Case Studies Using Quality Control for Performance and Pay for Performance Specifications: Field ObservationsAl-Qadi et al., 2020
View PDF- Document ID
- 11842766360531516004
- Author
- Al-Qadi I
- Rivera-Perez J
- Sayeh W
- García Mainieri J
- Meidani H
- Huang J
- Ozer H
- Hand A
- Publication year
- Publication venue
- FHWA-ICT-20-006
External Links
Snippet
Quality assurance programs for hot-mix asphalt (HMA) have evolved from method to quality assurance specifications that distribute responsibilities and risks between contractors and owners. The Illinois Department of Transportation developed two acceptance specifications …
- 238000003908 quality control method 0 title abstract description 83
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/02—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
- E01C19/10—Apparatus or plant for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
- E01C19/1059—Controlling the operations; Devices solely for supplying or proportioning the ingredients
- E01C19/1068—Supplying or proportioning the ingredients
- E01C19/1077—Supplying or proportioning the ingredients the liquid ingredients
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/18—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
- E01C7/26—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre
- E01C7/265—Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre with rubber or synthetic resin, e.g. with rubber aggregate, with synthetic resin binder
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/003—Foundations for pavings characterised by material or composition used, e.g. waste or recycled material
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/48—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/06—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Copeland | Reclaimed asphalt pavement in asphalt mixtures: State of the practice | |
| Sivilevičius et al. | Quality attributes and complex assessment methodology of the asphalt mixing plant | |
| Brown et al. | NCAT test track design, construction, and performance | |
| Hughes | Variability in highway pavement construction | |
| Montoya et al. | Increasing asphalt pavement density through mixture design: A field project | |
| Al-Qadi et al. | Case Studies Using Quality Control for Performance and Pay for Performance Specifications: Field Observations | |
| Katicha et al. | Improving Mixture Durability Through Design Gyrations, Air Voids, and Binder Content | |
| Jones et al. | Warm-Mix Asphalt Study: Test Track Construction and FirstLevel Analysis of Phase 3b HVS and Laboratory Testing (Rubberized Asphalt, Mix Design# 2) | |
| Al-Qadi et al. | Data trends and variability in quality control for performance and pay for performance specifications: Statistical analysis | |
| West et al. | In-service performance of airport flexible pavements constructed following state specifications for highway pavement materials | |
| Al-Qadi et al. | A Life-Cycle Methodology for Energy Use by In-Place Pavement Recycling Techniques | |
| Ingram et al. | Superior materials, advanced test methods, and specifications in Europe | |
| Jones et al. | First-Level Analysis of Phase 1 Heavy Vehicle Simulator and Laboratory Testing on Four RHMA-G Mixes to Investigate Nominal Maximum Aggregate Size, Layer Thickness, and Performance with Aggregate Replacement from Reclaimed Asphalt Pavement | |
| Noferini | Performances and durability of asphalt mixtures made with reclaimed asphalt Pavement | |
| Al-Qadi et al. | Optimized Hot-Mix Asphalt Lift Configuration for Performance | |
| Hajj et al. | Assessment of the Impact of Unacceptable Hot-Mix Asphalt Test Parameters | |
| Al-Qadi et al. | Illinois’ experience using quality control for performance and pay for performance to determine pay for hot-mix asphalt | |
| Powell | Predicting field performance on the NCAT pavement test track | |
| Graham | Pavement Preservation Best Practices Technical Briefs | |
| Lee et al. | Impact of Incentive/Disincentive Specifications on Long-Term Asphalt Pavement Performance | |
| Ksaibati et al. | Evaluating the impact of QC/QA programs on asphalt mixture variability | |
| Lundy | Acceptance procedures for dense-graded mixes | |
| Gao et al. | Determining Percentage of Recycled Asphalt Pavement in Asphalt Mixtures | |
| West et al. | Improved performance of reclaimed asphalt pavement mixes | |
| Asphalt et al. | ASPHALT TECHNOLOGY |