Hjort, 1982 - Google Patents
Reinforcement Work on Construction Sites: A General StudyHjort, 1982
View PDF- Document ID
- 2370338050508612475
- Author
- Hjort B
- Publication year
External Links
Snippet
Reinforcement is of fundamental importance for the function and safety of a reinforced concrete structure. Because of this, reinforcement and reinforced concrete have been subjected to detailed and extensive research in the field of materials technology and …
- 230000002787 reinforcement 0 title abstract description 134
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063116—Schedule adjustment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06313—Resource planning in a project environment
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69618598T2 (en) | TRANSPORTABLE MANUFACTURING SYSTEM FOR THE PRODUCTION OF APARTMENTS IN STANDARD SIZE | |
DE69610634T2 (en) | METHOD FOR THE PRODUCTION OF APARTMENTS IN STANDARD SIZE WITH THE HELP OF A TRANSPORTABLE PRODUCTION PLANT | |
Elbeltagi et al. | Dynamic layout of construction temporary facilities considering safety | |
CN101460267A (en) | Method and system for manufacturing a structure | |
KR20240004188A (en) | Structure construction method for multiple buildings with wall structure | |
KR20230169923A (en) | An apparatus and method for analyzing a working area and route of form worker and rebar worker at a housing construction | |
Ikeda et al. | Application of the automated building construction system using the conventional construction method together | |
Salim et al. | Effects of design-integrated process planning on productivity in rebar placement | |
Hjort | Reinforcement Work on Construction Sites: A General Study | |
Tam | Impact on structure of labour market resulting from large-scale implementation of prefabrication | |
DE969645C (en) | Reinforcement arrangement for flat reinforced concrete components | |
DE102019125300A1 (en) | Method for the reinforcement of a reinforced concrete component | |
Becker et al. | Safety hazards to workers in modular home construction | |
Pan et al. | Full-span pre-cast launching method (FPLM) analysis with dynamic simulation—Case studies of Taiwan High-Speed Rail (THSR) Project | |
Neil et al. | Robot implementation decisions in the Australian construction industry | |
Heineck et al. | Transparency in building construction: a case study | |
US20240177252A1 (en) | Strong mounting system for greased plastic-coated prestressing tendons, intelligent reusable modular structure, strong support and fastener for fastening a tendon in a strong support | |
Brink et al. | SLAM—A case study in applying lean to job shops | |
Tucker et al. | IE Applications to Precast Erection Project | |
Santiago | San Luis Obispo Botanical Garden Children’s Garden Shed | |
Liu et al. | Analysis of non-value-adding activities in prefabricated building construction project: Case study | |
Mitchell et al. | Technology assessment of automation trends in the modular home industry | |
DE842539C (en) | Lightweight girders or binders | |
Florez | Decision support system for masonry labor planning and allocation considering productivity and social sustainability | |
JPS6345343Y2 (en) |