Mutton et al., 2011 - Google Patents

Design of water holding bulkheads for Coal Mines

Mutton et al., 2011

View PDF
Document ID
11095173889012960486
Author
Mutton V
Remennikov A
Publication year
Publication venue
Proceedings of 11th Coal Operators Conference

External Links

Snippet

Water control has been and remains a fundamentally important aspect of underground coal mine design and operation worldwide. Mining in the vicinity of large bodies of water, below a worked out coal seam or under confined aquifer or abandoned water logged workings is …
Continue reading at www.academia.edu (PDF) (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Lay-outs therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Similar Documents

Publication Publication Date Title
Sousa et al. Lessons from accidents during tunnel construction
Wagner Deep mining: a rock engineering challenge
Huang et al. Soil-water inrush induced shield tunnel lining damage and its stabilization: A case study
Tan et al. Catastrophic failure of Shanghai metro line 4 in July, 2003: Occurrence, emergency response, and disaster relief
Ma et al. Failure analysis and treatments of a loess tunnel being constructed in ground fissure area
Kang et al. Improved compound support system for coal mine tunnels in densely faulted zones: a case study of China's Huainan coal field
Juran et al. Ground anchors and soil nails in retaining structures
Elbaz et al. Geohazards induced by anthropic activities of geoconstruction: a review of recent failure cases
Sterpi et al. Soil nailing at the tunnel face in difficult conditions: A case study
Frenelus et al. An Insight from Rock Bolts and Potential Factors Influencing Their Durability and the Long-Term Stability of Deep Rock Tunnels. Sustainability 2022, 14, 10943
Mutton et al. Design of water holding bulkheads for Coal Mines
Lee et al. Invert heaving in operational tunnels-problems and countermeasures
Chen et al. Modeling and simulation of deformation mechanism of soft rock roadway considering the mine water
Shen et al. Theory and Application of Gob‐Side Entry Retaining in Thick Three‐Soft Coal Seam
Zhang et al. Research on the underground water inrush mechanism based on the influence of fault
di Prisco et al. Assessment of excavation-related hazards and design of mitigation measures
Malm Low-pH concrete plug for sealing the KBS-3V deposition tunnels
Oke et al. Backfill barricade design: practical experiences and recommendations
e Sousa Learning with accidents and damage associated to underground works
Van Sambeek et al. Seal design alternatives study
Mutton et al. DESIGN AND CONSTRUCTION OF WATER HOLDING BULKHEADS AT XSTRATACOAL‟ S OAKY NO 1 MINE
Sandbak et al. Ground support strategies for weak ground masses at the Turquoise Ridge Joint Venture, Nevada
Pang et al. Application and Research of Gangue Partial‐Filling Mining Method in Preventing Water Inrush from Floor
Momenzadeh et al. Seismic retrofit of 92/280 I/C foundations by micropile groups in San Francisco Bay area, California
Miura Design and Construction of Mountain Tunnels