[go: up one dir, main page]

Singh et al., 2014 - Google Patents

Controlled blasting for long term stability of pit-walls

Singh et al., 2014

Document ID
15851007271008538503
Author
Singh P
Roy M
Paswan R
Publication year
Publication venue
International Journal of Rock Mechanics and Mining Sciences

External Links

Snippet

Controlled blasting techniques were used to control over-breaks and to aid in the stability of the remaining rock mass at Rampura Agucha open-pit mine in India. The mine is a lead zinc mine producing 5.95 mtpa of ore and has recently started its underground part, which is …
Continue reading at www.sciencedirect.com (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/263Methods for stimulating production by forming crevices or fractures using explosives
    • E21B43/2635Methods for stimulating production by forming crevices or fractures using explosives by means of nuclear energy
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Lay-outs therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Lay-outs therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/16Other methods or devices for dislodging with or without loading by fire-setting or by similar methods based on a heat effect
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C47/00Machines for obtaining or the removal of materials in open-pit mines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling

Similar Documents

Publication Publication Date Title
Singh et al. Controlled blasting for long term stability of pit-walls
Singh et al. Blast vibration effects in an underground mine caused by open-pit mining
Konicek et al. Stress changes and seismicity monitoring of hard coal longwall mining in high rockburst risk areas
Liu et al. Study on the raising technique using one blast based on the combination of long-hole presplitting and vertical crater retreat multiple-deck shots
Singh et al. Rock fragmentation control in opencast blasting
RU2593285C1 (en) Open development method of coal beds group with gross explosive loosening of overburden rocks
Mishra et al. Controlled blasting in a limestone mine using electronic detonators: A case study
Tahir et al. Design of controlled pre-split blasting in a hydroelectric construction project
Serdaliyev et al. Control of blast parameters for high-quality breaking of thin slope ore bodies
RU2208221C2 (en) Method for selective mining extraction of qualitative mineral resource in open pit
Konicek Destressing
Mishra et al. Blast-induced caving from surface over continuous miner panel at a 110m cover in an Indian mine
Mishra Unlocking possibility of blasting near residential structure using electronic detonators
Durrheim, RJ, Spottiswoode, SM, Roberts, MKC & Brink Comparative seismology of the Witwatersrand Basin and Bushveld Complex and emerging technologies to manage the risk of rockbursting
RU2604074C1 (en) Method for performing blasting operations
Behera et al. A 3D nearfield vibration model for simultaneous blasting of multiple holes in the sedimentary rock formation.
Singh Stability of underground mine workings due to surface blasting
RU2827216C1 (en) Method for contour destruction of fractured rocks with preliminary contouring
Eremenko Blast design for improved performance and reduced surface vibration–a case study
Ishchenko et al. EFFICIENCY AND SEISMIC SAFETY OF CONSTRUCTING UNDERGROUND STRUCTURES IN COMPLEX ROCK MASSES.
Dec High resolution seismic investigations for the determination of water flow directions during sulphur deposits exploitation
Balamadeswaran et al. Blast-induced ground vibration management in deep open pit mines using GIS-A case study
Konicek et al. Destress blasting on the border of safety pillars
Lindi The effectiveness of pre-splitting as a method of wall control and minimize over-break in North Mara Gold Mine
Hemed et al. Large Diameter Holes Presplitting