Nermoen et al., 2022 - Google Patents

Ground water maintenance and leakage control during construction of unlined rock caverns for pressurized gas storage, Mongstad

Nermoen et al., 2022

Document ID
11177300362275518511
Author
Nermoen B
Blindheim O
Publication year
Publication venue
Storage of Gases in Rock Caverns

External Links

Snippet

Ground water is used to balance the gas pressure in 3 unlined rock caverns in gneissic rocks, for LPG gas storage. Before excavation a water curtain was established above and between the caverns to maintain the groundwater level during construction and operation …
Continue reading at api.taylorfrancis.com (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/11Perforators; Permeators
    • E21B43/119Details, e.g. for locating perforating place or direction
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Lay-outs therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES

Similar Documents

Publication Publication Date Title
CN108678777B (en) Support method for tunnel fault fracture zone section
CN103629980B (en) Near existing line steep massif Loose Control Blasting construction method
AU2020257049B2 (en) Construction method for forming water-proof grouting curtain in water-rich porous rock stratum by blasting
CN103291325A (en) Method for preventing and controlling water burst of coal mining base board rock stratum on pressure bearing water body
CN103835648A (en) Raise-boring technology for improving rock stratum performance through ground grouting
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN105401946A (en) Reverse blasting excavation method of shaft and pilot shaft
CN103510572A (en) Construction method of water getting vertical shaft under complex geological condition
Nermoen et al. Ground water maintenance and leakage control during construction of unlined rock caverns for pressurized gas storage, Mongstad
CN112502719A (en) Method for TBM construction of lens body altered through high-pressure water-rich
CN113863984B (en) Method for preventing and controlling air leakage in exploitation of extremely-close coal seam group
Palmstrøm et al. New milestones in subsea blasting at water depth of 55m
CN117052437A (en) Tunnel construction method for crossing high-pressure water-rich fracture zone by using curtain grouting and grout stopping wall
Kaskiw et al. Backfilling at IMC Canada K-2 potash mine
CN111119983B (en) Gas spraying and burning treatment method in tunnel excavation process
Schmall et al. Ground freezing a proven technology in mine shaft sinking
CN108757009B (en) Method for eliminating coal and gas outburst by utilizing ground drilling
Cavuoto et al. Urban tunnelling under archaeological findings in Naples (Italy) with ground freezing and grouting techniques
Chen et al. Application of new concept waterproofing in Xiang’an undersea tunnel, China
Santarelli et al. Innovative methods for excavation and ground improvement in Oslo
CN118997841B (en) Backfilling and plugging of abandoned vertical shafts in thick loose layers and reconstruction of impermeable layers
RU21216U1 (en) DEVICE FOR INSULATION OF EMERGENCY SITE IN UNDERGROUND DEVELOPMENT
Lamand et al. Solutions for the construction of the Vert-de-Maisons station (Paris, France): Artificial Ground Freezing and compensation grouting in an urban context
Niklasson et al. The Sture LPG Storage Project
Rougier et al. Managing ice walls and other operational challenges while optimising Victor Mine late stage opportunities