Frodl, 2019 - Google Patents
Support structures for segments at the construction of cross passages in different soil conditionsFrodl, 2019
- Document ID
- 594491411985765958
- Author
- Frodl S
- Publication year
- Publication venue
- Geomechanics and Tunnelling
External Links
Snippet
Emergency exits must be available at certain intervals in tunnels for safety reasons. For this purpose, cross passages are excavated to a second tunnel tube, to shafts with staircases or separate exit tunnels. For the excavation of these emergency exits in TBM drives with …
- 239000002689 soil 0 title abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
- E21D11/083—Methods or devices for joining adjacent concrete segments
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
- E21D20/021—Grouting with inorganic components, e.g. cement
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0413693B1 (en) | Reinforced concrete construction for road tunnels | |
DE202018006560U1 (en) | Structure of a prefabricated assembly lining for a tunnel | |
DE2615395A1 (en) | PROCESS AND DEVICE FOR THE SUCCESSIVE INDEPENDENT DRIVING OF SEVERAL UNITS | |
Frodl | Support structures for segments at the construction of cross passages in different soil conditions | |
WO2007085479A1 (en) | Method and device for positional stabilising of tunnel lining elements | |
DE2823950C2 (en) | Shaft construction, especially for the construction of deep shafts in unstable, water-bearing mountains | |
DE3927446C1 (en) | Yieldable tunnel wall support - has segmental frames with sprayed concrete and infill | |
DE3218643A1 (en) | Method of producing an underground tunnel structure | |
DE2651149C3 (en) | Sealing process when producing tunnel gates by means of shield jacking devices and device for carrying out the process | |
DE2544834C3 (en) | Device for sinking shafts in unstable rock | |
EP1108855B1 (en) | Self-supporting waterproof vault for tunnel lining | |
EP0794318B1 (en) | Tunnel lining | |
Atzl et al. | Ground pressure‐dependent segment opening options for cross passages on Koralm Tunnel contract KAT3–Development of support types for cross passage excavation to segment‐lined tunnel | |
DE2250635B2 (en) | Method of making a tunnel | |
DE69718461T2 (en) | Method of making a clad tunnel | |
AT395894B (en) | Method for the driving of near-surface tunnels | |
DE1922118A1 (en) | Process for building tunnels and galleries, as well as a device for carrying out the process | |
CH656429A5 (en) | Arched installation element of steel and its use | |
DE3733344C2 (en) | ||
EP1722067A1 (en) | Tubing segment with supports for a lining sheet | |
DE3218642A1 (en) | Underground tunnel structure | |
DE2408038C3 (en) | Process to reduce subsidence in the expansion of multi-part underground cavities | |
DE69419220T2 (en) | Method and device for producing clad trenches in the ground and clad trenches | |
DE3400521C2 (en) | Process for the production of a single-shell tunnel expansion | |
Vigl | System solutions for headraces of high head hydropower plants/Systemlösungen für Kraftabstiege von Hochdruck‐Wasserkraftanlagen: Design, structural design and construction considerations/Entwurf, Bemessung und baupraktische Aspekte |