[go: up one dir, main page]

Jain et al., 1999 - Google Patents

Improving the manufacturing test interval and costs for telecommunication equipment

Jain et al., 1999

Document ID
10769389795892670414
Author
Jain A
Saraidaridis C
Publication year
Publication venue
Annual Reliability and Maintainability. Symposium. 1999 Proceedings (Cat. No. 99CH36283)

External Links

Snippet

Generally, most circuit packs of telecommunication systems are processed through a manufacturing test process that may include in-circuit test, functional test, factory environmental stress testing or environmental stress screening (ESS), and system tests …
Continue reading at ieeexplore.ieee.org (other versions)

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32234Maintenance planning
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0635Risk analysis
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41875Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by quality surveillance of production
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/45Nc applications
    • G05B2219/45031Manufacturing semiconductor wafers

Similar Documents

Publication Publication Date Title
Arnheiter et al. The integration of lean management and Six Sigma
US7006878B2 (en) Computer-implemented method for analyzing a problem statement based on an integration of Six Sigma, Lean Manufacturing, and Kaizen analysis techniques
Chiadamrong The development of an economic quality cost model
Eppen et al. Optimal location of inspection stations in a multistage production process
US20020147518A1 (en) Apparatus and method for monitoring manufacturing status
Son et al. A method of measuring quality costs
US6324527B1 (en) Methodology for distinguishing the cost of products in a multiple part number, multiple technology, fully or partially loaded semiconductor fabricator
Jain et al. Improving the manufacturing test interval and costs for telecommunication equipment
Barker Value‐adding performance measurement: a time‐based approach
Brush A Comparison of Classical and Bayes producer's risk
US6249776B1 (en) Methodology for proper weighting of photolithography in the cost of semiconductor products
Freeman Estimating quality costs
Spedding et al. System level improvement using discrete event simulation
Veatch Inspection strategies for multistage production systems with time-varying quality
Basse et al. A decision model for cost-optimized inspection planning
Fink et al. Economic models for single sample acceptance sampling plans, no inspection, and 100 percent inspection
Ghosh Equipment Investment Decision Analysis in CellularManufacturing
Yun-Cheng et al. The comparative study on expected total quality cost between traditional single sampling plan and economical design
CN111429154A (en) Traceable system for cable product production and inspection procedures
Crostack et al. Simulation in quality management–an approach to improve inspection planning
Mahoney et al. Cost analysis of lithographic characterization: an overview
Hafkamp et al. Designing and implementing a maintenance management system with an expert support system: methodology, implementation, expert IT-system, achieved cost reductions
Barad et al. Optimal yield improvement in multi-stage manufacturing systems
Dimitriou et al. Automatic Inspection Systems Cut Quality Control Costs by 60%
Tešnjak et al. Analysis of attribute acceptance sampling properties