Skip to main content
Construction Management or project management is an activity of planning, organizing, directing and controlling of human resources, funds, time, technology and materials to achieve the objectives to be achieved. In planning the project... more
Construction Management or project management is an activity of planning, organizing, directing and controlling of human resources, funds, time, technology and materials to achieve the objectives to be achieved. In planning the project there are a variety of activities which are numerous, so we need a good management for timely execution of work efficiently and effectively as possible. Cost is one of the principal concerns in addition to scheduling processing managers control resources, every execution of development such as building roads, since it began a feasibility study and planning of consultants and contractors, the implementation by the contractor until the Operating, maintenance is definitely going to cost. The purpose of the analysis time in the implementation of this project is to study the behavior of the implementation of activities during project implementation. By the time the analysis is expected to set priorities at each stage, and when there are changes in timing of events can be predicted the consequences that can immediately take the necessary decisions. Resources are the most important component in a project plan. In this case the meaning of resource planning is the process of identifying the type and amount of resources according to a predetermined schedule purposes. The purpose of planning is to see to it the required resources are available just in time, should not be too early or too late, as both are sources of waste. Based on the analysis and discussion that has been done then obtained a total cost of Rp.28.442.299.500, 00 (including VAT 10%), human resources are in use during the project is 140 people, planning the project can be completed during the 240 days of work (8 Months) and operational costs of heavy equipment require 13 kinds of heavy equipment with the total cost. 4,488,885,217.0
In such a modern and complex era like today, urban millennials are used to growing up with digital era that works as a new (arus ruang gerak) in their lives as an individual and social being. The digital era grows slowly as a part of... more
In such a modern and complex era like today, urban millennials are used to growing up with digital era that works as a new (arus ruang gerak) in their lives as an individual and social being. The digital era grows slowly as a part of work, culture, and process that can not be separated from human lives. Nevertheless, in fulfilling their social needs, digital technology is usually used only as a media component which in the process is done secondarily where it tends to create a moral change towards individualistic. Therefore, a place that can accommodate social activities without letting the digital flow to stream free and unrestrained, and offers education on how to control the digital flow instead, is needed to fulfill social needs in this digital era. Architecture discusses how to fulfill the digital community needs as an existential tool, because despite everything, human still needs face-to-face communication as a primary means of communication. Digital Hub is presented as a pla...