Li et al., 2015 - Google Patents
Study on resource scheduling method of predictive maintenance for equipment based on knowledgeLi et al., 2015
- Document ID
- 15947966944731096999
- Author
- Li X
- Wen J
- Zhou R
- Hu Y
- Publication year
- Publication venue
- 2015 10th International Conference on Intelligent Systems and Knowledge Engineering (ISKE)
External Links
Snippet
At present, heavy industrial competition makes more manufacturing pay attention to the service based on their products. Therefore, product service system has caused the extensive value of the academic circles. Service resource scheduling is the key step in the product …
- 238000004519 manufacturing process 0 abstract description 15
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0637—Strategic management or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0283—Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N99/00—Subject matter not provided for in other groups of this subclass
- G06N99/005—Learning machines, i.e. computer in which a programme is changed according to experience gained by the machine itself during a complete run
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Liu et al. | A dynamic prescriptive maintenance model considering system aging and degradation | |
| Camci | System maintenance scheduling with prognostics information using genetic algorithm | |
| Cai et al. | Joint optimization of preventive maintenance and spare parts inventory with appointment policy | |
| CN111199309A (en) | Early warning management and control system of electric power material supply chain operation | |
| Guizzi | Condition based maintenance: Simulation and optimization | |
| Álvarez et al. | A condition-based maintenance model including resource constraints on the number of inspections | |
| CN104463421B (en) | A kind of equipment dynamic optimization maintaining method of the big data modeling based on real-time status | |
| Xia et al. | Operation process rebuilding (OPR)-oriented maintenance policy for changeable system structures | |
| CN111144632A (en) | Prediction management and control model for power storage materials | |
| KR101278428B1 (en) | Real-time collaborated enterprise asset management system based on condition-based maintenance and method thereof | |
| CN111695744A (en) | Maintenance equipment demand prediction analysis system based on big data | |
| CN118965247B (en) | Power plant data management method and system based on multi-source data | |
| Li et al. | Study on resource scheduling method of predictive maintenance for equipment based on knowledge | |
| Hejazi et al. | Partial inspection problem with double sampling designs in multi-stage systems considering cost uncertainty | |
| Cao et al. | Joint decision-making model for production planning and maintenance of fully mechanized mining equipment | |
| Liao | Accelerated testing and smart maintenance: History and future | |
| CN120634531B (en) | Intelligent maintenance decision method and system based on knowledge graph | |
| CN109472449B (en) | Urban rail transit signal equipment health state evaluation method based on group decision | |
| Wang et al. | What maintenance is worth the money? a data-driven answer | |
| Feng et al. | Cost-effectiveness oriented intelligent maintenance scheduling optimization for traction power supply system of high-speed railway | |
| Xue et al. | A data-driven method to predict future bottlenecks in a remanufacturing system with multi-variant uncertainties | |
| CN120258695A (en) | A smart factory raw material inventory warning and replenishment system | |
| CN119338262A (en) | An intelligent risk control system based on big data | |
| CN116452150A (en) | Project information collaborative management system | |
| Li | Integrated workload allocation and condition-based maintenance threshold optimisation |