Stavropoulou et al., 2017 - Google Patents
based on geostatistical joint mappingStavropoulou et al., 2017
- Document ID
- 7620783534239425195
- Author
- Stavropoulou M
- Exadaktylos G
- Publication year
- Publication venue
- Rock Mechanics and Engineering Volume 1: Principles
External Links
- 238000013507 mapping 0 title description 22
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C27/00—Machines which completely free the mineral from the seam
- E21C27/20—Mineral freed by means not involving slitting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C47/00—Machines for obtaining or the removal of materials in open-pit mines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C35/00—Miscellaneous items relating to machines for slitting or completely freeing the mineral from the seam
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Gong et al. | Development of a rock mass characteristics model for TBM penetration rate prediction | |
Tóth et al. | Case studies of TBM tunneling performance in rock–soil interface mixed ground | |
Hassanpour et al. | Introduction of an empirical TBM cutter wear prediction model for pyroclastic and mafic igneous rocks; a case history of Karaj water conveyance tunnel, Iran | |
Delisio et al. | Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel | |
Balci et al. | Investigation into the effects of different rocks on rock cuttability by a V-type disc cutter | |
Bilgin et al. | Effect of replacing disc cutters with chisel tools on performance of a TBM in difficult ground conditions | |
Hassanpour et al. | A new hard rock TBM performance prediction model for project planning | |
Benato et al. | Prediction of penetration per revolution in TBM tunneling as a function of intact rock and rock mass characteristics | |
Hassanpour et al. | Evaluation of common TBM performance prediction models based on field data from the second lot of Zagros water conveyance tunnel (ZWCT2) | |
Li et al. | An analytical drilling model of drag bits for evaluation of rock strength | |
Rai et al. | An overview on measurement-while-drilling technique and its scope in excavation industry | |
Yasar et al. | Vertical rock cutting rig (VRCR) suggested for performance prediction of roadheaders | |
Exadaktylos et al. | A spatial estimation model for continuous rock mass characterization from the specific energy of a TBM | |
Lu et al. | Study on the tunneling response of TBM in stressed granite rock mass in Yinhan Water Conveyance tunnel | |
Jakubowski et al. | Multivariate linear regression and CART regression analysis of TBM performance at Abu Hamour phase-I tunnel | |
Dey et al. | Review of cuttability indices and a new rockmass classification approach for selection of surface miners | |
Tang et al. | Shield tunneling in rock–soil interface composite formations | |
Malinowska et al. | Geomechanical modeling of subsidence related strains causing earth fissures | |
Su | Numerical modeling of cuttability and shear behavior of chisel picks | |
Wu et al. | Rapid profiling rock mass quality underneath tunnel face for Sichuan-Xizang Railway | |
Stavropoulou et al. | Characterization of rock masses based on geostatistical joint mapping and rock boring operations | |
Oreste et al. | Probabilistic estimation of the advancement rate of the Tunnel Boring Machines on the basis of rock mass characteristics | |
Frough et al. | Study of the correlation between RMR and TBM downtimes | |
Ramezanzadeh et al. | Performance prediction models for hard rock tunnel boring machines | |
Stavropoulou et al. | based on geostatistical joint mapping |