Kamsu-Foguem, 2016 - Google Patents
Information structuring and risk-based inspection for the marine oil pipelinesKamsu-Foguem, 2016
View PDF- Document ID
- 5273463353011394710
- Author
- Kamsu-Foguem B
- Publication year
- Publication venue
- Applied Ocean Research
External Links
Snippet
The proposed work is incorporated into the research theme concerning the maintenance and inspection of sensitive facilities in production systems. It is essential to promote the methodological deployment of inspection techniques to ensure the good functioning of …
- 238000007689 inspection 0 title abstract description 119
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Kamsu-Foguem | Information structuring and risk-based inspection for the marine oil pipelines | |
| US12398847B2 (en) | System for providing integrated pipeline integrity data | |
| Animah et al. | Condition assessment, remaining useful life prediction and life extension decision making for offshore oil and gas assets | |
| Selvik et al. | A framework for reliability and risk centered maintenance | |
| De Sanctis et al. | Integration between RCM and RAM: a case study | |
| Tammer et al. | Fatigue oriented risk based inspection and structural health monitoring of FPSOs | |
| Okoro et al. | Multicriteria risk assessment framework for components' risk ranking: Case study of a complex oil and gas support structure | |
| Bai et al. | Risk assessment and management for ships and offshore structures | |
| Ozguc | A new risk-based inspection methodology for offshore floating structures | |
| Ratnayake | Mechanization of static mechanical systems inspection planning process: The state of the art | |
| Singh et al. | Offshore integrity management 20 years on-an overview of lessons learnt post piper alpha | |
| Melo et al. | A framework for risk-based integrity assessment of unpiggable pipelines subject to internal corrosion | |
| G Bea | Risk assessment and management of offshore structures | |
| Qureshi et al. | Risk-based inspection in offshore structures: a systematic approach | |
| Seneviratne et al. | In-service inspection of static mechanical equipment on offshore oil and gas production plants: a decision support framework | |
| Marhaug et al. | Criticality analysis for maintenance purposes of platform supply vessels in remote areas | |
| Mattioli et al. | New Frontiers for the Pipeline Integrity Management | |
| Iqbal | A risk-based assessment of integrity management program for oil and gas pipelines: a regulatory perspective | |
| Singh et al. | Offshore pipeline risk, corrosion, and integrity management | |
| Akbar et al. | Fixed-Roof Hydrocarbon Oil Storage Tank: An Approach to Reliability Engineering Tools | |
| Moreno-Trejo et al. | Identifying challenges in the maintenance of subsea petroleum production systems | |
| Trasatti | Risk-based inspection and integrity Management of Pipeline Systems | |
| Stokes | Decommissioning costs can be reduced | |
| Xu et al. | Risk Based'Optimum'Inspection for FPSO Hulls | |
| Galbraith et al. | Recommendations for design life extension regulations |