Khanifar et al., 2025 - Google Patents
A Novel AI-Based iGOR Technology for Real-Time GOR Control: A Case Study Pilot Plan for an Enhanced Oil Rim Reservoir ManagementKhanifar et al., 2025
- Document ID
- 2125040934659581751
- Author
- Khanifar A
- Panuganti S
- B Ibrahim M
- Sabri M
- B Rozali M
- Yusof A
- Motaei E
- Myo Thant M
- Publication year
- Publication venue
- International Petroleum Technology Conference
External Links
Snippet
Controlling the gas-to-oil ratio (GOR) is important in safeguarding ensured recoverable reserves and optimizing production in oil rim reservoirs or fields subjected to water- alternating-gas (WAG) injection schemes. Precise control of GOR is imperative to prevent …
- 238000005516 engineering process 0 title abstract description 37
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/164—Injecting CO2 or carbonated water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dalsmo et al. | Active feedback control of unstable wells at the brage field | |
Ahmad et al. | Rejuvenating a High GOR, Light Oil Reservoir Using AICD Completion Technology for Gas Control | |
Marino et al. | Shifting Turner's paradigm: gas wells can produce in slug flow | |
Lakhanpal et al. | Real-Time Bit Wear Prediction Using Adaptive Data Analytics | |
Leemhuis et al. | Gas coning control for smart wells | |
Khanifar et al. | A Novel AI-Based iGOR Technology for Real-Time GOR Control: A Case Study Pilot Plan for an Enhanced Oil Rim Reservoir Management | |
Kannan et al. | Understanding heel dominant liquid loading in unconventional horizontal wells | |
Alkamil et al. | Using managed pressure drilling to reduce stuck pipe problem | |
Martinez Santiago et al. | Rethinking the Flow Management Strategy: Introducing Advanced Lower Completion as a Sustainable Technology in Brownfield Asset. | |
Iversen et al. | Feasibility study of managed-pressure drilling with automatic choke control in depleted hp/ht field | |
Bruijnen et al. | How to diagnose and solve a tripping ESP caused by multiphase flow behavior in a horizontal well | |
Yu et al. | The Modelling of Advanced" Intelligent" Well–An Application | |
Panuganti et al. | Artificial Intelligence based High GOR Well Control Process Technology | |
Hegazy | Optimized Pressure Transient Acquisitions Improve Development Planning of Tight Rich Gas Fields in Sultanate of Oman | |
Goridko et al. | Analysis of self flowing through annulus of wells operated with electric submersible pumps, western and eastern siberia fields cases | |
Stein et al. | Integrated Sand and Erosion Alarming on Na Kika, Deepwater Gulf of Mexico | |
van Dijk et al. | Closing the loop for improved oil and gas production management | |
Xiao et al. | A Robust Surveillance and Optimization System for Unstable Flows in Offshore Gas Lifted Wells | |
Agrawal et al. | Surface Management of Gas Breakthrough in Thin Oil Rim Waxy Reservoir: A Case Study | |
Chanchlani et al. | Delineating and Decoding the Qualitative Interpretation of Gas Lift Instabilities in the Continuous Gas Lift Wells of Mehsana | |
Vignati et al. | From field to desk: automated field surveillance for reservoir management | |
Dolle et al. | Gas Management, Reservoir Surveillance, and Smart Wells—An Integrated Solution for the Bugan Field | |
Gorbachev et al. | Selecting and Modifying Multiphase Correlations for Gas-Lift Wells Using Machine Learning Algorithms | |
Amir et al. | Digital Twin for Oil Rim Management Using Early Warning System and Exception Based Surveillance, Offshore Malaysia | |
Gao et al. | Using Autonomous Control to Stabilize Well Performance without the Downhole Pressure Gauge |