Amiri, 2022 - Google Patents
Mixed Reality and BIM applied to Construction Health and SafetyAmiri, 2022
- Document ID
- 13552429440496426328
- Author
- Amiri Z
- Publication year
- Publication venue
- PQDT-Global
External Links
Snippet
Na construção, as operações no local são complexas. Os trabalhadores da construção civil realizam várias atividades distintas, cada uma frequentemente associada a uma infinidade de riscos. Esses riscos incluem muitos trabalhadores nas proximidades das áreas …
- 238000010276 construction 0 title abstract description 380
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30861—Retrieval from the Internet, e.g. browsers
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce, e.g. shopping or e-commerce
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F19/00—Digital computing or data processing equipment or methods, specially adapted for specific applications
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G1/00—Traffic control systems for road vehicles
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Edirisinghe | Digital skin of the construction site: Smart sensor technologies towards the future smart construction site | |
| Zhang et al. | Digital twins for construction sites: Concepts, LoD definition, and applications | |
| Rane et al. | Artificial Intelligence (Ai) and Internet of Things (Iot)–based sensors for monitoring and controlling in architecture, engineering, and construction: Applications, challenges, and opportunities | |
| Liu et al. | Digital twin-based safety risk coupling of prefabricated building hoisting | |
| Hossain et al. | Developing an automated safety checking system using BIM: a case study in the Bangladeshi construction industry | |
| CN109978409B (en) | A multi-engineering enterprise-level smart construction site blockchain management method | |
| Teizer | Right-time vs real-time pro-active construction safety and health system architecture | |
| Yap et al. | Advanced technologies for enhanced construction safety management: investigating Malaysian perspectives | |
| Parn et al. | Engineering-out hazards: digitising the management working safety in confined spaces | |
| US12347296B2 (en) | Emulated facility safety with correlated sound frequency modeling | |
| Martínez-Rojas et al. | An internet of things and fuzzy markup language based approach to prevent the risk of falling object accidents in the execution phase of construction projects | |
| Reja et al. | Digital twins for construction project management (DT-CPM): applications and future research directions | |
| Cao et al. | A digital twin (DT) framework at design and construction phases | |
| Pereira et al. | An evaluation of the technologies used for the real-time monitoring of the risk of falling from height in construction—Systematic review | |
| Sabeti et al. | Mixed-method usability investigation of ARROWS: augmented reality for roadway work zone safety | |
| Choi et al. | Prediction and prevention of crowd-crush accidents using crowd-density simulation based on unity engine | |
| CN120448452A (en) | An AI-based six-dimensional gridded holographic display system and method for household conditions | |
| Amiri | Mixed Reality and BIM applied to Construction Health and Safety | |
| Takva et al. | Digitalization of building site management in the construction industry | |
| Liu et al. | Development of a smart work site for early warning of heat stress | |
| EP3678071A1 (en) | System and method for improving safety in workspace | |
| Sun | Smart prisons | |
| Chellatore et al. | Mobile application for identifying anomalous behavior and conducting time series analysis using heterogeneous data | |
| Saif et al. | Inductive Theorization of Construction Digital Twins: Deriving A Taxonomy of Applications and Enabling Technologies | |
| Okonta et al. | Future directions and research gaps in city information modelling (CIM) |