[go: up one dir, main page]

Sain et al., 1996 - Google Patents

Earthwork

Sain et al., 1996

View PDF
Document ID
12768054660019614053
Author
Sain C
Quinby G
Publication year
Publication venue
Standard Handbook for Civil Engineers, 4th edition. New York: McGraw-Hill

External Links

Snippet

Earthwork involves movement of a portion of the earth's surface from one location to another and, in its new position, creation of a desired shape and physical condition. Occasionally, the material moved is disposed of as spoil. Because of the wide variety of soils encountered …
Continue reading at 103.254.244.3 (PDF) (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/08Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain, e.g. bucket-type chains
    • E02F3/10Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain, e.g. bucket-type chains with tools that only loosen the material, i.e. with cutter-type chains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/46Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes; Drives or control devices therefor
    • E02F3/50Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes; Drives or control devices therefor with buckets or other digging elements moved along a rigid guideway
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/06Floating substructures as supports
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/28Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
    • E02F5/285Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways with drag buckets or scraper plates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/22Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling
    • E02F5/223Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling for back-filling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F7/00Equipment for conveying or separating excavated material
    • E02F7/06Delivery chutes or screening plants or mixing plants mounted on dredgers or excavators
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealing or joints for engineering works in general
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Lay-outs therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C47/00Machines for obtaining or the removal of materials in open-pit mines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

Similar Documents

Publication Publication Date Title
Sahu Application of ripper-dozer combination in surface mines: its applicability and performance study
Sain et al. Earthwork
Gillette Earthwork and its Cost: a handbook of earth excavation
Breitenbach Rockfill placement and compaction guidelines
Dembicki et al. Polish experience in soil improvement using explosion techniques
Blanchet et al. Pipeline trenching in permafrost: a review
Clark et al. The Portavadie dry dock, west Scotland: a case history of the geotechnical aspects of its construction
Mellor Burial of Undersea Pipes and Cables State-of-the Art Assessment
Warren Earthworks
Gogolewska Surface and underground mining technology
Bustillo Revuelta Extraction Methods
Midgley Construction plant performance and operating costs
Henry et al. THE CONSTRUCTION OF THE NEW HONG KONG AIRPORT.
Weatherbe Dredging for gold in California
Salter Earthworks
Lloyd et al. Rockfill dams: Cherry Valley central core dam
Tyson The Lewis Smith Rockfill Dam
MANUAL Construction Control for Earth and Rock-Fill Dams
Twort et al. Earthworks and pipelines
Lloyd et al. Rockfill Dams: Cherry Valley Central Core Dam
Khattar Longest breakwater in India
BRYAN THE LOCATION, DESIGN AND CONSTRUCTION OF THE TEMERLOH-MARAN ROAD, PAHANG, FEDERATED MALAY STATES.
Foster et al. THE SHA TIN TO TAI PO COASTAL ROAD, NEW TERRITORIES, HONG KONG: CONSTRUCTION.
Connor Labor Costs of Construction: A Reference Book for Engineers, Architects, Contractors and Builders
BARNES THE DUGALD CLERK LECTURE, 1940. METHODS OF EXCAVATION WORK AT HOME AND ABROAD.