Nazzal et al., 2014 - Google Patents
Evaluation of winter pothole patching methods.Nazzal et al., 2014
View PDF- Document ID
- 14409029181791880969
- Author
- Nazzal M
- Kim S
- Abbas A
- Publication year
External Links
Snippet
The main objective of this study was to evaluate the performance and cost-effectiveness of the tow-behind combination infrared asphalt heater/reclaimer patching method and compare it to the throw and roll and spray injection methods. To achieve this objective a national …
- 238000011156 evaluation 0 title description 17
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/06—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
- E01C23/10—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for raising or levelling sunken paving; for filling voids under paving; for introducing material into substructure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/02—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
- E01C19/10—Apparatus or plant for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
- E01C19/1059—Controlling the operations; Devices solely for supplying or proportioning the ingredients
- E01C19/1068—Supplying or proportioning the ingredients
- E01C19/1077—Supplying or proportioning the ingredients the liquid ingredients
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
- E01C7/187—Repairing bituminous covers, e.g. regeneration of the covering material in situ, application of a new bituminous topping
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/24—Methods or arrangements for preventing slipperiness or protecting against influences of the weather
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/221—Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F9/00—Arrangement of road signs or traffic signals; Arrangements for enforcing caution
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Nazzal et al. | Evaluation of winter pothole patching methods. | |
| Asphalt Recycling & Reclaiming Association | Basic asphalt recycling manual | |
| Maher et al. | Context sensitive roadway surfacing selection guide | |
| Hajj et al. | Current and future best practices for pothole repair in illinois | |
| McHattie | Asphalt surface treatment guide | |
| Cross et al. | Guidelines for using prime and tack coats | |
| Frosch et al. | Implementation of performance-based bridge deck protective systems. | |
| Tarefder et al. | Pavement maintenance procedures with and without milling materials | |
| Senadheera et al. | Maintenance solutions for bleeding and flushed pavements surfaced with a seal coat or surface treatment | |
| Ceylan et al. | Evaluation of Otta Seal Surfacing for Low-Volume Roads in Iowa | |
| Munyagi | Evaluation of cold asphalt patching mixes | |
| Cheng et al. | Manual for Asphalt Pavement Repair and Resurfacing Preparation | |
| Fay et al. | Snow and ice control environmental best management practices | |
| Lawson | Maintenance solutions for bleeding and flushed pavements | |
| Griffith | Improved winter pothole patching | |
| Jones et al. | A Guide to Successfully Convert Severely Distressed Paved Roads to Engineered Unpaved Roads | |
| Green et al. | Best Practices for Chip Sealing Low-Volume Roads in Ohio | |
| Nazzal et al. | Winter Pothole Treatments for Local Roads | |
| Kazaryan et al. | Organization and technology of arranging access roads with asphalt-concrete pavement in the preparatory period of construction | |
| Goehl et al. | Pavement Repairs in Preparation for a Preventative Maintenance Contract | |
| Hassan | SDFlex: A framework for the assessment and construction of sustainable flexible pavements | |
| Merga | Construction and inspection guidelines for pavement preservation and cost analysis of chip seal projects | |
| Wilson et al. | Long-Term Monitoring of Pavement Maintenance Materials Test Sites | |
| Hajj et al. | State-of-the-practice in chip seal, slurry seal, micro surfacing, and thin lift asphalt overlay construction quality assurance | |
| Sturm et al. | Sturm, Harry |