[go: up one dir, main page]

Amiri, 2022 - Google Patents

Mixed Reality and BIM applied to Construction Health and Safety

Amiri, 2022

Document ID
13552429440496426328
Author
Amiri Z
Publication year
Publication venue
PQDT-Global

External Links

Snippet

Na construção, as operações no local são complexas. Os trabalhadores da construção civil realizam várias atividades distintas, cada uma frequentemente associada a uma infinidade de riscos. Esses riscos incluem muitos trabalhadores nas proximidades das áreas …
Continue reading at search.proquest.com (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/30Information retrieval; Database structures therefor; File system structures therefor
    • G06F17/30861Retrieval from the Internet, e.g. browsers
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/50Computer-aided design
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce, e.g. shopping or e-commerce
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F19/00Digital computing or data processing equipment or methods, specially adapted for specific applications
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles

Similar Documents

Publication Publication Date Title
Edirisinghe Digital skin of the construction site: Smart sensor technologies towards the future smart construction site
Zhang et al. Digital twins for construction sites: Concepts, LoD definition, and applications
Rane et al. Artificial Intelligence (Ai) and Internet of Things (Iot)–based sensors for monitoring and controlling in architecture, engineering, and construction: Applications, challenges, and opportunities
Liu et al. Digital twin-based safety risk coupling of prefabricated building hoisting
Hossain et al. Developing an automated safety checking system using BIM: a case study in the Bangladeshi construction industry
CN109978409B (en) A multi-engineering enterprise-level smart construction site blockchain management method
Teizer Right-time vs real-time pro-active construction safety and health system architecture
Yap et al. Advanced technologies for enhanced construction safety management: investigating Malaysian perspectives
Parn et al. Engineering-out hazards: digitising the management working safety in confined spaces
US12347296B2 (en) Emulated facility safety with correlated sound frequency modeling
Martínez-Rojas et al. An internet of things and fuzzy markup language based approach to prevent the risk of falling object accidents in the execution phase of construction projects
Reja et al. Digital twins for construction project management (DT-CPM): applications and future research directions
Cao et al. A digital twin (DT) framework at design and construction phases
Pereira et al. An evaluation of the technologies used for the real-time monitoring of the risk of falling from height in construction—Systematic review
Sabeti et al. Mixed-method usability investigation of ARROWS: augmented reality for roadway work zone safety
Choi et al. Prediction and prevention of crowd-crush accidents using crowd-density simulation based on unity engine
CN120448452A (en) An AI-based six-dimensional gridded holographic display system and method for household conditions
Amiri Mixed Reality and BIM applied to Construction Health and Safety
Takva et al. Digitalization of building site management in the construction industry
Liu et al. Development of a smart work site for early warning of heat stress
EP3678071A1 (en) System and method for improving safety in workspace
Sun Smart prisons
Chellatore et al. Mobile application for identifying anomalous behavior and conducting time series analysis using heterogeneous data
Saif et al. Inductive Theorization of Construction Digital Twins: Deriving A Taxonomy of Applications and Enabling Technologies
Okonta et al. Future directions and research gaps in city information modelling (CIM)