Raja et al., 2011 - Google Patents
Workflows and Methods to Optimize Well Construction through a Collaborative EnvironmentRaja et al., 2011
- Document ID
- 12938833639009025964
- Author
- Raja H
- Carpenter G
- Oliver D
- Publication year
- Publication venue
- SPE Digital Energy Conference and Exhibition
External Links
Snippet
Since the advent of improved telecommunications in the early 1990s, operators and service providers have sought to reduce non-productive time (NPT) through remote operation capabilities delivered using real-time centers (RTC) or with a combination of remote …
- 238000010276 construction 0 title description 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS
- G01V99/00—Subject matter not provided for in other groups of this subclass
- G01V99/005—Geomodels or geomodelling, not related to particular measurements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/28—Processing seismic data, e.g. analysis, for interpretation, for correction
- G01V1/34—Displaying seismic recordings or visualisation of seismic data or attributes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/62—Physical property of subsurface
- G01V2210/624—Reservoir parameters
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/0035—Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Chong et al. | A completions guide book to shale-play development: a review of successful approaches towards shale-play stimulation in the last two decades | |
| US7890264B2 (en) | Waterflooding analysis in a subterranean formation | |
| CA2793811C (en) | System and method for performing oilfield drilling operations using visualization techniques | |
| US8567526B2 (en) | Wellbore steering based on rock stress direction | |
| US8260595B2 (en) | Intelligent completion design for a reservoir | |
| Chong et al. | A completions roadmap to shale-play development: a review of successful approaches toward shale-play stimulation in the last two decades | |
| US20090192712A9 (en) | System and method for waterflood performance monitoring | |
| CA2680958C (en) | Reservoir management linking | |
| Mijnarends et al. | Advanced data-driven performance analysis for mature waterfloods | |
| Koryabkin et al. | Application of the combined real-time petrophysical and geosteering model to increase drilling efficiency | |
| Saputelli et al. | Waterflood recovery optimization using intelligent wells and decision analysis | |
| Raja et al. | Workflows and Methods to Optimize Well Construction through a Collaborative Environment | |
| Bawazir et al. | Real-Time Production Logs Surveillance: Automated Workflow Technology Allows Synthetic Sensing of Oilfield Downhole Production | |
| Fimadoni et al. | Accurate Horizontal Well Placement in Waterflooded Field's Drilling Project: A Case Study from Central Sumatra Basin, Indonesia | |
| Afanasyev et al. | Analysis of Multiple Fractured Horizontal Wells Application at Priobskoye field | |
| Rosland et al. | Collaborative Well Planning and Optimization of Well Placement: A Case Study From Mangala Field Development, Rajasthan India | |
| Yu et al. | A new integrated drilling and fracturing solution for tight oil exploration: a case study from central China | |
| Malinverno et al. | Real-time 3D earth model updating while drilling a horizontal well | |
| Tan et al. | Unveiling FDP Breakthroughs and Innovations: Transforming Brownfield Rejuvenation Strategies for Infill Drilling Delivery Through Agile Reservoir Modeling and Integrated Technical Assessment | |
| Akram et al. | Production Profiling of a Long Dead Well–A Prime Case Study of Operational and Technical Excellence Using Simultaneous Lifting and Logging Services | |
| Guehria et al. | An Innovative Approach to Reverse Production Decline in Brown Fields | |
| Burget et al. | Optimizing Completion Design and Well Spacing in the Powder River Basin Niobrara Oil Play | |
| Abdelkerim et al. | Agile Smart Completion Application for Effective Water Production Control in Heterogeneous Carbonate Reservoir in Abu Dhabi Offshore Reservoir | |
| Hernandez et al. | Lessons Learnt from an Integrated Approach for Modeling a Tight Naturally Fractured Reservoir: A Case Study from Kuwait | |
| Kueh et al. | Small Field Rejuvenation: Challenges, Lessons Learnt & Redevelopment Concept |