Sain et al., 1996 - Google Patents
EarthworkSain et al., 1996
View PDF- Document ID
- 12768054660019614053
- Author
- Sain C
- Quinby G
- Publication year
- Publication venue
- Standard Handbook for Civil Engineers, 4th edition. New York: McGraw-Hill
External Links
Snippet
Earthwork involves movement of a portion of the earth's surface from one location to another and, in its new position, creation of a desired shape and physical condition. Occasionally, the material moved is disposed of as spoil. Because of the wide variety of soils encountered …
- 239000000463 material 0 abstract description 90
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/08—Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain, e.g. bucket-type chains
- E02F3/10—Dredgers; Soil-shifting machines mechanically-driven with digging elements on an endless chain, e.g. bucket-type chains with tools that only loosen the material, i.e. with cutter-type chains
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/36—Component parts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/18—Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/46—Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes; Drives or control devices therefor
- E02F3/50—Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes; Drives or control devices therefor with buckets or other digging elements moved along a rigid guideway
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/06—Floating substructures as supports
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/28—Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
- E02F5/285—Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways with drag buckets or scraper plates
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/22—Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling
- E02F5/223—Dredgers or soil-shifting machines for special purposes for making embankments; for back-filling for back-filling
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F7/00—Equipment for conveying or separating excavated material
- E02F7/06—Delivery chutes or screening plants or mixing plants mounted on dredgers or excavators
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealing or joints for engineering works in general
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/26—Methods of surface mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C47/00—Machines for obtaining or the removal of materials in open-pit mines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sahu | Application of ripper-dozer combination in surface mines: its applicability and performance study | |
Sain et al. | Earthwork | |
Gillette | Earthwork and its Cost: a handbook of earth excavation | |
Breitenbach | Rockfill placement and compaction guidelines | |
Dembicki et al. | Polish experience in soil improvement using explosion techniques | |
Blanchet et al. | Pipeline trenching in permafrost: a review | |
Clark et al. | The Portavadie dry dock, west Scotland: a case history of the geotechnical aspects of its construction | |
Mellor | Burial of Undersea Pipes and Cables State-of-the Art Assessment | |
Warren | Earthworks | |
Gogolewska | Surface and underground mining technology | |
Bustillo Revuelta | Extraction Methods | |
Midgley | Construction plant performance and operating costs | |
Henry et al. | THE CONSTRUCTION OF THE NEW HONG KONG AIRPORT. | |
Weatherbe | Dredging for gold in California | |
Salter | Earthworks | |
Lloyd et al. | Rockfill dams: Cherry Valley central core dam | |
Tyson | The Lewis Smith Rockfill Dam | |
MANUAL | Construction Control for Earth and Rock-Fill Dams | |
Twort et al. | Earthworks and pipelines | |
Lloyd et al. | Rockfill Dams: Cherry Valley Central Core Dam | |
Khattar | Longest breakwater in India | |
BRYAN | THE LOCATION, DESIGN AND CONSTRUCTION OF THE TEMERLOH-MARAN ROAD, PAHANG, FEDERATED MALAY STATES. | |
Foster et al. | THE SHA TIN TO TAI PO COASTAL ROAD, NEW TERRITORIES, HONG KONG: CONSTRUCTION. | |
Connor | Labor Costs of Construction: A Reference Book for Engineers, Architects, Contractors and Builders | |
BARNES | THE DUGALD CLERK LECTURE, 1940. METHODS OF EXCAVATION WORK AT HOME AND ABROAD. |