East et al., 1995 - Google Patents
The Reviewer's Assistant System: System Design Analysis and Description.East et al., 1995
View PDF- Document ID
- 2240050155098698382
- Author
- East E
- Roessler T
- Lustig M
- Fu M
- Publication year
External Links
Snippet
The objective of the research leading to this report was to identify ways to improve design quality through enhancement of the Biddability, Constructibility, and Operability compliance review process. The system that resulted from this project, the Reviewers Assistant, allows …
- 238000004458 analytical method 0 title abstract description 29
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants, factories
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Merritt | Building design and construction handbook | |
Olusegun et al. | Design inadequacies and the maintenance of university buildings in Ilf-Ife, Nigeria | |
East et al. | The Reviewer's Assistant System: System Design Analysis and Description. | |
Tricker et al. | Building regulations in brief | |
Zubairu | Maintenance of government office buildings in Nigeria: A post-occupancy evaluation approach | |
WILSON | Alligator River National Wildlife Refuge Visitors Center HVAC Replacement | |
Arnold | Design guide for improving school safety in earthquakes, floods, and high winds: providing protection to people and buildings | |
Madsen et al. | Modern residential construction practices | |
ENGINEERS | PSJA ISD HVAC REPLACEMENT & ADDITIONS TO CLOVER, GARCIA, & DOEDYNS ELEMENTARY | |
Longinow | CIVIL DEFENSE SHELTER OPTIONS FOR FALLOUT AND BLAST PROTECTION (DUAL-PURPOSE). Final Report. | |
SET | Jerome High School Track Replacement | |
AUTHORITY | REHAB OF SECURITY SYSTEMS AT APV & HOAPV | |
CHARLESTON et al. | NORTH CHARLESTON CENTER FOR ADVANCED STUDIES | |
Wilkes-Barre | PROJECT SPECIFICATIONS | |
Sioux Falls | Redesign Upgrade Station Generator System–PSDM Redesign | |
COUNTY et al. | ROOSEVELT COUNTY FAIRGROUNDS PAVILION IMPROVEMENTS | |
AE&M | CHILDRESS DISTRICT-25 | |
Simpkins et al. | Coordinating Mechanical Upgrades in a Landmark State Capitol Building | |
Bidders et al. | SPECIAL ADMINISTRATIVE BOARD OF THE TRANSITIONAL SCHOOL DISTRICT OF THE CITY OF ST. LOUIS _ RFP TITLE: Mechanical Modernization at Wyman School | |
Stanford | BIDS DUE AUGUST 14, 2017 2: 00 PM | |
Bidders et al. | SPECIAL ADMINISTRATIVE BOARD OF THE TRANSITIONAL SCHOOL DISTRICT OF THE CITY OF ST. LOUIS _ RFP TITLE: GYMNASIUM MECHANICAL EQUIPMENT AT FROEBEL AND LEXINGTON | |
No et al. | DIVISION 1–GENERAL REQUIREMENTS | |
Stanford | BIDS DUE JULY 11, 2022 2: 00 PM, CST | |
TOFINO | PUBLIC SAFETY BUILDING TOFINO, BRITISH COLUMBIA | |
Salamah | Coad: a knowledge-based expert system for conceptual estimates and designs |