Beique et al., 2002 - Google Patents
Drilling unique wellsBeique et al., 2002
View PDF- Document ID
- 15078413552748014504
- Author
- Beique M
- Grills T
- Comeaux B
- Glass K
- Rodman D
- Publication year
- Publication venue
- Journal of Canadian Petroleum Technology
External Links
Snippet
Drilling engineers can choose from a wide variety of tools and technologies, but designing the right drilling system may mean the difference between success and failure in many complicated applications. Every major oil-bearing area in the world comes with unique …
- 238000005553 drilling 0 title abstract description 33
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/06—Deflecting the direction of boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/1015—Locating fluid leaks, intrusions or movements using tracers: using radioactivity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface or from the surface to the well, e.g. for logging while drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives used in the borehole
- E21B4/02—Fluid rotary type drives
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B25/00—Apparatus for obtaining or removing undisturbed cores, e.g. core barrels, core extractors
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Huh et al. | Enhanced Geothermal Systems (EGS) well construction technology evaluation report. | |
| US10544666B1 (en) | Formation dip geo-steering method | |
| Delwiche et al. | Successful deployment of a multi-crossing directional drilling method at Ormat’s New tungsten Mountain geothermal Field in Churchill County, Nevada | |
| Phillips | Enhanced thermal recovery and reservoir characterization | |
| Beique et al. | Drilling unique wells | |
| Jebur | Directional Drilling Tools Assessment and the Impact of Bottom Hole Assembly Configuration on the Well Trajectory and Operation Optimization | |
| Saradva et al. | Amalgamating Biosteering and Productivity Index Trend Analysis on the First Underbalanced Coiled Tubing Drilling (UBCTD) Injector Well in the Middle East to Improve Well Performance in Real-Time | |
| Alabed et al. | Longest Extended Reach Drilling Well Worldwide drilled in Middle East, Offshore Abu Dhabi, UAE | |
| Rose et al. | Sand body geometry, constrained and predicted during a horizontal drilling campaign in a Lower Cretaceous turbidite sand system, Captain Field, UKCS Block 13/22a | |
| Reynolds | Economic analysis of drilling plans and contractors by use of a drilling systems approach | |
| US10316638B1 (en) | Formation dip geo-steering method | |
| Fuh et al. | Wellbore Stability and Drilling Results From the First Horizontal Well in the Kotter Field Offshore The Netherlands | |
| Liu et al. | Cluster Wells Applied in Wetland Environment in North Azadegan | |
| Borghi et al. | Well Placement & Proactive Geosteering, The Path for Adding Reserves and Increasing Productivity. Southern Italy Carbonate Reservoir Case History | |
| Best et al. | Underground Test Facility: Shaft and Tunnel Laboratory for Horizontal Well Technology (includes associated papers 17469 and 17654) | |
| Figenschou et al. | Wellbore Damage Identification Combining High-Resolution Ultrasonic Images and Time-Based Drilling Parameters | |
| Mayibeki | Drilling optimization of a Caney shale well using offset well drilling data | |
| Kasumov et al. | Integrated BHA improves ROP by 62% in ERD operation saving 29 days rig-time, sets Russian lateral length record | |
| Siddiqui et al. | Successful Integration of Innovative Technologies Enabled Operator to Drill and Complete First Horizontal Well in Depleted Shale Inter-bedded Limestone Reservoir in Pakistan-A Milestone Achieved. | |
| Van der Harst | Erb West: an oil rim development with horizontal wells | |
| Chen et al. | Design of a Dislocation Well Pattern and Drilling of Shallow 3D Cluster Horizontal Wells for Development of Ultra Heavy Oil | |
| Meszaros | Geosteering horizontal Coalbed Methane reservoirs: A case study | |
| Marino et al. | Innovative Drilling Strategy for Horizontal Wells in Triple Splitter Wellhead Arrangement: A Case Study From Rubiales Field in Colombia | |
| Horn et al. | Multilateral horizontal well increases liquids recovery in the Gulf of Thailand | |
| Bertarelli et al. | Margarita 10: Drilling Strategy of the Fastest Well in the Bolivian Sub-Andean Region |