Why were 800 m of the Boßler Tunnel built twice?–TBM passing a shotcrete section: Warum wurde der Boßlertunnel auf 800 m zweimal gebaut?–Durchfahrt einer …Goldberger et al., 2017
- Document ID
- 8313480427470068877
- Author
- Goldberger H
- Esslinger C
- Lützerath T
- Müller J
- Galli M
- Publication year
- Publication venue
- Geomechanics and Tunnelling
External Links
Snippet
Impermeable tunnels are usually built conventionally with drill and blast or excavators followed by an inner lining or by mechanized tunnelling method with a segment lining. A combination of both methods on certain sections is commonly used for large tunnels due to …
- 239000011378 shotcrete 0 abstract description 57
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B37/00—Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212563261U (en) | Half cut single-pressure type open cut tunnel advances hole protective structure fast | |
Spyridis et al. | Design of SCL structures in London/Entwurf von Tunnelbauwerken in Spritzbeton‐Bauweise am Beispiel London | |
Goldberger et al. | Why were 800 m of the Boßler Tunnel built twice?–TBM passing a shotcrete section: Warum wurde der Boßlertunnel auf 800 m zweimal gebaut?–Durchfahrt einer TVM durch eine Spritzbetonstrecke | |
Wagner et al. | The challenges of contract SBT1. 1 “Tunnel Gloggnitz"/Die Herausforderungen des Bauloses SBT1. 1 Tunnel Gloggnitz | |
Daller et al. | Special features of tendering contract SBT2. 1–Fröschnitzgraben Tunnel/Besonderheiten der Ausschreibung des Bauloses SBT2. 1–Tunnel Fröschnitzgraben | |
Incecik et al. | Tunnel T26 on the Ankara–Istanbul high speed rail route–Tunnelling under difficult conditions: Der Tunnel T26 auf Schnellstrecke Ankara–Istanbul–Vortrieb unter schwierigen geologischen Verhältnissen | |
Vetter et al. | Refurbishment of the Kuckuckslay tunnel–Current experience in the use of the” Tunnel‐im‐Tunnel‐Methode “ | |
Ehrbar et al. | Grouting works at the Gotthard Base Tunnel/Injektionsmaßnahmen am Gotthard‐Basistunnel | |
DE3803120C2 (en) | ||
Suchmann et al. | Intersection U2xU5–Tunnelling works at the lot U2/22 | |
Raderbauer | The autobahn ring Biel east branch/Autobahnumfahrung Biel Ostast | |
Flora et al. | Brenner Base Tunnel exploratory tunnel Ahrental‐Pfons–interaction between tunnel boring machine and rock mass as well as measures to manage fault zones | |
Blauhut et al. | Lower Tuxbach diversion–A high pressure diversion tunnel: Excavation and lining design for internal pressure greater than 20 bar | |
Bodenstab et al. | Solution Concepts for Mining and Geomechanical Challenges Involved in Safe Long-Term Closure of the Saale Shaft in the Teutschenthal Mine. | |
Harer et al. | The main Koralm Tunnel contracts–current state of works/Die Großbaulose des Koralmtunnels–Aktueller Stand der Arbeiten | |
Gamper et al. | Jenbach Tunnel–a shallow hydroshield drive | |
Lienhart et al. | Feuerbach and Bad Cannstatt Tunnels–special requirements of the inner‐city Location and difficult geotechnical Conditions | |
Schreitl et al. | How Asfinag decides construction methods/Baumethodenentscheidung bei der Asfinag | |
Herzeg et al. | St. Kanzian tunnel chain–Current state of works: Tunnelkette St. Kanzian–Aktueller Stand der Arbeiten | |
Vigl | System solutions for headraces of high head hydropower plants/Systemlösungen für Kraftabstiege von Hochdruck‐Wasserkraftanlagen: Design, structural design and construction considerations/Entwurf, Bemessung und baupraktische Aspekte | |
Gasser et al. | The Stockholm bypass project | |
Trunk et al. | Jet grouting in tunnelling/Düsenstrahlverfahren im Tunnelbau | |
DE3632189C3 (en) | Pressurized water gallery | |
Schmidt et al. | Planning and excavation of a special-profile, deep-level face start-up road at Prosper-Haniel colliery | |
Rengshausen et al. | Metro Doha Green Line–More than 30 km of tunnel in 18 months: Metro Doha Green Line–Mehr als 30 km Tunnel in 18 Monaten |