[go: up one dir, main page]

Cummins et al., 2012 - Google Patents

Increased Tubular Running Efficiency on Drilling Rigs

Cummins et al., 2012

Document ID
826887933179593419
Author
Cummins T
Sinnott A
Forestier D
Publication year
Publication venue
SPE Asia Pacific Oil and Gas Conference and Exhibition

External Links

Snippet

The drilling industry continually seeks enhanced technologies and processes that reduce time spent drilling and completing a well while maintaining well bore integrity, particularly with the installation of casing and tubing and the handling of tubulars in general. Over the …
Continue reading at onepetro.org (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • E21B17/04Couplings; joints between rod or the like and bit or between rod and rod or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B44/00Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00

Similar Documents

Publication Publication Date Title
Cummins et al. Increased Tubular Running Efficiency on Drilling Rigs
Teelken et al. Novel Use of Wired Drill Pipe for Real Time Remotely Operating Controls System During Well Completions
Hansen et al. Improving safety performance through rig mechanization
Shaughnessy et al. 20-plus years of Tuscaloosa drilling: Continuously optimizing deep HTHP wells
Major et al. Accelerating Drilling Efficiency and Consistency: A Rig-Based Approach to Exponential Drilling Program Improvements
Craig et al. The evolution of wired drilling tools: a background, history and learnings from the development of a suite of drilling tools for wired drillstrings
Hadi Keong et al. Hybrid Electro-Optical Cable Continuously Powers Downhole Coiled Tubing Telemetry and Enables Time and Carbon Footprint Reductions During Extensive Cleanout Interventions
Harris et al. The Mechanization of the Tubular Running and Handling Process
Woelfel et al. Breakthroughs in casing running efficiency utilizing modern pipe handling technology
Nwokoma et al. Rethinking the Typical Line-Item DWOP Exercise: Does it Present a Complete Picture?
Al Ghafri et al. Revolutionizing the Industry: Unprecedented Success of Cutting-Edge Mechanized Drilling Rigs in Breaking Field Records
Hassan et al. Offline Tubulars Bucking Service with Triplex Catwalks
PLESSIS et al. Drill pipe-based completion workover risers lower costs and increase operational efficiency
Hasler et al. Optimization of Casing Running Operations Using Automated TRS Technology
Rudnik et al. Coiled Tubing Operations on a Multi-Service Vessel for Deep Water Well Interventions in the Gulf of Mexico: A Decade of Experience
Mahmood et al. Enhancing Tubular Running Operations by Automation and Validating the Proof of Value in Well Construction Through an Intelligent and Autonomous Tong Solution
Eyitayo et al. Using a Land Rig in an Offshore Location: Some Lessons from a Niger-Delta Experience
Molnes et al. Application of a completion equipment reliability database in decision making
Wehling et al. A new rig for lean times: NDES for Brent Charlie
Al Darkazly et al. New Optimized Slot Recovery Method
Bocabarteille et al. Megathyst Units—Operational Optimization With Four Identical Drilling Rigs After Five Years of Operation
Eze et al. Cost Reduction Strategies in Workover operations in the Face of Low Oil Price: The Agbada Workover Project
Panhar et al. Walker Rig and Batch Drilling System Contribution in Reducing Moving Time and Increase Drilling Operation Efficiency in North Senoro Drilling Gas Field Development Project
Pathy et al. Integrated Engineering Approach Towards Re-Purposing Existing Wells in Peninsular Malaysia Asset for CCS in Depleted Reservoir
Richard et al. Improving Well Completion Efficiency Though the Implementation of Jointed Pipe Injector Technology