Stolte, 2015 - Google Patents
Drilling rig design for a unique oil field application–field redevelopment in Ruehlermoor “peat mining field”Stolte, 2015
View PDF- Document ID
- 11876322551319077571
- Author
- Stolte S
- Publication year
External Links
Snippet
A major part of the German oil and gas consumption is covered by imports, thus it is important that Germany strengthen the domestic production. The oil field" Ruehlermoor" with more than 500 existing wells is Germany's largest onshore oil field and is operated by a joint …
- 238000005553 drilling 0 title abstract description 202
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/04—Gravelling of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Derricks; Masts; Other supports
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Eggemeyer et al. | SubSea MudLift Drilling: Design and Implementation of a Dual Gradient Drilling System | |
CN111750172A (en) | Pipe jacking construction process | |
Chen et al. | TBM design and construction examples | |
Duthie et al. | Modular hydraulic workover unit enhances operational efficiency and cost savings for ESP replacement's | |
Demong et al. | Advancements in Efficiency in Horn River Shale Stimulation | |
Stolte | Drilling rig design for a unique oil field application–field redevelopment in Ruehlermoor “peat mining field” | |
Teig et al. | Grane Drilling | |
Hegaz | Design of basic technological measures for the efficient development of oil deposits by thermal methods | |
Carpenter | Optimization of Ancillary System Mobilization for Drilling Rigs with Advanced Transport Capabilities | |
Huttrer | Technical and economic evaluation of selected compact drill rigs for drilling 10,000 foot geothermal production wells | |
Ridl et al. | Oil and gas extraction worker fatalities 2014; NIOSH fatalities in oil and gas extraction (FOG) database | |
Hughes | Collieries of Wales: Engineering and Architecture | |
Andreassen et al. | Field Launch of a Safer, More-Efficient Coiled-Tubing Unit in North Sea for Valhall Stimulations | |
RU2786703C1 (en) | Method for carrying out downhole operations and research using an autonomous mobile complex | |
Burdin et al. | Successful Offshore Coiled Tubing Well Intervention in Mega-Reach Wells in the Russian Caspian: A 4-Well Case Study | |
Peytchev et al. | Rapid Rig Design–A Cost Effective Innovative Design For Field Development | |
Miranda et al. | Coiled Tubing Equipment Evolution to Overcome the New Well Intervention Challenges on the North Slope of Alaska | |
Rodrigues | HSE Procedure for Deep Drilling & Workover Operations: Proposal for a drilling company operating in the middle east | |
Fletcher | Arctic Drilling Operations Planning and Execution: Feedback from Kharyaga Field, Russia | |
Young et al. | Fit for Purpose Reeled Systems: A Case History | |
Muriga | Energy Performance Analysis of Geothermal Drilling Rigs in Menengai, Nakuru | |
Simatupang et al. | First Application in Indonesia of Production Data Acquisition Using Logging Down Tractor Conveyance: Field Application in Anoa Field, Natuna | |
Kadaster et al. | Methane Hydrate Production from Alaskan Permafrost | |
Porteous et al. | Start-up of a New Generation Mechanised Drilling Package for Platform Drilling Operations: The Brent Charlie–a Step Change in Performance | |
Adil et al. | Unique Coiled-Tubing Unit Design Improves Surface Efficiency for Performing Well Interventions in Algeria |