<p>Documentation of material resources of the entire construction site.</p> Full article ">Figure 2
<p>A photograph of the Secemin Public Kindergarten (<b>a</b>) and a BIM model with a high degree of geometric detail (<b>b</b>).</p> Full article ">Figure 3
<p>Zoning.</p> Full article ">Figure 4
<p>Access paths to fire extinguishers (green color of the arrows indicates the access time that meets the standards).</p> Full article ">Figure 5
<p>Three-dimensional geometry of the BIM library component—children’s chair.</p> Full article ">Figure 6
<p>The model displayed in the BIMvision viewer.</p> Full article ">Figure 7
<p>A table with an assigned table in BIMvision (green color indicates the selected object and its parameters in the table).</p> Full article ">Figure 8
<p>A table with an assigned table in BricsCAD BIM.</p> Full article ">Figure 9
<p>Autodesk Tandem dashboard with equipment.</p> Full article ">