No. 7 Line, Site L: Overcoming the Challenges of Underground Construction in the Built EnvironmentSokol et al.
View PDF- Document ID
- 1112257996006550841
- Author
- Sokol N
- Ghasemi A
- Hurt J
- Shafei B
External Links
Snippet
Site L will be a ventilation facility for the No. 7 Line Extension in midtown Manhattan. Unique challenges associated with the project include a surface excavation and two rock shafts adjacent to a tall building and two 9.2-m (30-ft) span adits excavated through existing …
- 238000010276 construction 0 title abstract description 28
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/103—Dams, e.g. for ventilation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Lay-outs therefor
- E21C41/26—Methods of surface mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1837506B (en) | Construction method for excavating box-shape structure over an operating tunnel | |
US9151047B2 (en) | Undercut excavation method with continuous concrete floors | |
Haruyama et al. | Construction of urban expressway tunnel with special large cross section by NATM–Metropolitan Inter-City Highway (Ken-O-Do) Ome Tunnel– | |
Sokol et al. | No. 7 Line, Site L: Overcoming the Challenges of Underground Construction in the Built Environment | |
Goel et al. | Tunnels in the Himalaya | |
Kramer et al. | The Sequential Demolition Method–Underground Replacement of a 100 Year Old Tunnel | |
Boon et al. | Protection of buildings and structures within the influence of tunnelling works | |
Konstantis et al. | Box jacking/pushing method for tunnel construction in rock: Doha Metro, Gold Line Project | |
Çimentepe | Evaluation of structural analysis methods used for the design of TBM segmental linings | |
Herranz et al. | SEM crossover cavern in Downtown LA | |
Peila et al. | Construction methods | |
Sandbak et al. | Ground support strategies for weak ground masses at the Turquoise Ridge Joint Venture, Nevada | |
Lim et al. | Construction of the linkway underneath the existing Outram Park Station | |
Ghani et al. | Design and Construction of Ho Chi Minh City Metro Line 1 Underground Section (Contract Package 1b) | |
Underwood | Machine tunneling on Missouri River dams | |
Kramer et al. | Underground replacement of a 100 year old tunnel using the sequential demolition method | |
Miura | Design and Construction of Mountain Tunnels | |
Mutton et al. | DESIGN AND CONSTRUCTION OF WATER HOLDING BULKHEADS AT XSTRATACOAL‟ S OAKY NO 1 MINE | |
Raju et al. | Cross Passage construction in soft soil by RCC box pushing in MRTS | |
Khali | Construction of Railway Tunnels in Highly Adverse Geological Conditions in Himalayas by Using NATM–A Case Study | |
Fang | by Crossing Broken Fault and Water-Rich Geological Mine Method by Using | |
Goller et al. | LINDE FUSRAP SITE REMEDIATION, UTILITY TUNNEL REPLACEMENT, AND INDUSTRY OPERATIONS: A CASE STUDY OF CHALLENGES MET IN WESTERN NEW YORK | |
Keating et al. | Underground Cavern Blasting–Post TBM Traverse | |
Kellaway et al. | The use of geotechnical instrumentation to monitor ground displacements during excavation of the ingula power caverns, for model calibration and design verification purposes | |
Tirolo Jr et al. | Construction of a TBM “Launch Box” in a Complex Urban Environment |