Johal, 2007 - Google Patents
Flow Assurance Technology Options For Deepwater & Long Distance Oil & Gas Transport.Johal, 2007
- Document ID
- 5391356089972023096
- Author
- Johal K
- Publication year
- Publication venue
- Offshore Mediterranean Conference and Exhibition
External Links
Snippet
The design of oil and gas field pipeline systems for deepwater developments are invariably based on the cool down period during the production facilities unplanned shut down. The prediction of hydrate temperature for the production fluids is based on the reservoir fluids …
- 238000005516 engineering process 0 title abstract description 10
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B2043/0115—Drilling for or production of natural gas hydrate reservoirs; Drilling through or monitoring of formations containing gas hydrates
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
- E21B17/015—Non-vertical risers, e.g. articulated or catenary-type
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K8/00—Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
- C09K8/52—Compositions for preventing, limiting or eliminating depositions, e.g. for cleaning
-
- C—CHEMISTRY; METALLURGY
- C09—DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; MISCELLANEOUS COMPOSITIONS; MISCELLANEOUS APPLICATIONS OF MATERIALS
- C09K—MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C09K2208/00—Aspects relating to compositions of drilling or well treatment fluids
- C09K2208/22—Hydrates inhibition by using well treatment fluids containing inhibitors of hydrate formers
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Mehta et al. | Fulfilling the promise of low-dosage hydrate inhibitors: journey from academic curiosity to successful field implementation | |
Theyab | Fluid flow assurance issues: literature review | |
US8430169B2 (en) | Method for managing hydrates in subsea production line | |
Holm | Tanzania gas development-flow assurance challenges | |
Baraka-Lokmane et al. | Prediction of mineral scaling in a MEG loop system of a gas production offshore | |
Davoudi et al. | Chemical injection policy for internal corrosion prevention of South Pars sea-pipeline: A case study | |
Qin et al. | Predicting hydrate plugging risk in oil dominated systems using a transient hydrate film growth prediction tool | |
Davalath et al. | Hydrate inhibition design for deepwater completions | |
Forsdyke | Flow assurance in multiphase environments | |
Johal | Flow Assurance Technology Options For Deepwater & Long Distance Oil & Gas Transport. | |
Hatscher et al. | Nine Years Operational Experience of the Vega Field–Design, Experience, and Lessons Learned | |
Nava et al. | Hydraulic evaluation of transport gas pipeline on offshore production | |
Shirah et al. | Reliable Sub-Sea Umbilical and Down-Hole Injection Systems are an Integral Component of Successful Flow Assurance Programs | |
Saha et al. | NUGGETS Gas Field: pushing the operational barriers | |
Freitas et al. | Hydrate blockages in flowlines and subsea equipment in Campos Basin | |
Kanu et al. | Mitigating hydrates in subsea oil flowlines: Consider production flow monitoring and control | |
Mandke et al. | Single trip pigging of gas lines during late field life | |
Davalath et al. | Flow assurance management for Bijupira and Salema field development | |
Stephens et al. | Terra Nova-The Flow Assurance Challenge | |
Duartey et al. | Flow Assurance in Subsea Flow and Safety Systems at the Jubilee Field | |
Meng et al. | Changes of operating procedures and chemical application of a mature deepwater tie-back-Aspen field case study | |
ElSayed et al. | The Flow assurance criticalities and challenges management of zohr deepwater giant gas field | |
Alary et al. | Subsea water separation and injection: A solution for hydrates | |
Jenkins et al. | Corrosion Mitigation of Deepwater, 143-km Long Multiphase Pipelines | |
Landsverk et al. | Multiphase flow behaviour at Snøhvit |