Simlote et al., 1981 - Google Patents
Estimation of Tertiary Recovery by CO2 Injection-Springer A Sand, Northeast Purdy UnitSimlote et al., 1981
- Document ID
- 2940731802984870334
- Author
- Simlote V
- Withjack E
- Publication year
- Publication venue
- Journal of Petroleum Technology
External Links
Snippet
Introduction The northeast Purdy Springer A sand reservoir is in Garvin County, OK (Fig. 1). The original oil in place (OOIP) was approximately 225 million STB (35.8× 10 stock-tank m). Primary production from the field began in 1951. The waterflood was developed in three …
- 238000011084 recovery 0 title abstract description 33
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/166—Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium
- E21B43/168—Injecting a gaseous medium
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/164—Injecting CO2 or carbonated water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B2043/0115—Drilling for or production of natural gas hydrate reservoirs; Drilling through or monitoring of formations containing gas hydrates
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/1015—Locating fluid leaks, intrusions or movements using tracers: using radioactivity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7289942B2 (en) | Performance prediction method for hydrocarbon recovery processes | |
Sanchez | Management of water alternating gas (WAG) injection projects | |
Stiles | Optimizing waterflood recovery in a mature waterflood, the Fullerton Clearfork Unit | |
Burgess et al. | Formation, distribution, and prediction of stylolites as permeability barriers in the Thamama Group, Abu Dhabi | |
Zhu et al. | Study of gas migration in the fissures of closed goaf and CH 4 production characteristics in vertical wells under different gas injection conditions | |
Mathews et al. | Fractal methods improve Mitsue miscible predictions | |
Glandt et al. | Coral creek field study: A comprehensive assessment of the potential of high-pressure air injection in a mature waterflood project | |
Christian et al. | Planning a tertiary oil-recovery project for Jay/LEC fields unit | |
Simlote et al. | Estimation of Tertiary Recovery by CO2 Injection-Springer A Sand, Northeast Purdy Unit | |
Tollefsen et al. | The Gullfaks field development: Challenges and perspectives | |
Tang et al. | Reservoir studies with geostatistics to forecast performance | |
Garcia | A successful gas-injection project in a heavy oil reservoir | |
Feng et al. | Water-injection optimization for a complex fluvial heavy-oil reservoir by integrating geological, seismic, and production data | |
DesBrisay et al. | Supplemental Recovery Development of The Intisar" A" and" D" Reef Fields, Libyan Arab Republic | |
Qi | Simulation of geological carbon dioxide storage | |
Raines | Kelly-Snyder (Cisco-Canyon) Fields/SACROC unit | |
Warner Jr et al. | University block 31 field study: Part 1-middle Devonian reservoir history match | |
Fuller et al. | Screening waterfloods for infill drilling opportunities | |
Bayat et al. | The Thistle Field–Analysis of its Past Performance and Optimisation of its Future Development | |
Frimodig et al. | Design of a tertiary hydrocarbon miscible flood for the Mitsue Reservoir | |
Moralee et al. | Reservoir Engineering of a Geologically Complex North Sea Eocene/Palaeocene Reservoir With Highly Unfavourable Mobility Ratio and Gas/Water Coning | |
Abzaletdinov | Development Strategies For a Fractured, Heavy Oil Reservoir-Results From Numerical Simulations | |
Thu et al. | Exploration, development, and reservoir engineering studies for the tapis field offshore Peninsular Malaysia | |
El-Banbi et al. | An Integrated Approach To Optimizing a Large Asset | |
Weaver | Simulation of Waterflood Behavior in a Reservoir Previously Invaded by Water |