Establishment of optimal physical assets inspection frequency based on risk principles

SobrAl et al., 2015

View PDF
Document ID
5710061210053272653
Author
SobrAl J
Ferreira L
Publication year
Publication venue
Eksploatacja i Niezawodność

External Links

Snippet

Risk Based Inspection (RBI) is a risk methodology used as the basis for prioritizing and managing the efforts for an inspection program allowing the allocation of resources to provide a higher level of coverage on physical assets with higher risk. The main goal of RBI …
Continue reading at yadda.icm.edu.pl (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0635Risk analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/02Banking, e.g. interest calculation, credit approval, mortgages, home banking or on-line banking
    • G06Q40/025Credit processing or loan processing, e.g. risk analysis for mortgages

Similar Documents

Publication Publication Date Title
Urbina et al. Measuring the benefit of investing in pipeline safety using fuzzy risk assessment
Vianello et al. Cost–benefit analysis approach for the management of industrial safety in chemical and petrochemical industry
Kurasov et al. Substantiation of methods of improving safety of pipeline gas transportation
Song et al. Quantitative risk-based inspection approach for high-energy piping using a probability distribution function and modification factor
SobrAl et al. Establishment of optimal physical assets inspection frequency based on risk principles
Priyanta et al. The development of a risk-based maintenance flowchart to select the correct methodology to develop maintenance strategies of oil and gas equipment
Naubnome et al. Rısk analysis for pressure vessel with external corrosion using RBI method based on API 581
Pacaiova et al. Positive and negative aspect in application of maintenance management philosophy
Selvik et al. An extended methodology for risk based inspection planning
Bragatto et al. The management of mechanical integrity inspections at small-sized “Seveso” facilities
Milazzo et al. The influence of risk prevention measures on the frequency of failure of piping
Rahman et al. Safety of machinery and special scheme inspection’s requirement towards industry competitiveness in Malaysia
Ratnayake Utilization of piping inspection data for continuous improvement: a methodology to visualize coverage and finding rates
Khan et al. Risk-based inspection and maintenance (RBIM) of power plants
Trasatti Risk-Based Inspection and Integrity Management of Pipeline Systems
Lubis et al. Risk Assessment of Gas Pipeline using Risk based Inpection and Fault Tree Analysis
de Souza Matheus et al. Asset integrity management in mature process plants
Allahkaram et al. plant life management with respect to RBI and RBM
Ilkko Corrosion Circuits and Process Description: for Implementing Phosphoric acid Plant to RBI
Kenny HAZOP revalidation and focus on major accident hazards.
Yusoff et al. Risk-Based Inspection Methodologies for Oil Refineries
Narimisaa et al. Technical Inspection Engineering and Risk Based Inspection as index of efficient industrial management system
Rodery ASME Post Construction Standards: 25 Years of Progress
RU2574168C2 (en) Method to ensure industrial safety of high risk production site under conditions of increased interval between major overhauls
Deshotels et al. Choosing the level of detail for hazard identification