Cho, 2000 - Google Patents
Human-assisted rapid workspace modeling for construction equipment operationsCho, 2000
- Document ID
- 16609012736318158349
- Author
- Cho Y
- Publication year
External Links
Snippet
This dissertation is concerned with developing new useful methods for rapid local area sensing and 3D modeling and simulation for better planning and control of construction equipment operations in unstructured workspaces. Construction requires real-time …
- 238000010276 construction 0 title abstract description 73
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/35—Nc in input of data, input till input file format
- G05B2219/35303—Dry run, compare simulated output with desired finished profile, alarm, inhibit
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/18—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
- G05B19/4097—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by using design data to control NC machines, e.g. CAD/CAM
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/002—Active optical surveying means
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6781683B2 (en) | Advance applications for 3-D autoscanning LIDAR system | |
| Kwon et al. | Fitting range data to primitives for rapid local 3D modeling using sparse range point clouds | |
| Cho et al. | A framework for rapid local area modeling for construction automation | |
| US20210192099A1 (en) | Method and system for generating an adaptive projected reality in construction sites | |
| US20140200863A1 (en) | Monitoring proximity of objects at construction jobsites via three-dimensional virtuality in real-time | |
| Kim et al. | Intelligent navigation strategies for an automated earthwork system | |
| Soria et al. | Augmented and virtual reality for underground facilities management | |
| Moon et al. | Virtual graphic representation of construction equipment for developing a 3D earthwork BIM | |
| Kim et al. | A model for automation of infrastructure maintenance using representational forms | |
| Yeom et al. | 3D surround local sensing system H/W for intelligent excavation robot (IES) | |
| Wang et al. | A construction progress on-site monitoring and presentation system based on the integration of augmented reality and BIM | |
| Hsieh et al. | On-site visual construction management system based on the integration of SLAM-based AR and BIM on a handheld device | |
| Cho | Human-assisted rapid workspace modeling for construction equipment operations | |
| Cho et al. | Rapid geometric modeling for unstructured construction workspaces | |
| Balaguer | Nowadays trends in robotics and automation in construction industry: Transition from hard to soft robotics | |
| Yajima et al. | Development of an excavator-avoidance system for buried pipes | |
| Gonzalez‐Jimenez et al. | An automated surveying and marking system for continuous setting‐out of tunnels | |
| Kwon | Human-assisted fitting and matching of objects to sparse point clouds for rapid workspace modeling in construction automation | |
| Kim | Spatial information acquisition and its use for infrastructure operation and maintenance | |
| Langari | Enhanced path planning method for improving safety and productivity of excavation operations | |
| Hasan | Analytical framework for field positioning and work planning for a backhoe excavator | |
| Kim et al. | Automation in transportation system construction and maintenance | |
| Al-Bahnassi | Real-time motion planning and simulation of cranes in construction | |
| Gonçalves et al. | Mobile Robotics Applied to the Remote Verification of Storage Areas | |
| Lay | Incremental object recognition using range sensors |