[go: up one dir, main page]

Johal, 2007 - Google Patents

Flow Assurance Technology Options For Deepwater & Long Distance Oil & Gas Transport.

Johal, 2007

Document ID
5391356089972023096
Author
Johal K
Publication year
Publication venue
Offshore Mediterranean Conference and Exhibition

External Links

Snippet

The design of oil and gas field pipeline systems for deepwater developments are invariably based on the cool down period during the production facilities unplanned shut down. The prediction of hydrate temperature for the production fluids is based on the reservoir fluids …
Continue reading at onepetro.org (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • E21B2043/0115Drilling for or production of natural gas hydrate reservoirs; Drilling through or monitoring of formations containing gas hydrates
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/01Risers
    • E21B17/015Non-vertical risers, e.g. articulated or catenary-type
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/52Compositions for preventing, limiting or eliminating depositions, e.g. for cleaning
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K2208/00Aspects relating to compositions of drilling or well treatment fluids
    • C09K2208/22Hydrates inhibition by using well treatment fluids containing inhibitors of hydrate formers

Similar Documents

Publication Publication Date Title
Mehta et al. Fulfilling the promise of low-dosage hydrate inhibitors: journey from academic curiosity to successful field implementation
Theyab Fluid flow assurance issues: literature review
US8430169B2 (en) Method for managing hydrates in subsea production line
Holm Tanzania gas development-flow assurance challenges
Baraka-Lokmane et al. Prediction of mineral scaling in a MEG loop system of a gas production offshore
Davoudi et al. Chemical injection policy for internal corrosion prevention of South Pars sea-pipeline: A case study
Qin et al. Predicting hydrate plugging risk in oil dominated systems using a transient hydrate film growth prediction tool
Davalath et al. Hydrate inhibition design for deepwater completions
Forsdyke Flow assurance in multiphase environments
Johal Flow Assurance Technology Options For Deepwater & Long Distance Oil & Gas Transport.
Hatscher et al. Nine Years Operational Experience of the Vega Field–Design, Experience, and Lessons Learned
Nava et al. Hydraulic evaluation of transport gas pipeline on offshore production
Shirah et al. Reliable Sub-Sea Umbilical and Down-Hole Injection Systems are an Integral Component of Successful Flow Assurance Programs
Saha et al. NUGGETS Gas Field: pushing the operational barriers
Freitas et al. Hydrate blockages in flowlines and subsea equipment in Campos Basin
Kanu et al. Mitigating hydrates in subsea oil flowlines: Consider production flow monitoring and control
Mandke et al. Single trip pigging of gas lines during late field life
Davalath et al. Flow assurance management for Bijupira and Salema field development
Stephens et al. Terra Nova-The Flow Assurance Challenge
Duartey et al. Flow Assurance in Subsea Flow and Safety Systems at the Jubilee Field
Meng et al. Changes of operating procedures and chemical application of a mature deepwater tie-back-Aspen field case study
ElSayed et al. The Flow assurance criticalities and challenges management of zohr deepwater giant gas field
Alary et al. Subsea water separation and injection: A solution for hydrates
Jenkins et al. Corrosion Mitigation of Deepwater, 143-km Long Multiphase Pipelines
Landsverk et al. Multiphase flow behaviour at Snøhvit