[go: up one dir, main page]

Hjort, 1982 - Google Patents

Reinforcement Work on Construction Sites: A General Study

Hjort, 1982

View PDF
Document ID
2370338050508612475
Author
Hjort B
Publication year

External Links

Snippet

Reinforcement is of fundamental importance for the function and safety of a reinforced concrete structure. Because of this, reinforcement and reinforced concrete have been subjected to detailed and extensive research in the field of materials technology and …
Continue reading at nordicconcrete.net (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06313Resource planning in a project environment

Similar Documents

Publication Publication Date Title
DE69618598T2 (en) TRANSPORTABLE MANUFACTURING SYSTEM FOR THE PRODUCTION OF APARTMENTS IN STANDARD SIZE
DE69610634T2 (en) METHOD FOR THE PRODUCTION OF APARTMENTS IN STANDARD SIZE WITH THE HELP OF A TRANSPORTABLE PRODUCTION PLANT
Elbeltagi et al. Dynamic layout of construction temporary facilities considering safety
CN101460267A (en) Method and system for manufacturing a structure
KR20240004188A (en) Structure construction method for multiple buildings with wall structure
KR20230169923A (en) An apparatus and method for analyzing a working area and route of form worker and rebar worker at a housing construction
Ikeda et al. Application of the automated building construction system using the conventional construction method together
Salim et al. Effects of design-integrated process planning on productivity in rebar placement
Hjort Reinforcement Work on Construction Sites: A General Study
Tam Impact on structure of labour market resulting from large-scale implementation of prefabrication
DE969645C (en) Reinforcement arrangement for flat reinforced concrete components
DE102019125300A1 (en) Method for the reinforcement of a reinforced concrete component
Becker et al. Safety hazards to workers in modular home construction
Pan et al. Full-span pre-cast launching method (FPLM) analysis with dynamic simulation—Case studies of Taiwan High-Speed Rail (THSR) Project
Neil et al. Robot implementation decisions in the Australian construction industry
Heineck et al. Transparency in building construction: a case study
US20240177252A1 (en) Strong mounting system for greased plastic-coated prestressing tendons, intelligent reusable modular structure, strong support and fastener for fastening a tendon in a strong support
Brink et al. SLAM—A case study in applying lean to job shops
Tucker et al. IE Applications to Precast Erection Project
Santiago San Luis Obispo Botanical Garden Children’s Garden Shed
Liu et al. Analysis of non-value-adding activities in prefabricated building construction project: Case study
Mitchell et al. Technology assessment of automation trends in the modular home industry
DE842539C (en) Lightweight girders or binders
Florez Decision support system for masonry labor planning and allocation considering productivity and social sustainability
JPS6345343Y2 (en)