Ballal et al., 2013 - Google Patents
Computational intelligence algorithm based condition monitoring system for power transformerBallal et al., 2013
- Document ID
- 4051474144074266886
- Author
- Ballal M
- Ballal D
- Suryawanshi H
- Choudhari B
- Publication year
- Publication venue
- 2013 IEEE 1st International Conference on Condition Assessment Techniques in Electrical Systems (CATCON)
External Links
Snippet
This paper presents Computational Intelligence Algorithm (CIA) based Condition Monitoring System (CMS) for Power Transformer. The online as well as offline data is used for making the decision. The mechanism is developed for real time application using the analogue to …
- 238000004422 calculation algorithm 0 title abstract description 9
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/12—Testing dielectric strength or breakdown voltage; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
- G01R31/1227—Testing dielectric strength or breakdown voltage; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing of components, parts or materials
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/02—Testing of electric apparatus, lines or components, for short-circuits, discontinuities, leakage of current, or incorrect line connection
- G01R31/027—Testing of transformers
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/34—Testing dynamo-electric machines
- G01R31/343—Testing dynamo-electric machines in operation
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Abu-Elanien et al. | Asset management techniques for transformers | |
Arshad et al. | Fuzzy logic approach in power transformers management and decision making | |
US6446027B1 (en) | Intelligent analysis system and method for fluid-filled electrical equipment | |
Padmanaban et al. | Determination of power transformers health index using parameters affecting the transformer’s life | |
BR112015018578B1 (en) | System and method for determining a health of an electrical transmission or distribution resource | |
EP1085635A2 (en) | Fluid-filled electrical equipment intelligent analysis system and method | |
Srinivasan et al. | Effects of environmental factors in transformer’s insulation life | |
Romero et al. | An overview on power transformer management: Individual assets and fleets | |
Ristic et al. | Method for determining optimal power transformers exploitation strategy | |
Dhanraj et al. | Design on IoT based real time transformer performance monitoring system for enhancing the safety measures | |
CN119001319A (en) | Monitoring system and monitoring method for superconducting cable | |
Ballal et al. | Computational intelligence algorithm based condition monitoring system for power transformer | |
Krieg et al. | Techniques and experience in on-line transformer condition monitoring and fault diagnosis in ElectraNet SA | |
CN117575247A (en) | Province-station scheduling management method and system | |
Shahbazi et al. | Transformer condition monitoring system for smart grid | |
Jaiswal et al. | A review of diagnostic tests and condition monitoring techniques for improving the reliability of power transformers | |
Ballal et al. | Online condition assessment of power transformers using neural network | |
Velasquez et al. | Development and implementation of a condition monitoring system in a substation | |
Arabul et al. | An investigation on hot-spot temperature calculation methods of power transformers | |
Morais et al. | Condition assessment of power transformers through the integration of historical and on-line data in a multi-agent system | |
Santillan et al. | Time-series prediction of busbar temperature rise based on LSTM neural network | |
Moxley et al. | Transformer maintenance interval management | |
Agarwal et al. | Implementation of remaining useful lifetime transformer models in the fleet-wide prognostic and health management suite | |
Nacano et al. | An ML-based Strategy to Identify Insulation Degradation in High Voltage Capacitive Bushings | |
Amirioun et al. | A Real-time Condition Monitoring-based Asset Management Model for Power Transformers in the Presence of Distributed Generation |