Li et al., 2012 - Google Patents
Horizontal Installation of TLP TendonsLi et al., 2012
- Document ID
- 4789388982236044670
- Author
- Li G
- Kipp R
- Leverette S
- Publication year
- Publication venue
- International Conference on Offshore Mechanics and Arctic Engineering
External Links
Snippet
Tension Leg Platforms (TLPs) are ideal supports for dry-tree top tension riser systems because their tendons exhibit high tensile stiffness and significantly reduce the heave, pitch, and roll motions of the platforms. Since the first TLP (Hutton) was installed in the North Sea …
- 210000002435 Tendons 0 title abstract description 202
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
- B63B21/507—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers with mooring turrets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
- B63B2021/505—Methods for installation or mooring of floating offshore platforms on site
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or like floating structures adapted for special purposes
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
- E21B17/012—Risers with buoyancy elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick
- E21B19/002—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick specially adapted for underwater drilling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/22—Handling or lashing of anchors
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/18—Stoppers for anchor chains
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Loading or unloading cargo or passengers
- B63B27/30—Arrangement of ship-based loading or unloading equipment for transfer at sea between ships or between ships and off-shore structures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/01—Risers
- E21B17/015—Non-vertical risers, e.g. articulated or catenary-type
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B22/00—Buoys
- B63B22/02—Buoys specially adapted for mooring a vessel
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/013—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations connecting a production flow line to an underwater well head
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5944448A (en) | Oil field installation with mooring and flowline system | |
US6009825A (en) | Recoverable system for mooring mobile offshore drilling units | |
US20160185427A1 (en) | Anchor line tensioning method | |
US8262319B2 (en) | Freestanding hybrid riser system and method of installation | |
US6435124B1 (en) | Mooring and flowline system | |
US7849810B2 (en) | Mating of buoyant hull structure with truss structure | |
EP3072804B1 (en) | A method of installing a buoy at an anchoring location | |
WO2011099869A2 (en) | A method of installing a flexible, elongate element | |
Wang et al. | Latest progress in deepwater installation technologies | |
US6893190B2 (en) | Method and structure for connecting a floating structure with rope anchor lines to the seabed | |
CN107013743A (en) | Deep water hydrocarbon platform steel catenary riser installation method | |
EP0729882B1 (en) | Mooring and flowline system | |
CN106232468B (en) | Outer capstan head with steering framing wheel | |
US8690483B2 (en) | Method for assembling tendons | |
Li et al. | Horizontal Installation of TLP Tendons | |
EP2398695B1 (en) | Deep water and ultra deep water mooring system | |
US20080089745A1 (en) | Method And Device For Connecting A Riser To A Target Structure | |
CA1223486A (en) | Riser moored floating production system | |
Prischi et al. | SS-offshore offloading systems and operations bonded flexible oil offloading lines, a cost effective alternative to traditional oil offloading lines | |
USH1372H (en) | Method for mating floating sections of an offshore structure | |
Bouwman | Installation challenges with lifting and pull-in of the 20" SCR | |
Wilkinson et al. | Installation of Mooring and Riser Systems for Floating Production Vessels | |
Li et al. | Installation of STP mooring system and FPSO hookup in south china Sea | |
Couch et al. | Independence installation | |
Bensimon et al. | Deepwater Installation of a Large Capacity FPSO with Large Number of Risers in the Marlim Field |