorrichtung-7- (Fig. 1, 2   und 4), deren angetriebene Scheiben die Seitenflächen der Platte bearbeiten.

   Wenn erforderlich, können vor dem Abreiben mit Hilfe der   Hubbühnen --10-- (Fig. 2   und 3) von Hand verschiedenartige Fehler an der Platte beseitigt, beispielsweise Lunker zugestopft werden usw. Nach dem Abreiben können an die zu bearbeitende 
 EMI2.3 
    (Fig. 1, 2Trockenkammer-9- (Fig. 1, 2). Die   fertige Platte wird vor dem Herabnehmen vom Förderer besichtigt und, falls erforderlich, von der   Bühne--11--aus   bis zum Erreichen der erforderlichen Beschaffenheit nachbearbeitet. 



   Oben beschriebene Anlage gestattet es, Bauteile mit unterschiedlichen Abmessungen in einem Fertigungsfluss zu bearbeiten. Die Anlagenleistung beträgt bei der Bearbeitung von 6 x 3   X   0, 4 m grossen Platten 8... 12 St/h. 



   Die Anlage ist aus Standardteilen gebaut. Sie kann je nach dem erforderlichen Fertigungsgang bei der Bearbeitung von Bauteilen mit verschiedenartigen Arbeitsgeräten, beispielsweise mit einer Vorrichtung zur Vormontage der Platten, mit einer Vorrichtung zum Auflegen von Mosaik auf die Platten usw., zusammenarbeiten. 

**WARNUNG** Ende DESC Feld kannt Anfang CLMS uberlappen**.



   <Desc / Clms Page number 1>
 



   Processing system for large-format components, especially for silicate concrete and concrete slabs
The invention relates to processing systems for large-format components on which in particular silicate concrete and concrete slabs z. B. filled, rubbed off, completed with inserts, painted or otherwise surface-processed.



   Processing systems for components are known in which the components to be processed are shifted horizontally on a conveyor between the working devices, with their underside resting thereon. Only the top of the component remains accessible for processing. The component must be turned over to process its underside. Such a system is in operation in the large-scale Vyazov building construction plant in Moscow. The unavoidable shifting of the components lengthens the workflow during their processing and makes it difficult to automate the process.



   There are also known processing systems for components in which these are perpendicular to the conveyor. For example, in the Rostokino reinforced concrete construction plant (Moscow), silicate concrete slabs are placed on the conveyor during processing. They are held in the vertical position by a guide device which is arranged along the upper edge of the component.



   It is a disadvantage of these systems that only panels of a certain thickness and height can be processed on them, since the arrangement of the guide device depends on the dimensions of the components to be processed.



   The aim of the invention is to eliminate the drawbacks mentioned.



   The invention is based on the object of creating such a processing system for large-format components, in which the components to be processed are moved by the pulling strand of a conveyor between the working devices set up along the conveyor and are held by a guide device, the processing of components with different dimensions in a production flow on one or two sides is possible without moving the components and the workshop processing of the components can be completely finished with a minimum of time and effort and little space required.



   According to the invention this is achieved in that in the machining system for components, the guide device, for. B. in the form of rollers, is mounted on one side of the conveyor at an angle to the vertical, so that the components to be processed are held in an inclined position during their displacement between the tools.



   The rollers can be arranged on a frame attached to a conveyor frame, the rollers being mounted in a plane with an inclination of 5 ... 300 relative to the vertical and being offset from one another in adjacent rows.



   The drawings represent a specific version of the processing system for large-format components; FIG. 1 shows the side view of the finishing installation for building panels, FIG. 2 shows the

 <Desc / Clms Page number 2>

 Top view of the same system, FIG. 3 shows a section through the same system along line II in FIG. 1, FIG. 4 shows a section through the same system along line II-II in FIG. 1 and FIG. 5 shows a section through the same system along line III -III of FIG. 1.



   The system shown in the drawings (Fig. 1 and 2) consists of the moving table conveyor - 2 - with drive station - 3 - and tensioning station placed on the frame - 1 -
 EMI2.1
 one side of the conveyor --2-- on its frame - l - mounted at an angle of 80 (Fig. 3) relative to the vertical plane-A-. The roles --6-- are on one level and in a staggered arrangement.



   To equip the panels with inserts, for example window frames and metal parts, as well as to repair insignificant errors by hand, 2 lifting platforms - 10 and 11 - (Fig. 2) are provided on the frame-1-of the conveyor. These platforms are located on both sides of the conveyor. The panels-B-are completely freely accessible on one side for processing; on the other hand, the distances between the rollers - 6 - are enlarged so far at the required places that plate surface sections remain free which are sufficient for reworking with hand tools.
 EMI2.2
 edit these pages.



   The painting device -8- (Fig. 1, 2 and 5) has nozzles -12- for spraying the paint in the airtight chamber -13-.



   The drying chamber - 9- (Fig. 1 and 2) is an airtight, heated room, through which the freshly painted panels dry.



   The system works as follows (Fig. 1 and 2):
Plate-B-is placed on the traveling table conveyor by means of a crane in such a way that one of its side surfaces rests on the rollers of the frame-5-and one of its end surfaces rests on the conveyor. Since the frames --5-- with the rollers --6-- are arranged at an angle of 80 relative to the vertical plane --A--, the plate-B-placed on the conveyor assumes an inclined position, which corresponds to the Vertical plane forms the same angle. With this inclination, the plate-B-travels through the abrasion device-7- (FIGS. 1, 2 and 4), the driven disks of which machine the side surfaces of the plate.

   If necessary, various types of defects on the plate can be eliminated by hand using the lifting platforms --10-- (Fig. 2 and 3) before rubbing, for example, voids can be plugged, etc. After rubbing, you can move to the
 EMI2.3
    (Fig. 1, 2 drying chamber-9- (Fig. 1, 2). The finished panel is inspected before being removed from the conveyor and, if necessary, reworked from the platform - 11 - until the required quality is achieved.



   The system described above allows components with different dimensions to be processed in one production flow. The system output when processing 6 x 3 X 0.4 m panels is 8 ... 12 pieces / h.



   The system is built from standard parts. Depending on the production process required, it can work together with various types of tools, for example with a device for preassembling the panels, with a device for laying mosaic on the panels, etc. when processing components.

** WARNING ** End of DESC field may overlap beginning of CLMS **.

 

Claims (1)

PATENTANSPRÜCHE : 1. Bearbeitungsanlage für grossformatige Bauteile, vorzugsweise für Silikatbeton- und Betonplatten, bei der die zu bearbeitenden Bauteile durch den ziehenden Trum eines Förderers zwischen entlang dem Förderer aufgestellten Arbeitsgeräten verschoben und durch eine EMI2.4 <Desc/Clms Page number 3> Lage zu halten, die Führungseinrichtung, z. B. in Form von Rollen (6), auf der einen Seite des Förderers (2) unter einem Winkel relativ zur Senkrechtebene (A) montiert ist. EMI3.1 an einem Gerüst (1) des Förderers (2) befestigten Rahmen (5) angeordnet sind, wobei die Rollen (6) in einer Ebene mit einer Neigung von 5... 300 relativ zur Senkrechtebene (A) montiert und in benachbarten Reihen gegeneinander versetzt sind (Fig. l). PATENT CLAIMS: 1. Processing system for large-format components, preferably for silicate concrete and concrete slabs, in which the components to be processed are moved by the pulling strand of a conveyor between working devices set up along the conveyor and by a EMI2.4 <Desc / Clms Page number 3> Able to keep the guide device, e.g. B. in the form of rollers (6), on one side of the conveyor (2) is mounted at an angle relative to the vertical plane (A). EMI3.1 frames (5) attached to a frame (1) of the conveyor (2) are arranged, the rollers (6) being mounted in a plane with an inclination of 5 ... 300 relative to the vertical plane (A) and offset from one another in adjacent rows are (Fig. l).
AT306367A 1967-03-30 1967-03-30 Processing system for large-format components, especially for silicate concrete and concrete slabs AT265944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT306367A AT265944B (en) 1967-03-30 1967-03-30 Processing system for large-format components, especially for silicate concrete and concrete slabs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT306367A AT265944B (en) 1967-03-30 1967-03-30 Processing system for large-format components, especially for silicate concrete and concrete slabs

Publications (1)

Publication Number Publication Date
AT265944B true AT265944B (en) 1968-10-25

Family

ID=3544708

Family Applications (1)

Application Number Title Priority Date Filing Date
AT306367A AT265944B (en) 1967-03-30 1967-03-30 Processing system for large-format components, especially for silicate concrete and concrete slabs

Country Status (1)

Country Link
AT (1) AT265944B (en)

Similar Documents

Publication Publication Date Title
EP3662116A1 (en) Method for producing a ceiling element and ceiling formwork
DE2162850C2 (en) Device for washing out fines from the visible surface of freshly pressed concrete slabs or the like.
AT265944B (en) Processing system for large-format components, especially for silicate concrete and concrete slabs
DE2242492A1 (en) CONTINUOUS PRESS
DE2123478A1 (en) Mobile multiple formwork
DE1506898A1 (en) Processing system for large-format components, especially for silicate concrete and concrete slabs
DE2618437A1 (en) PLATE FILTER PRESS
EP0054167A2 (en) Apparatus for manufacturing a concrete panel
DE3641985A1 (en) Process for mounting or exchanging panels on facades
DE1854784U (en) TRANSLATION DEVICE FOR A PLANT FOR THE MANUFACTURE OF METAL CONSTRUCTIONS.
DE3010491C2 (en) Method for spraying liquid setting retardant onto the visible surfaces of exposed aggregate concrete slabs to be washed or the like. and device for carrying out the method
DE202020005527U1 (en) Arrangement for the production of at least one three-dimensional component for the construction industry
AT390226B (en) Apparatus for the installation and removal of press tools
DE2324549A1 (en) ASSEMBLY STATION FOR THE PRODUCTION OF ROOM BOXES
DE3147695A1 (en) ANTI-CORROSION PRE-TREATMENT PLANT
AT279770B (en) Device for painting panel building elements
DE1245298B (en) Roller mill
DE2824106A1 (en) SUPPORTING FRAME FOR CROSS BEAM
CH654228A5 (en) Apparatus for the production of casting moulds
DE3047114C1 (en) System for pressing cement-bonded chipboard
DE2032188A1 (en) Assembly facility
DE1197809B (en) Production line for steel components
DE3151666C2 (en) Wash-out device, in particular for the exhaust air from paint spray booths
DE1552349C (en) Covering device for guideways on machine tools or the like
DE2059455A1 (en) Device for the production of concrete slabs and the like.