[go: up one dir, main page]

Powell et al., 1985 - Google Patents

The use and performance of seepage reduction measures

Powell et al., 1985

Document ID
1556732257312012340
Author
Powell R
Morgenstern N
Publication year
Publication venue
Seepage and Leakage from Dams and Impoundments

External Links

Continue reading at scholar.google.com (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealing or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Similar Documents

Publication Publication Date Title
Powell et al. The use and performance of seepage reduction measures
Baker Embankment foundation densification by compaction grouting
CN213743429U (en) Drainage structure for shield working well interface
Lowe Roller Compacted Concrete Dams—An Overview
Good et al. Weak rock in two rockfill dams
CN216198140U (en) Grout-stopping anti-seepage segment
Corrêa et al. Machadinho Dam in Brazil
ES2020400A6 (en) Erosion protection measures and installation procedure - involve double T=shaped interlocking concrete revetment blocks
SU783405A1 (en) Hydraulic power station building
Massiera et al. Construction of the OA-11 barrage on the Eastmain river
CN214883694U (en) A new type of enclosure structure for foundation pit excavation of hydraulic structures
Jones Deep Cutoffs in Pervious Alluvium, Combining Slurry Trenches and Grouting
JPS56156304A (en) Construction of revetment with composite structure consisting of steel sheet pile and concrete
Villegas Remedial Works at Troneras and Miraflores Dams in Colombia
JPS56139305A (en) Temporary coffering work for liver, etc.
JPS5585717A (en) Forming method for cut-off membrane to side of cavity of excavated reservoir
Henry et al. Prestwood Lake Dam Rehabilitation
Gould et al. Seepage control in dam rehabilitation
SU1074948A1 (en) Dam
JPS5634818A (en) H-section steel sheet pile
Jeyapalan et al. An Evaluation of the Applicability and Cost of Polyester Resin and Cementitious Grouts for the Installation of Rock Anchors at Hydro Projects
JPS5568931A (en) Construction of block piled retaining wall and block
Tatro Willow Creek Dam--To Be or Not To Be
SU724624A1 (en) Joint between bank portion and lowered section of underwater tunnel
Lowe Spillway Design and Construction: Special Design Considerations--Seepage, Uplift, and Structural Stability