Nermoen et al., 2022 - Google Patents
Ground water maintenance and leakage control during construction of unlined rock caverns for pressurized gas storage, MongstadNermoen et al., 2022
- Document ID
- 11177300362275518511
- Author
- Nermoen B
- Blindheim O
- Publication year
- Publication venue
- Storage of Gases in Rock Caverns
External Links
Snippet
Ground water is used to balance the gas pressure in 3 unlined rock caverns in gneissic rocks, for LPG gas storage. Before excavation a water curtain was established above and between the caverns to maintain the groundwater level during construction and operation …
- 239000003673 groundwater 0 title abstract description 37
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
- E21B43/119—Details, e.g. for locating perforating place or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/103—Dams, e.g. for ventilation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108678777B (en) | Support method for tunnel fault fracture zone section | |
CN103629980B (en) | Near existing line steep massif Loose Control Blasting construction method | |
AU2020257049B2 (en) | Construction method for forming water-proof grouting curtain in water-rich porous rock stratum by blasting | |
CN103291325A (en) | Method for preventing and controlling water burst of coal mining base board rock stratum on pressure bearing water body | |
CN103835648A (en) | Raise-boring technology for improving rock stratum performance through ground grouting | |
CN110130936B (en) | Construction method for sudden encountering untreated karst cave or crack in shield tunneling process | |
CN105401946A (en) | Reverse blasting excavation method of shaft and pilot shaft | |
CN103510572A (en) | Construction method of water getting vertical shaft under complex geological condition | |
Nermoen et al. | Ground water maintenance and leakage control during construction of unlined rock caverns for pressurized gas storage, Mongstad | |
CN112502719A (en) | Method for TBM construction of lens body altered through high-pressure water-rich | |
CN113863984B (en) | Method for preventing and controlling air leakage in exploitation of extremely-close coal seam group | |
Palmstrøm et al. | New milestones in subsea blasting at water depth of 55m | |
CN117052437A (en) | Tunnel construction method for crossing high-pressure water-rich fracture zone by using curtain grouting and grout stopping wall | |
Kaskiw et al. | Backfilling at IMC Canada K-2 potash mine | |
CN111119983B (en) | Gas spraying and burning treatment method in tunnel excavation process | |
Schmall et al. | Ground freezing a proven technology in mine shaft sinking | |
CN108757009B (en) | Method for eliminating coal and gas outburst by utilizing ground drilling | |
Cavuoto et al. | Urban tunnelling under archaeological findings in Naples (Italy) with ground freezing and grouting techniques | |
Chen et al. | Application of new concept waterproofing in Xiang’an undersea tunnel, China | |
Santarelli et al. | Innovative methods for excavation and ground improvement in Oslo | |
CN118997841B (en) | Backfilling and plugging of abandoned vertical shafts in thick loose layers and reconstruction of impermeable layers | |
RU21216U1 (en) | DEVICE FOR INSULATION OF EMERGENCY SITE IN UNDERGROUND DEVELOPMENT | |
Lamand et al. | Solutions for the construction of the Vert-de-Maisons station (Paris, France): Artificial Ground Freezing and compensation grouting in an urban context | |
Niklasson et al. | The Sture LPG Storage Project | |
Rougier et al. | Managing ice walls and other operational challenges while optimising Victor Mine late stage opportunities |