Shao et al., 2023 - Google Patents

Underground haulage network design using HDBSCAN and RRT algorithms built on Dubins path

Shao et al., 2023

Document ID
4270967915060420764
Author
Shao Z
Moon Y
Yang Y
Kumral M
Publication year
Publication venue
Mining, Metallurgy & Exploration

External Links

Snippet

Since the discoveries of favorable deposits are becoming increasingly difficult, mining operations shift to lower grade and deeper deposits. The viability of these operations is sensitive to many factors, such as commodity prices and operating costs. Given that a mining …
Continue reading at link.springer.com (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/50Computer-aided design
    • G06F17/5068Physical circuit design, e.g. layout for integrated circuits or printed circuit boards
    • G06F17/5077Routing
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models

Similar Documents

Publication Publication Date Title
Choi et al. Multi‐criteria evaluation and least‐cost path analysis for optimal haulage routing of dump trucks in large scale open‐pit mines
Alford et al. Optimisation in underground mining
Goyal et al. Use of BIM in development of smart cities: a review
Baek et al. A new method for haul road design in open-pit mines to support efficient truck haulage operations
Nhleko et al. A review of underground stope boundary optimization algorithms
Paricheh et al. A heuristic approach for in-pit crusher and conveyor system’s time and location problem in large open-pit mining
CN113268678A (en) Semantic mining method and device for vehicle stop points, storage medium and terminal
Brazil et al. Network optimization for the design of underground mines
Vázquez‐Méndez et al. An algorithm for random generation of admissible horizontal alignments for optimum layout design
US9773075B2 (en) Underground tactical optimization
Vasylchuk et al. Optimization of surface mining dig limits with a practical heuristic algorithm
Londoño et al. Modelling of in-pit crusher conveyor alternatives
Gu et al. Layout optimization of crushing station in open-pit mine based on two-stage fusion particle swarm algorithm
Fan et al. An improved JPS algorithm for global path planning of the seabed mining vehicle
Morales et al. Development and analysis of a methodology to generate operational open-pit mine ramp designs automatically
Shao et al. Underground haulage network design using HDBSCAN and RRT algorithms built on Dubins path
Zhironkin et al. Development of surface mining 4.0 in terms of technological shock in energy transition: a review
Md Ayman et al. A multi-road quasi network flow model for the vertical alignment optimization of a road network
Liu et al. Simulation and optimization of temporary road network in mass earthmoving projects
Wan et al. Railway alignment optimization in regions with densely-distributed obstacles based on semantic topological maps
CN117723076A (en) Underground mine truck unmanned path planning method and system based on improved Dijkstra
Deutsch Open-pit mine planning with operational constraints
Maji Optimization of horizontal highway alignment using a path planner method
Brazil et al. Optimisation in the design of underground mine access
Nancel-Penard et al. A direct block scheduling model considering operational space requirement for strategic open-pit mine production planning