Andrade et al., 2011 - Google Patents
Biobjective optimization model for maintenance and renewal decisions related to rail track geometryAndrade et al., 2011
View PDF- Document ID
- 1339596677489755326
- Author
- Andrade A
- Teixeira P
- Publication year
- Publication venue
- Transportation research record
External Links
Snippet
This study developed a biobjective optimization model for planning maintenance and renewal actions related to track geometry in a railway network. The problem was modeled as a biobjective integer optimization problem from the perspective of the infrastructure …
- 238000005457 optimization 0 title abstract description 17
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0637—Strategic management or analysis
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central traffic control systems; Track-side control or specific communication systems
- B61L27/0011—Regulation, e.g. scheduling, time tables
- B61L27/0027—Track-side optimisation of vehicle or vehicle train operation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Andrade et al. | Biobjective optimization model for maintenance and renewal decisions related to rail track geometry | |
Caetano et al. | Optimisation model to schedule railway track renewal operations: a life-cycle cost approach | |
Soleimanmeigouni et al. | Track geometry degradation and maintenance modelling: A review | |
Andrade et al. | A Bayesian model to assess rail track geometry degradation through its life-cycle | |
Bressi et al. | Optimization of maintenance strategies for railway track-bed considering probabilistic degradation models and different reliability levels | |
Caetano et al. | Availability approach to optimizing railway track renewal operations | |
Wen et al. | Optimization of preventive condition-based tamping for railway tracks | |
Caetano et al. | Predictive maintenance model for ballast tamping | |
de Almeida Costa et al. | A data‐driven maintenance policy for railway wheelset based on survival analysis and Markov decision process | |
Rocha et al. | Probabilistic assessment of the train running safety on a short-span high-speed railway bridge | |
CN114072825A (en) | Monitor, predict and maintain the condition of railway elements using digital twins | |
Mishra et al. | Particle filter-based prognostic approach for railway track geometry | |
Lasisi et al. | Machine learning ensembles and rail defects prediction: Multilayer stacking methodology | |
Falamarzi et al. | Development of a tram track degradation prediction model based on the acceleration data | |
Falamarzi et al. | Prediction of tram track gauge deviation using artificial neural network and support vector regression | |
Moridpour et al. | Application of artificial neural networks in predicting the degradation of tram tracks using maintenance data | |
Movaghar et al. | Intelligent index for railway track quality evaluation based on Bayesian approaches | |
Andrade et al. | Exploring different alert limit strategies in the maintenance of railway track geometry | |
Caetano et al. | Strategic model to optimize railway-track renewal operations at a network level | |
Falamarzi et al. | Rail degradation prediction models for tram system: Melbourne case study | |
Sedghi et al. | Data‐driven maintenance planning and scheduling based on predicted railway track condition | |
Kasraei et al. | Effective time interval for railway track geometry inspection | |
Westgeest et al. | Predicting rail geometry deterioration by regression models | |
Rahimikelarijani et al. | Imperfect condition-based maintenance strategy for a deteriorating rail track system with multiple competitive failure modes | |
Santos et al. | Heuristic analysis of the effective range of a track tamping machine |