WO2018049368A1 - Procédés d'arrivée de puits de forage pour stimulation de réservoir - Google Patents
Procédés d'arrivée de puits de forage pour stimulation de réservoir Download PDFInfo
- Publication number
- WO2018049368A1 WO2018049368A1 PCT/US2017/051078 US2017051078W WO2018049368A1 WO 2018049368 A1 WO2018049368 A1 WO 2018049368A1 US 2017051078 W US2017051078 W US 2017051078W WO 2018049368 A1 WO2018049368 A1 WO 2018049368A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- lateral section
- tunnels
- productive zone
- recited
- hydrocarbon fluid
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 45
- 230000000638 stimulation Effects 0.000 title claims abstract description 45
- 239000012530 fluid Substances 0.000 claims abstract description 61
- 239000004215 Carbon black (E152) Substances 0.000 claims abstract description 46
- 229930195733 hydrocarbon Natural products 0.000 claims abstract description 46
- 150000002430 hydrocarbons Chemical class 0.000 claims abstract description 46
- 238000004519 manufacturing process Methods 0.000 claims abstract description 42
- 238000005553 drilling Methods 0.000 claims abstract description 19
- 230000002708 enhancing effect Effects 0.000 claims description 14
- 238000011065 in-situ storage Methods 0.000 claims description 4
- 238000005086 pumping Methods 0.000 claims description 4
- 230000004936 stimulating effect Effects 0.000 claims description 2
- 230000000149 penetrating effect Effects 0.000 claims 2
- 230000015572 biosynthetic process Effects 0.000 description 19
- 238000005755 formation reaction Methods 0.000 description 19
- 239000004576 sand Substances 0.000 description 10
- 238000011282 treatment Methods 0.000 description 9
- 239000007788 liquid Substances 0.000 description 7
- 239000011435 rock Substances 0.000 description 5
- 230000007423 decrease Effects 0.000 description 4
- QTBSBXVTEAMEQO-UHFFFAOYSA-N Acetic acid Chemical compound CC(O)=O QTBSBXVTEAMEQO-UHFFFAOYSA-N 0.000 description 3
- 239000002253 acid Substances 0.000 description 3
- KRKNYBCHXYNGOX-UHFFFAOYSA-N citric acid Chemical compound OC(=O)CC(O)(C(O)=O)CC(O)=O KRKNYBCHXYNGOX-UHFFFAOYSA-N 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- KRHYYFGTRYWZRS-UHFFFAOYSA-N Fluorane Chemical compound F KRHYYFGTRYWZRS-UHFFFAOYSA-N 0.000 description 2
- VEXZGXHMUGYJMC-UHFFFAOYSA-N Hydrochloric acid Chemical compound Cl VEXZGXHMUGYJMC-UHFFFAOYSA-N 0.000 description 2
- 239000013043 chemical agent Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000001965 increasing effect Effects 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 150000007513 acids Chemical class 0.000 description 1
- WYTGDNHDOZPMIW-RCBQFDQVSA-N alstonine Natural products C1=CC2=C3C=CC=CC3=NC2=C2N1C[C@H]1[C@H](C)OC=C(C(=O)OC)[C@H]1C2 WYTGDNHDOZPMIW-RCBQFDQVSA-N 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000002738 chelating agent Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 239000003380 propellant Substances 0.000 description 1
- 230000003252 repetitive effect Effects 0.000 description 1
- 238000009491 slugging Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Definitions
- the subterranean formation is stimulated to enhance recovery of hydrocarbon fluids such as oil and gas.
- One form of well stimulation is hydraulic fracturing which may be conducted in a wellbore following a drilling operation and an optional casing operation. Hydraulic fracturing operations initially were performed in single stage vertical or near vertical wells. To further improve productivity, however, hydraulic fracturing operations have trended toward use in generally horizontal wells. Although horizontal fracturing operations have improved productivity, current methods have limitations with respect to productivity and efficiency in certain types of subterranean environments and operations.
- a well is formed in a subterranean region by drilling a borehole, e.g. a wellbore, which has a lateral section.
- the lateral section may be located at least in part in a non-productive zone of the subterranean region.
- at least one tunnel is formed which intersects the lateral section and penetrates a productive zone containing hydrocarbon fluid.
- a plurality of tunnels may be formed to extend from the lateral section outwardly into the productive zone.
- a well stimulation e.g. hydraulic fracturing, may be performed through the tunnel(s) to stimulate a desired stimulation zone or zones within the productive zone.
- Figure 1 is a schematic illustration of an example of a well system having a borehole with a lateral section and a plurality of tunnels extending from the lateral section, according to an embodiment of the disclosure
- Figure 2 is a schematic illustration of another embodiment of the well system with a lateral section and a plurality of tunnels, according to an embodiment of the disclosure
- Figure 3 is a schematic illustration of an example of a borehole having one type of lateral section, according to an embodiment of the disclosure
- Figure 4 is a schematic illustration of another example of a borehole having a different type of lateral section, according to an embodiment of the disclosure
- Figure 5 is a schematic illustration of another example of a borehole having a different type of lateral section, according to an embodiment of the disclosure
- Figure 6 is a schematic illustration of another embodiment of the well system with a lateral section and a plurality of tunnels, according to an embodiment of the disclosure
- Figure 7 is a schematic illustration of another embodiment of the well system with a lateral section and a plurality of tunnels, according to an embodiment of the disclosure
- Figure 8 is a schematic illustration of another embodiment of the well system with a lateral section and a plurality of tunnels, according to an embodiment of the disclosure
- Figure 9 is a schematic illustration of another embodiment of the well system with a lateral section and a plurality of tunnels, according to an embodiment of the disclosure.
- Figure 10 is a schematic illustration of another embodiment of the well system with a lateral section and a plurality of tunnels, according to an embodiment of the disclosure
- Figure 1 1 is a schematic illustration of another embodiment of the well system with a lateral section and a plurality of tunnels, according to an embodiment of the disclosure.
- Figure 12 is a schematic illustration of another embodiment of the well system with a lateral section and a plurality of tunnels, according to an embodiment of the disclosure.
- a well may be formed in a subterranean region by drilling a borehole, e.g. a wellbore, which has a lateral section.
- a borehole e.g. a wellbore
- the wellbore may be drilled from the surface along a generally vertical section and then turned laterally and drilled to form a lateral section in the subterranean region.
- the lateral section may generally be a horizontal section although the horizontal section may have undulating, e.g. sinusoidal, or inclined/declined sections of wellbore.
- the lateral section may be located at least in part in a non-productive zone of the subterranean region.
- the nonproductive zone is a zone which contains limited amounts of hydrocarbon fluid or is less desirable with respect to production of hydrocarbon fluid.
- the nonproductive zone may be in a zone of the subterranean region which has a substantially higher minimum in situ stress in the rock compared to a desirable productive zone.
- At least one tunnel is formed which intersects the lateral section and penetrates a productive zone containing hydrocarbon fluid.
- a plurality of tunnels may be formed to extend from the lateral section outwardly into the productive zone.
- the lateral section of the wellbore may be entirely outside of the productive zone and a plurality of tunnels may be formed in a desired direction, e.g. upwardly and/or downwardly, to reach the productive zone. In other applications, however, the lateral section of wellbore may extend into or through the productive zone.
- a well stimulation may be performed through the tunnel(s) to stimulate a desired stimulation zone or zones within the productive zone.
- the well stimulation may comprise a hydraulic fracturing of the stimulation zone or zones. Hydraulic fracturing may be achieved by pumping a fracturing fluid down through the wellbore and out through the tunnels to fracture the subterranean formation at the stimulation zones adjacent the tunnels. The fracturing of the stimulation zones within the productive zone enhances production of hydrocarbon fluid from the productive zone to the wellbore and ultimately to the surface.
- the lateral section of wellbore is drilled as a horizontal section of the well outside of a target zone, e.g. above or below the target zone.
- the target zone may be a productive zone of the subterranean region containing desired hydrocarbon fluid.
- more than two substantially vertical tunnels are formed to extend from the horizontal section so as to penetrate the target zone.
- a stimulation procedure is then performed through the vertical tunnels.
- the horizontal section of the well may be landed in a nonproductive rock and/or in a region with petrophysical and geo-mechanical properties different from the properties of the target zone, e.g. a substantially higher minimum in situ stress relative to that of the target zone.
- the substantially vertical tunnels may be used in certain types of formations, e.g. laminated formations, to facilitate flow of fluid to the tunnels even in the presence of pinch points between formation layers.
- the general methodology comprises initially drilling a borehole with a lateral section in a subterranean region.
- a plurality of tunnels may be formed so as to extend outwardly, e.g. upwardly and/or downwardly, from the lateral section.
- a fracturing fluid may then be pumped down through the borehole, into the lateral section, and out through the plurality of tunnels.
- the fracturing fluid is forced under pressure from the tunnels out into the surrounding subterranean region, e.g. into the surrounding oil bearing formation, to fracture the surrounding subterranean region.
- the surrounding subterranean region/formation may be fractured at a plurality of stimulation zones within the overall productive zone or zones.
- the fracturing fluid also may comprise propping agent for providing fracture conductivity after fracture closure.
- the fracturing fluid may comprise acid such as hydrochloric acid, acetic acid, citric acid, hydrofluoric acid, other acids, or mixtures thereof.
- a well system 20 is illustrated as extending into a subterranean region 22.
- the well system 20 enables a methodology for enhancing recovery of hydrocarbon fluid, e.g. oil and/or gas, from a well.
- a borehole 24, e.g. a wellbore is drilled down into the subterranean region 22 and includes a lateral section 26.
- the lateral section 26 may be generally horizontal although the horizontal section may comprise inclines, declines, and undulations formed intentionally or resulting from drilling through the rock of subterranean region 22.
- At least one tunnel 28 and often a plurality of tunnels 28 may be formed to intersect the lateral section 26.
- the tunnels 28 provide fluid communication with an interior of the lateral section 26 to facilitate flow of the desired hydrocarbon fluid from tunnels 28, into lateral section 26, and up through wellbore 24 to, for example, a surface collection location 30.
- the tunnels 28 may be oriented in various directions depending on the material forming subterranean region 22 and on the location of desired hydrocarbon fluids.
- the tunnels 28 may be formed in a generally vertical orientation to extend upwardly from lateral section 26 as illustrated in Figure 1.
- the tunnels 28 also may be formed in a generally vertical orientation to extend downwardly from lateral section 26, as illustrated in Figure 2.
- the structure of the rock formation may create flow pinch points 32 (see upper left diagram in Figure 1 and lower left diagram in Figure 2). The flow pinch points 32 effectively may be stacked above each other even after performance of a hydraulic fracturing operation.
- tunnels 28 facilitates the flow of hydrocarbon fluid past these pinch points and into the tunnels 28 for delivery to lateral section 26. It should be noted other embodiments may utilize tunnels 28 extending in different directions and/or in multiple directions from the lateral section 26.
- a stimulation operation may be performed via tunnels 28 to create stimulation zones 34 which facilitate flow of fluid into the corresponding tunnels 28.
- hydraulic fracturing operations may be performed to fracture the subterranean region 22, e.g. oil bearing formation, to facilitate flow of the desired fluid into the corresponding tunnels 28.
- the stimulation operation is a hydraulic fracturing operation
- fracturing fluid may be pumped from the surface, down through wellbore 24, through lateral section 26, into tunnels 28, and then into the stimulation zones 34 surrounding the corresponding tunnels 28.
- a perforating operation may be performed in tunnels 28 to facilitate fracturing of the desired zones 34 in subterranean region 22.
- the tunnels 28/zones 34 may be fractured sequentially.
- the fracturing operation may be performed through sequential groups of tunnels 28 or sequentially through individual tunnels 28 to cause sequential fracturing of the stimulation zones 34.
- the tunnels 28 may be formed via a variety of techniques, such as various drilling techniques. For example, drilling equipment may be deployed down into lateral section 26 and used to form the desired number of tunnels 28 in appropriate orientations for a given subterranean environment and production operation. However, the tunnels 28 also may be formed by other suitable techniques, such as jetting techniques, laser techniques, or other available tunnel formation techniques. [0030] Depending on the parameters of the given subterranean environment and production operation, the wellbore 24 may be completed with various types of equipment and procedures. By way of example, a casing 36 may be deployed along at least a portion of the wellbore 24, e.g. along a generally vertical portion 38 of wellbore 24.
- the casing 36 also may be deployed along lateral, e.g. horizontal, section 26 which may be completed as a cased or open hole section. A cementing procedure may then be performed to place a cement 40 along the casing 36.
- Other completion equipment may comprise various sand screen assemblies, packers, sleeves, control valves, and other suitable equipment to facilitate stimulation and/or production.
- the completion equipment comprises a plurality of packers 42, e.g. open hole packers, deployed along lateral section 26.
- flow control devices 44 e.g. frac sleeves, may be positioned to enable selective control of flow between individual tunnels 28 and the interior of lateral section 26.
- Many other types of equipment may be used to control flow and to facilitate aspects of the injection and/or production operations.
- FIG. 3-5 different configurations of wellbore 24 are illustrated as having lateral section 26 disposed in slightly different orientations and configurations. Depending on the configuration of lateral section 26, the movement of hydrocarbon fluid and thus the efficiency of production may be affected. However, the formation of tunnels 28 and stimulation zones 34 facilitate improved and more efficient hydrocarbon production with several types of configurations of lateral section 26.
- the well and well system 20 may demonstrate a "slugging" behavior due to the undulating or serpentine configuration of lateral section 26.
- the "sinusoidality" of lateral section 26 may lead to repetitive accumulation of liquid 46, e.g. oil, in lower portions of the lateral/horizontal section 26.
- the portions of liquid 46 may be separated by gas 48 disposed between portions of liquid 46.
- Such a configuration could lead to decreased production performance, but the formation of tunnels 28 and stimulation zones 34 enhance the production capability.
- the oil 46 and/or gas 48 may be the desired hydrocarbon fluid produced to surface location 30.
- the liquid unloading efficiency of the wellbore 24 may be improved by reducing or eliminating the wellbore "sinusoidality" by drilling the lateral section 26 at a slight decline such that liquid/oil 46 collects in a toe 50 of the lateral section 26, as illustrated in Figure 4.
- the liquid unloading efficiency may be improved by drilling the lateral section at a slight incline such that the liquid/oil 46 collects in a heel 52 of the lateral section 26, as illustrated in Figure 5.
- the tunnels 28 may be formed to facilitate production when the lateral section 26 is located in a productive zone, partially in a productive zone, or outside of a productive zone containing the desired hydrocarbon 46/48. Stimulation of zones 34, e.g. fracturing of zones 34, also may be used to facilitate production by increasing the flow of hydrocarbon fluid into tunnels 28 and thus into lateral section 26.
- FIG. 6-9 various wellbore geometries are illustrated to facilitate production of a hydrocarbon fluid, e.g. oil and/or gas, from a productive zone 54 in subterranean region 22.
- a hydrocarbon fluid e.g. oil and/or gas
- the lateral section 26 of wellbore 24 is drilled generally horizontally but with an incline such that the toe 50 is higher than the heel 52 similar to the configuration illustrated in Figure 5.
- the plurality of tunnels 28 may be constructed to intersect lateral section 26 and to extend downwardly such that the tunnels 28 penetrate the productive zone 54.
- the tunnels 28 may extend into or through the productive zone 54.
- the tunnels 28 may be oriented generally vertically and may extend at least partially through a nonproductive zone or zones 56 as well as productive zone 54.
- the lateral section 26 may be located entirely in a nonproductive zone 56.
- the tunnels 28 are formed, e.g. drilled, from lateral section 26, through the initial nonproductive zone 56, and into the productive zone 54 to facilitate production of the desired hydrocarbon fluid.
- stimulation treatments may be performed through the tunnels 28 to create the stimulation zones 34.
- fracturing fluid may be pumped down through wellbore 24, through lateral section 26, through tunnels 28, and into the surrounding formation of productive zone 54 to create stimulated/hydraulically fractured zones 34.
- the wellbore geometry may be selected such that a similarly inclined lateral section 26 of wellbore 24 extends through the productive zone 54, as illustrated in Figure 7.
- the tunnels 28 may be appropriately oriented in the downward direction and upward direction as illustrated, such that they penetrate the productive zone 54.
- the tunnels 28 may again be used to form the stimulation zones 34 so as to facilitate enhanced production of hydrocarbon fluids 46/48 from the productive zone 54.
- the lateral section 26 of wellbore 24 may be drilled generally horizontally but with a decline such that the toe 50 is lower than the heel 52 similar to the configuration illustrated in Figure 4.
- the plurality of tunnels 28 may be constructed to intersect lateral section 26 and to extend downwardly such that the tunnels 28 penetrate the productive zone 54, e.g. extend into or through the productive zone 54.
- the lateral section 26 may again be located entirely in a nonproductive zone 56.
- the tunnels 28 may be formed, e.g. drilled, from lateral section 26, through the initial nonproductive zone 56, and into the productive zone 54 to facilitate production of the desired hydrocarbon fluid. Stimulation treatments may be performed through the tunnels 28 to create the stimulation zones 34 within productive zone 54.
- the wellbore geometry may be selected such that a similarly declined lateral section 26 of wellbore 24 extends through the productive zone 54, as illustrated in Figure 9.
- the tunnels 28 may be appropriately oriented in the downward direction and upward direction, as illustrated, such that they penetrate the productive zone 54.
- the tunnels 28 may again be used to form the stimulation zones 34 so as to facilitate enhanced production of hydrocarbon fluids 46/48 from the productive zone 54.
- the particular geometry of wellbore 24 and lateral section 26, as well as the number and orientation of tunnels 28, may be selected according to various considerations.
- the geometry may be based on considerations of flow performance of the wellbore, e.g. flow performance in productive zone 54, and on the accessibility of the productive zone 54 via, for example, tunnels 28.
- a variety of stimulation techniques other than or in addition to hydraulic fracturing may be used via tunnels 28 to create stimulation zones 34. Examples of such other stimulation techniques include matrix acidizing, acid fracturing, propellant treatment, injection of chelating agents, or other suitable stimulation techniques.
- the lateral section 26 as well as other portions of wellbore 24 may be formed within, through, or outside of the productive zone 54.
- FIG. 10 additional examples of wellbore geometries are illustrated. These wellbore geometries are able to similarly facilitate production of a hydrocarbon fluid, e.g. oil and/or gas, from productive zone 54 in subterranean region 22.
- a hydrocarbon fluid e.g. oil and/or gas
- the lateral section 26 of wellbore 24 is drilled generally horizontally but with an undulating configuration to follow a certain formation layer.
- the sinusoidal lateral section 26 may be oriented at a general incline, as illustrated, or a general decline.
- the plurality of tunnels 28 may be constructed to intersect lateral section 26 and to extend downwardly such that the tunnels 28 penetrate the productive zone 54.
- the tunnels 28 may extend into or through the productive zone 54.
- the tunnels 28 may be oriented generally vertically and may extend at least partially through a nonproductive zone or zones 56 as well as productive zone 54.
- the lateral section 26 may be located entirely in a nonproductive zone 56, as illustrated, or the lateral section 26 of wellbore 24 may enter the productive zone 54.
- the tunnels 28 may be formed, e.g. drilled, from lateral section 26, through the initial nonproductive zone 56, and into the productive zone 54.
- stimulation treatments may be performed through the tunnels 28 to create the stimulation zones 34 as with other embodiments described herein.
- lateral section 26 may be disposed in a nonproductive zone 56 below the productive zone 54, as illustrated in Figure 11.
- the tunnels 28 again intersect the lateral section 26 but extend generally upwardly to penetrate the productive zone 54.
- the tunnels 28 may be formed to terminate within the productive zone 54 or to extend through the productive zone 54 as with other embodiments described herein.
- the lateral section 26 is disposed between two productive zones 54.
- the lateral section 26 may follow a desired formation layer, as illustrated, or may have other substantially horizontal configurations.
- the tunnels 28 may be formed in a substantially vertical orientation extending both upwardly into the first productive zone 54 and downwardly into the second productive zone 54.
- stimulation zones 34 may be formed to facilitate hydrocarbon production, and those stimulation zones 34 may be located in both productive zones 54.
- the lateral section 26 may be drilled in productive zone 54 and/or nonproductive zone 56.
- the specific configuration of the wellbore 24 and the location of lateral section 26 in one or more productive zones 54 and non-productive zones 56 may depend on the type of environment found in subterranean region 22.
- the lateral section 26 of wellbore 24 may be landed in zones having properties which minimize the likelihood of creating hydraulic fractures in those zones.
- the lateral section 26 may be landed in a nonproductive zone 56 having, for example, a higher minimum in situ stress than the productive zone 54.
- the lateral section 26 also may be landed in a non-productive zone 56 which has a higher density of natural fractures which, when hydraulically fractured, conform initially complex fracture networks having low fracture width. In this latter type of fracture network, propagation of the fracture network can be stopped via bridging solid particles in created fractures.
- the use of tunnels 28 obviates this type of problem by ensuring fracturing occurs in the desired productive zone 54.
- the lateral section 26 may be landed in a non-productive zone 56 which has high poroelasticity or pseudo-poroelasticity.
- tunnels 28 may be formed to extend from the open hole lateral section 26; and open hole packers 42 may be used to provide isolation between various wellbore zones. If the lateral section 26 is placed in a non-productive zone 56 with relatively higher stress, the productive zone 54 may be fractured or otherwise stimulated through the tunnels 28 - thus minimizing the likelihood of creating fractures extending from the open hole portion of the lateral section 26 but not connected to tunnels 28.
- Placement of the lateral section 26 in such non-productive zones 56 also may be used to facilitate acidizing treatments and other chemical treatments.
- lateral section 26 may be located in a zone which is not reactive to the pumped chemical agents.
- tunnels 28 may be used to enable transfer of the chemical agents to the desired zone, e.g. productive zone 54.
- the production of hydrocarbon fluids from productive zones 54 may be increased greatly by utilizing a substantially horizontal lateral section 26 and substantially vertical tunnels 28.
- the rock in a given subterranean region 22 may be layered to effectively create a laminated formation and such a formation can create stacked pinch points 32 which restrict flow if fracturing is performed from a horizontal section of the wellbore.
- the use of wellbore geometries having a substantially horizontal lateral section 26 and substantially vertical tunnels 28 can substantially reduce the impact of pinch points and enhance production of hydrocarbon fluids 46, 48 through the wellbore 24.
- references to substantially vertical tunnels 28, extending upwardly or downwardly may be considered as tunnels 28 oriented at an angle less than 45° from vertical. In some embodiments, tunnels 28 are oriented at an angle less than 20° from vertical. However, the tunnels 28 may be formed with other orientations and configurations, e.g. various serpentine configurations, lateral orientations, or other configurations and orientations suited for the parameters of a given application.
- references to substantially horizontal lateral section 26 may be considered lateral sections inclined/declined less than 45° from horizontal. In some embodiments, the substantially horizontal lateral section 26 is inclined/declined less than 20° from horizontal. However, lateral section 26 may be formed at other angles and with other configurations selected according to the parameters of a given environment and operation.
- the wellbore geometries described herein also may be used to reduce the amount of sand and material used in a variety of fracturing operations while still enhancing production of the desired hydrocarbon fluids.
- records indicate that approximately 2000 wells, including those of the Barnett Shale reservoir, were arranged vertically and stimulated with approximately 100,000- 500,000 pounds of sand and approximately 5000-20,000 bbls of fluid, e.g. water.
- stimulation occurred in 5-10 stages with approximately 100,000- 500,000 pounds of sand and approximately 5000-20,000 bbls of fluid per stage.
- the wellbore geometries described herein increase efficiency with respect to use of sand and fluid by employing substantially vertical tunnels 28 in combination with a substantially horizontal lateral section 26.
- the substantially vertical tunnels 28 enhance production from one or more productive zones 54 while limiting the inefficient use of sand/proppant associated with hydraulic fracturing from horizontal wellbores.
- the wellbore geometries described herein may be adjusted according to the type, size, orientation, and other features of the productive zone or zones 54. Additionally, the location of the lateral section 26 as well as the tunnels 28 may be affected by the type of non-productive zones 56 adjacent the productive zone(s) 54 containing desired hydrocarbon fluids. Similarly, many different types of equipment, e.g. packers, valves, sleeves, sand screens, and/or other types of equipment may be used in completing the lateral section 26 as well as the overall wellbore 24. Various sections of the wellbore 24, including the lateral section 26, may be cased or open-hole depending on the parameters of the specific application.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Selon l'invention, une technique facilite la production améliorée de fluide hydrocarboné. Un puits est formé dans une région souterraine par forage d'un trou de forage, par exemple un puits de forage, qui a une section latérale. La section latérale peut être située au moins en partie dans une zone non productive de la région souterraine. En coopération avec la section latérale, il est formé au moins un tunnel qui coupe la section latérale et pénètre dans une zone productive contenant du fluide hydrocarboné. Une pluralité de tunnels peut être formée pour s'étendre à partir de la section latérale vers l'extérieur dans la zone productive. Une opération de stimulation de puits, par exemple une fracturation hydraulique, est effectuée par le ou les tunnels pour stimuler une ou des zones de stimulation souhaitées à l'intérieur de la zone productive.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CA3036536A CA3036536A1 (fr) | 2016-09-12 | 2017-09-12 | Procedes d'arrivee de puits de forage pour stimulation de reservoir |
US16/332,433 US20210102453A1 (en) | 2016-09-12 | 2017-09-12 | Wellbore landing methods for reservoir stimulation |
EP17849751.7A EP3510246A4 (fr) | 2016-09-12 | 2017-09-12 | Procédés d'arrivée de puits de forage pour stimulation de réservoir |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201662393327P | 2016-09-12 | 2016-09-12 | |
US62/393,327 | 2016-09-12 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2018049368A1 true WO2018049368A1 (fr) | 2018-03-15 |
Family
ID=61561695
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2017/051078 WO2018049368A1 (fr) | 2016-09-12 | 2017-09-12 | Procédés d'arrivée de puits de forage pour stimulation de réservoir |
Country Status (4)
Country | Link |
---|---|
US (1) | US20210102453A1 (fr) |
EP (1) | EP3510246A4 (fr) |
CA (1) | CA3036536A1 (fr) |
WO (1) | WO2018049368A1 (fr) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424945A (zh) * | 2019-08-01 | 2019-11-08 | 中国石油天然气股份有限公司大港油田分公司 | 页岩油水平井部署方法及装置 |
US10815766B2 (en) | 2015-02-27 | 2020-10-27 | Schlumberger Technology Corporation | Vertical drilling and fracturing methodology |
US11193332B2 (en) | 2018-09-13 | 2021-12-07 | Schlumberger Technology Corporation | Slider compensated flexible shaft drilling system |
US11203901B2 (en) | 2017-07-10 | 2021-12-21 | Schlumberger Technology Corporation | Radial drilling link transmission and flex shaft protective cover |
US11466549B2 (en) | 2017-01-04 | 2022-10-11 | Schlumberger Technology Corporation | Reservoir stimulation comprising hydraulic fracturing through extended tunnels |
US11486214B2 (en) | 2017-07-10 | 2022-11-01 | Schlumberger Technology Corporation | Controlled release of hose |
US11634978B2 (en) * | 2020-02-18 | 2023-04-25 | Canatech Management Services Inc. | Methods for recovering a mineral from a mineral-bearing deposit |
US11840909B2 (en) | 2016-09-12 | 2023-12-12 | Schlumberger Technology Corporation | Attaining access to compromised fractured production regions at an oilfield |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030062167A1 (en) * | 2001-09-28 | 2003-04-03 | Halliburton Energy Services | System and method for fracturing a subterranean well formation for improving hydrocarbon production |
WO2005090747A1 (fr) * | 2004-03-24 | 2005-09-29 | Halliburton Energy Services, Inc. | Procedes d'isolation de zones stimulees par jet hydraulique |
US20100126722A1 (en) * | 2007-03-28 | 2010-05-27 | Erik Kerst Cornelissen | Wellbore system and method of completing a wellbore |
US20110061869A1 (en) * | 2009-09-14 | 2011-03-17 | Halliburton Energy Services, Inc. | Formation of Fractures Within Horizontal Well |
US20160153239A1 (en) * | 2011-08-05 | 2016-06-02 | Coiled Tubing Specialties, Llc | Method of Forming Lateral Boreholes From a Parent Wellbore |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140096950A1 (en) * | 2012-10-04 | 2014-04-10 | Nexen Inc. | Hydraulic Fracturing Process for Deviated Wellbores |
WO2016138005A1 (fr) * | 2015-02-27 | 2016-09-01 | Schlumberger Technology Corporation | Procédé de forage vertical et de fracturation |
WO2018049311A1 (fr) * | 2016-09-09 | 2018-03-15 | Schlumberger Technology Corporation | Forage et simulation de formation souterraine |
-
2017
- 2017-09-12 EP EP17849751.7A patent/EP3510246A4/fr not_active Withdrawn
- 2017-09-12 CA CA3036536A patent/CA3036536A1/fr not_active Abandoned
- 2017-09-12 WO PCT/US2017/051078 patent/WO2018049368A1/fr active Application Filing
- 2017-09-12 US US16/332,433 patent/US20210102453A1/en not_active Abandoned
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030062167A1 (en) * | 2001-09-28 | 2003-04-03 | Halliburton Energy Services | System and method for fracturing a subterranean well formation for improving hydrocarbon production |
WO2005090747A1 (fr) * | 2004-03-24 | 2005-09-29 | Halliburton Energy Services, Inc. | Procedes d'isolation de zones stimulees par jet hydraulique |
US20100126722A1 (en) * | 2007-03-28 | 2010-05-27 | Erik Kerst Cornelissen | Wellbore system and method of completing a wellbore |
US20110061869A1 (en) * | 2009-09-14 | 2011-03-17 | Halliburton Energy Services, Inc. | Formation of Fractures Within Horizontal Well |
US20160153239A1 (en) * | 2011-08-05 | 2016-06-02 | Coiled Tubing Specialties, Llc | Method of Forming Lateral Boreholes From a Parent Wellbore |
Non-Patent Citations (1)
Title |
---|
See also references of EP3510246A4 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10815766B2 (en) | 2015-02-27 | 2020-10-27 | Schlumberger Technology Corporation | Vertical drilling and fracturing methodology |
US11840909B2 (en) | 2016-09-12 | 2023-12-12 | Schlumberger Technology Corporation | Attaining access to compromised fractured production regions at an oilfield |
US11466549B2 (en) | 2017-01-04 | 2022-10-11 | Schlumberger Technology Corporation | Reservoir stimulation comprising hydraulic fracturing through extended tunnels |
US11203901B2 (en) | 2017-07-10 | 2021-12-21 | Schlumberger Technology Corporation | Radial drilling link transmission and flex shaft protective cover |
US11486214B2 (en) | 2017-07-10 | 2022-11-01 | Schlumberger Technology Corporation | Controlled release of hose |
US11193332B2 (en) | 2018-09-13 | 2021-12-07 | Schlumberger Technology Corporation | Slider compensated flexible shaft drilling system |
CN110424945A (zh) * | 2019-08-01 | 2019-11-08 | 中国石油天然气股份有限公司大港油田分公司 | 页岩油水平井部署方法及装置 |
CN110424945B (zh) * | 2019-08-01 | 2022-12-13 | 中国石油天然气股份有限公司大港油田分公司 | 页岩油水平井部署方法及装置 |
US11634978B2 (en) * | 2020-02-18 | 2023-04-25 | Canatech Management Services Inc. | Methods for recovering a mineral from a mineral-bearing deposit |
Also Published As
Publication number | Publication date |
---|---|
US20210102453A1 (en) | 2021-04-08 |
EP3510246A4 (fr) | 2020-03-25 |
CA3036536A1 (fr) | 2018-03-15 |
EP3510246A1 (fr) | 2019-07-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210102453A1 (en) | Wellbore landing methods for reservoir stimulation | |
US7766083B2 (en) | Methods of isolating hydrajet stimulated zones | |
US5058676A (en) | Method for setting well casing using a resin coated particulate | |
US5947200A (en) | Method for fracturing different zones from a single wellbore | |
US4917188A (en) | Method for setting well casing using a resin coated particulate | |
US7401652B2 (en) | Multi-perf fracturing process | |
US20080179060A1 (en) | Hydrajet Bottomhole Completion Tool and Process | |
AU2018205724B2 (en) | Reservoir stimulation comprising hydraulic fracturing through extended tunnels | |
US20090260814A1 (en) | System and Method to Facilitate Treatement and Sand Control in a Wellbore | |
US12258846B2 (en) | Non-fracturing restimulation of unconventional hydrocarbon containing formations to enhance production | |
McDaniel et al. | Limited-entry frac applications on long intervals of highly deviated or horizontal wells | |
Lestz et al. | Perforating for stimulation: An engineered solution | |
Masood* et al. | Making the Connection Between Conventional and Unconventional | |
WO2025141304A1 (fr) | Revêtement d'entrée limité pour stimulation de réservoir d'hydrocarbures avec des capacités de pénétration profonde | |
Pradipta et al. | Thru Tubing Fracturing Experience in Tight Sand Reservoir, Offshore North West Java | |
Arora et al. | The Application of Sand Jet Perforation in Multistage Hydraulic Fracturing Treatments in Volcanic Reservoir India | |
EA038423B1 (ru) | Способ разработки нефтяной залежи | |
dos Santos et al. | Selective Placement of Fractures in Horizontal Wells in Offshore Brazil Demonstrates Effectiveness of Hydrajet Stimulation Process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17849751 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 3036536 Country of ref document: CA |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2017849751 Country of ref document: EP |