[go: up one dir, main page]

Sundermeyer, 2021 - Google Patents

Notice of Intent Application Addendum

Sundermeyer, 2021

View PDF
Document ID
174327501838092588
Author
Sundermeyer M
Publication year

External Links

Snippet

The project's licensed PE subcontractor, Waterfront Structural Consulting, LLC, has added to the tower installation drawing notes requirements for a Construction Management Plan to include public safety and site security, operation hours, controls to limit noise and vibration …
Continue reading at newbedford-ma.s3.amazonaws.com (PDF) (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; construction methods therefor
    • E02B17/0017Means for protecting offshore constructions
    • E02B17/0021Means for protecting offshore constructions against ice-loads

Similar Documents

Publication Publication Date Title
Sundermeyer Notice of Intent Application Addendum
Joshi et al. OF CHAPTER PUBLISHED
Whoriskey Subject: Single Environmental Impact Report–EEA No. 16467
WIND Construction and Operations Plan
Randall Planning Commission Staff Report Agenda Item No. 4 November 14, 2024
Crescent Peak Renewables CRESCENT PEAK WIND PROJECT PLAN OF DEVELOPMENT SECOND DRAFT
Candela Renewables Bird and Bat Conservation Strategy Rough Hat Clark Solar Project Clark County, Nevada
Reilly Habitats Regulation Assessment (HRA)
Grande Prairie Wind Grande Prairie Wind Farm Bird and Bat Conservation Strategy
Banar Los Alamos National Laboratory Floodplain Assessment for the Technical Area 72 Outdoor Live Fire Range Safety Upgrades Project
Misterly et al. Hurricanes, Conquistadors, and Endangered Species—The Unique Challenges of Under-Bridge Pipe Replacement on Florida’s Historic Coast
District Tungsten Mountain Solar Project
Force et al. DRAFT ENVIRONMENTAL ASSESSMENT FOR THE BEALE WAPA INTERCONNECTION PROJECT
PARK Record of Revisions
Bridge–Caisson repair work
Supply et al. Draft Environmental Assessment
Point et al. Environmental Assessment of the 30MW East Point Wind Plant
Dakota Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Southern United States
Assessment et al. Charlie Creek to Garrison Transmission Line Rebuild Project
Port et al. Plan
Joshi et al. FLOATING SOLAR HANDBOOK FOR PRACTITIONERS This report was researched and prepared by the Solar Energy Research Institute of Singapore (SERIS) at the National University of Singapore (NUS), under contract from the World Bank, with inputs and editing from staff and consultants at the World Bank and the International Finance Corporation (IFC). Authors of the report were, from SERIS: Thomas Reindl, Celine Paton
Assessment Palmer’s Creek Wind Farm
Plc An assessment of the environmental-effects of offshore wind farms
Palmer’s Creek Wind Farm Palmer’s Creek Wind Farm Site Permit Application Chippewa County, Minnesota
SUBSTATION et al. VANCOUVER ISLAND TRANSMISSION REINFORCEMENT PROJECT