Dupriest et al., 2024 - Google Patents
Continued Advances in Performance in Geothermal Operations at FORGE Through Limiter-Redesign Drilling PracticesDupriest et al., 2024
- Document ID
- 4690065133021793623
- Author
- Dupriest F
- Noynaert S
- Publication year
- Publication venue
- SPE/IADC Drilling Conference and Exhibition
External Links
Snippet
The continued application of physics-based limiter redesign workflow in the hard geothermal granite at the Utah FORGE project resulted in additional advances in hard rock practices and performance. The physics-based approach provided an effective framework to mitigate …
- 238000005553 drilling 0 title abstract description 103
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/06—Deflecting the direction of boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/10—Wear protectors; Centralising devices, e.g. stabilisers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/20—Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/08—Roller bits
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives used in the borehole
- E21B4/02—Fluid rotary type drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives used in the borehole
- E21B4/04—Electric drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives used in the borehole
- E21B4/006—Mechanical motion converting means, e.g. reduction gearings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs, or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Dupriest et al. | Continued Advances in Performance in Geothermal Operations at FORGE Through Limiter-Redesign Drilling Practices | |
| Shaughnessy et al. | Problems of ultra-deep high-temperature, high-pressure drilling | |
| James et al. | Successful Optimization Strategies Combine to Deliver Significant Performance Boost at the Edge of the ERD Envelope, Sakhalin Island, Russia | |
| Glebov et al. | Yurkharovskoye extended reach drilling campaign resulted in the successful completion of record multilateral well | |
| Zakariya et al. | A case study of real-time drilling optimization to improve well delivery through enhancing drilling rates and identifying invisible lost time to improve performance | |
| Paila et al. | Technologies and practices to push the extended reach drilling envelope within the existing constraints | |
| Mason et al. | The Perfect Wellbore! | |
| Green et al. | An Integrated Solution of Extended-Reach Drilling Problems in the Niakuk Field, Alaska: Part II-Hydraulics, Cuttings Transport and PWD | |
| Ruzhnikov | Case study: Saving Days via Change of Connection Practices While Drilling | |
| Ikeda et al. | An investigative study on horizontal well and extended reach technologies with reported problem areas and operational practice in North America and Europe | |
| Ovwigho et al. | Drilling System Optimization Leads to Expedited Wells Delivery | |
| Maehs et al. | Proven Methods and Techniques to Reduce Torque and Drag in the PrePlanning and Drilling Execution of Oil and Gas Wells | |
| Beeh et al. | Thorough analysis and commitment for improvement led to a step change in the drilling performance on valemon field, north sea | |
| AlGaiar et al. | Successful Optimization Roadmap Enhanced the Drilling Performance in the 8.5 Inch Lateral Sections of Extended Reach Multilateral Wells | |
| Simonton et al. | Influx of Advanced Drilling Technologies Maximizing Productivity of Mature Region | |
| Al Mutawa et al. | Robust Design of Rotary Steerable System RSS and Revised Drilling Procedure Deliver Superior Performance in a UAE Onshore Field. | |
| Houtchens et al. | Applying risk analysis to casing while drilling | |
| Muñoz et al. | Directional Casing While Drilling (CwD) Reestablished as Viable Technology in Saudi Arabia | |
| Olawale et al. | Optimizing wellbore cleaning operations in high horizontal depth (HD)-To-Total Vertical Depth (TVD) ratio wells: insights from case studies in challenging well profiles | |
| Amar et al. | CwD–Enables for Successful Extended Reach Drilling. First Time with 9 5/8" Casing at High Angle | |
| Yudhia et al. | First Deployments of Friction Adjustable Stabilizer Technology in the GCC | |
| Shahin et al. | Casing Drilling Resulted in Slimmer Hole Design and Significant Cost Savings in the WON Field in Egypt | |
| Gao et al. | Successful Development of Changbei Marginal Tight Gas Field: Dual Lateral Horizontal Well and Significant Drilling Performance Improvement | |
| Abdelaal et al. | Successful Delivery of Top Quartile Drilling Performance for Multiple Extended-Reach Wells Using an Integrated Multidisciplinary and Novel Operational Excellence Approach in Malaysia | |
| Terimo et al. | Optimizing Offshore Infill Drilling: Application of Conductor Sharing and Casing Drilling Techniques |