Narahara et al., 2004 - Google Patents
Optimization of Riser Design and Drill Centers with a Coupled Reservoir and Facility Network Model for Deepwater AgbamiNarahara et al., 2004
- Document ID
- 15221142585786037869
- Author
- Narahara G
- Holbrook J
- Shippen M
- Erkal A
- Publication year
- Publication venue
- SPE Annual Technical Conference and Exhibition?
External Links
Snippet
The utilization of multiple wells connected at a subsea manifold provides the opportunity to reduce the number of risers and to reduce capital expense. The problem is the proper modeling of the reservoir well flow coupled with the combined flow into the facility network …
- 238000005457 optimization 0 title description 5
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/08—Screens or liners
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/006—Production of coal-bed methane
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8775141B2 (en) | System and method for performing oilfield simulation operations | |
| Litvak et al. | Prudhoe Bay E-field production optimization system based on integrated reservoir and facility simulation | |
| Liao et al. | Evaluating operation strategies via integrated asset modeling | |
| Dehane et al. | Comparison of the performance of vertical and horizontal wells in gas-condensate reservoirs | |
| Nazarov et al. | Integrated Asset Modeling in Mature Offshore Fields: Challenges and Successes | |
| Collins et al. | The Agbami Intelligent Well: Examples of Active Reservoir Management | |
| Alghareeb et al. | Proactive optimization of oil recovery in multilateral wells using real time production data | |
| Ageh et al. | Using Integrated Production Modeling (IPM) as an Optimization Tool for Field Development Planning and Management | |
| Narahara et al. | Incorporating uncertainties in well-count optimization with experimental design for the Deepwater Agbami Field | |
| Narahara et al. | Optimization of Riser Design and Drill Centers with a Coupled Reservoir and Facility Network Model for Deepwater Agbami | |
| Fairuzov et al. | Stability maps for continuous gas-lift wells: a new approach to solving an old problem | |
| Zarea et al. | An integrated performance model for multilateral wells equipped with inflow control valves | |
| Kwong et al. | Improving water efficiency in the wilmington field using streamline-based surveillance | |
| Ozdogan et al. | Recent advances and practical applications of integrated production modeling at Jack Asset in Deepwater Gulf of Mexico | |
| Naguib et al. | Guideline of artificial lift selection for mature field | |
| Saputelli et al. | Waterflood recovery optimization using intelligent wells and decision analysis | |
| Goggin et al. | Maximizing Production Capacity Using Intelligent-Well Systems in a Deepwater, West-Africa Field | |
| Genetti et al. | Applying improved recovery processes and effective reservoir management to maximize oil recovery at Salt Creek | |
| Dehane et al. | Performance of Horizontal Wells in Gas-Condensate Reservoirs, Djebel Bissa Field, Algeria | |
| Farooq et al. | Improving the Value: A Case Study of Integrated Asset Modelling of a Giant Contaminated Gas Field | |
| Okoh et al. | Application of integrated production system modelling in effective well and reservoir management of the Bonga Field | |
| Ancell et al. | Secondary gas recovery from a water-drive gas reservoir: A case study | |
| Pari et al. | Viability study of implementing smart/intelligent completion in commingled wells in an Australian offshore oil field | |
| Lee et al. | Computer design and fieldwide optimization for gas-lifted wells | |
| Duncan et al. | A Novel Approach to Gas Lift Design for 40,000 BPD Subsea Producers |