The project's licensed PE subcontractor, Waterfront Structural Consulting, LLC, has added to the tower installation drawing notes requirements for a Construction Management Plan to include public safety and site security, operation hours, controls to limit noise and vibration …
- 239000000463 material 0 abstract description 20
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; construction methods therefor
- E02B17/0017—Means for protecting offshore constructions
- E02B17/0021—Means for protecting offshore constructions against ice-loads
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sundermeyer | Notice of Intent Application Addendum | |
Joshi et al. | OF CHAPTER PUBLISHED | |
Whoriskey | Subject: Single Environmental Impact Report–EEA No. 16467 | |
WIND | Construction and Operations Plan | |
Randall | Planning Commission Staff Report Agenda Item No. 4 November 14, 2024 | |
Crescent Peak Renewables | CRESCENT PEAK WIND PROJECT PLAN OF DEVELOPMENT SECOND DRAFT | |
Candela Renewables | Bird and Bat Conservation Strategy Rough Hat Clark Solar Project Clark County, Nevada | |
Reilly | Habitats Regulation Assessment (HRA) | |
Grande Prairie Wind | Grande Prairie Wind Farm Bird and Bat Conservation Strategy | |
Banar | Los Alamos National Laboratory Floodplain Assessment for the Technical Area 72 Outdoor Live Fire Range Safety Upgrades Project | |
Misterly et al. | Hurricanes, Conquistadors, and Endangered Species—The Unique Challenges of Under-Bridge Pipe Replacement on Florida’s Historic Coast | |
District | Tungsten Mountain Solar Project | |
Force et al. | DRAFT ENVIRONMENTAL ASSESSMENT FOR THE BEALE WAPA INTERCONNECTION PROJECT | |
PARK | Record of Revisions | |
Bridge–Caisson | repair work | |
Supply et al. | Draft Environmental Assessment | |
Point et al. | Environmental Assessment of the 30MW East Point Wind Plant | |
Dakota | Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Southern United States | |
Assessment et al. | Charlie Creek to Garrison Transmission Line Rebuild Project | |
Port et al. | Plan | |
Joshi et al. | FLOATING SOLAR HANDBOOK FOR PRACTITIONERS This report was researched and prepared by the Solar Energy Research Institute of Singapore (SERIS) at the National University of Singapore (NUS), under contract from the World Bank, with inputs and editing from staff and consultants at the World Bank and the International Finance Corporation (IFC). Authors of the report were, from SERIS: Thomas Reindl, Celine Paton | |
Assessment | Palmer’s Creek Wind Farm | |
Plc | An assessment of the environmental-effects of offshore wind farms | |
Palmer’s Creek Wind Farm | Palmer’s Creek Wind Farm Site Permit Application Chippewa County, Minnesota | |
SUBSTATION et al. | VANCOUVER ISLAND TRANSMISSION REINFORCEMENT PROJECT |