[go: up one dir, main page]

WO2015054869A1 - 一种兆瓦级电池储能电站的监控系统及其方法 - Google Patents

一种兆瓦级电池储能电站的监控系统及其方法 Download PDF

Info

Publication number
WO2015054869A1
WO2015054869A1 PCT/CN2013/085410 CN2013085410W WO2015054869A1 WO 2015054869 A1 WO2015054869 A1 WO 2015054869A1 CN 2013085410 W CN2013085410 W CN 2013085410W WO 2015054869 A1 WO2015054869 A1 WO 2015054869A1
Authority
WO
WIPO (PCT)
Prior art keywords
energy storage
power
value
real
module
Prior art date
Application number
PCT/CN2013/085410
Other languages
English (en)
French (fr)
Inventor
李相俊
惠东
来小康
贾学翠
王立业
郭光朝
王平
梁廷婷
张亮
Original Assignee
国网新源张家口风光储示范电站有限公司
中国电力科学研究院
国家电网公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 国网新源张家口风光储示范电站有限公司, 中国电力科学研究院, 国家电网公司 filed Critical 国网新源张家口风光储示范电站有限公司
Priority to US14/123,518 priority Critical patent/US9660450B2/en
Priority to PCT/CN2013/085410 priority patent/WO2015054869A1/zh
Publication of WO2015054869A1 publication Critical patent/WO2015054869A1/zh

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S10/00PV power plants; Combinations of PV energy systems with other systems for the generation of electric power
    • H02S10/20Systems characterised by their energy storage means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S50/00Monitoring or testing of PV systems, e.g. load balancing or fault identification
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Definitions

  • the invention belongs to the field of smart grid and energy storage and conversion technology, and particularly relates to a monitoring system and method for a megawatt battery energy storage power station, and is particularly suitable for monitoring and managing a grid connection system of a large-scale battery energy storage power station.
  • the National Scenery Storage and Depot Demonstration Project is the first pilot project of the State Grid Corporation to build a strong smart grid. It is characterized by "grid-friendly" new energy generation and is characterized by "advancedness, flexibility, demonstration and economy". The world's largest comprehensive demonstration project for renewable energy, including wind power, photovoltaic power generation, energy storage and transmission engineering. Among them, the National Landscape Storage and Demonstration Project (Phase I) plans to build wind power 100, photovoltaic power generation 40MW and energy storage device 20MW (including 14MW lithium-ion battery energy storage system and 2 Xia liquid battery energy storage system).
  • the energy storage power station monitoring system needs to meet the performance requirements of real-time dispatching and control of the end users of the distribution network, and respond to the demand of energy storage systems in various application scenarios of the high-speed response grid.
  • a huge challenge has come. Whether in the monitoring architecture and communication network optimization, hardware support system development, real-time response man-machine interface design, etc., there are quite a few problems and constraints.
  • one of the objects of the present invention is to provide a monitoring system for a safer and more stable megawatt battery energy storage power station, which can not only meet the cluster real-time rapid control of the energy storage unit and dozens of The monitoring requirements of 10,000 transmission data can also minimize the deterioration of the battery and ensure the healthy operation of the bubble.
  • a monitoring system for a megawatt battery energy storage power plant comprising:
  • the central monitoring module is configured to determine the power command value of each energy storage substation in the battery energy storage power station and send it to each local monitoring module in real time:
  • each local monitoring module respectively administers an energy storage substation, which is used for calculating the power command value of each energy storage unit in the energy storage substation, and is sent to each energy storage unit in real time, and each The power command value of the energy storage unit is transmitted to the central monitoring module for storage;
  • the central monitoring module and the local monitoring module use a communication network for data transmission and communication, and the communication network adopts a real-time communication network and a non-real-time monitoring communication network in parallel.
  • the relevant data of the battery energy storage power station includes real-time data transmitted through a real-time communication network and non-real-time data transmitted through the monitoring communication network;
  • the real-time data includes upper-level scheduling data, wind power generation data, and real-time data of all energy storage units
  • the non-real time data includes non-real time data of all energy storage units, specifically:
  • the upper scheduling data includes any one of the following data: tracking planned power generation curve value, system load curve value, peak clipping curve value, system frequency modulation power command value, battery energy storage power station total power demand, battery energy storage power station load value, and Wind power storage combined power generation total power value;
  • the wind power generation data includes any one of the following data: wind power generation smoothing target value, wind power generation volatility value, total wind power generation power value, wind power generation plan value; wind turbine generator active power in wind power plant, wind turbine operation State, total power value of wind power, rated power of wind power, predicted power of wind power, etc., and active power of each photovoltaic generator set in a photovoltaic power plant, Working status of each photovoltaic generating unit, total power generation value of photovoltaic power generation, rated power of photovoltaic power generation, predicted power of photovoltaic power generation, etc.; real-time data of energy storage units include any one of the following data: rated power, actual power value, and state of energy storage unit Information (eg; controllable signal, operating status, alarm status, protection status, tuning status, etc.), operating mode, available charging capacity, ⁇ discharge capacity, maximum allowable charging power, maximum allowable discharge power, state of charge value, discharge State value, health state value and actual total power value of the battery energy storage power station (e
  • the non-real-time data of the energy storage unit includes any one of the following data: voltage information, temperature information and non-real-time status information of each battery unit in the energy storage unit.
  • Another object of the present invention is to provide a monitoring method for a megawatt battery energy storage power plant, which includes the following steps:
  • Step A The central monitoring module reads related data of the battery energy storage power station through the communication network, and stores and manages the above data, wherein the communication network adopts a parallel network structure of the real-time communication network and the non-real-time monitoring communication network;
  • Step B determining a total power requirement of the battery energy storage power station based on the central monitoring module
  • Step C Determine a power command value of each energy storage substation in the battery energy storage power station based on the central monitoring module, and send the power command value to each local monitoring module;
  • Step D Calculate the power command value of each energy storage unit in the energy storage substation under the jurisdiction of the module, and send it to each energy storage unit; and at the same time, the current calculation of the energy storage substation in the module Controllable state, state of charge, etc.:
  • Step E storing the power command value of each energy storage unit stored in the local monitoring module, the current controllable state of the energy storage substation under the jurisdiction, the state of charge, the real-time data and the non-real-time data are uploaded to the central monitoring through the communication network. Modules are stored and managed.
  • the relevant data of the battery energy storage power station is first read through the communication network; the related data of the battery energy storage power station is stored, and the related data is assigned to the corresponding interface variable.
  • the corresponding calculation method may be selected according to the actual monitoring requirements to calculate or directly read the total power demand of the battery energy storage power station delivered by the external dispatch center.
  • step C according to the current symbol of the total power demand of the battery energy storage station, the controllable signal of the energy storage substation, the total power demand of the battery energy storage power station, and the state of charge or discharge state of the energy storage substation are real-time. Calculate the power command value of each energy storage substation in the battery energy storage power station.
  • the decision variable of each energy storage unit is calculated by using the maximum allowable discharge power or the maximum allowable charging power, and then the power command value of each energy storage unit is obtained; And judging whether each energy storage unit meets the maximum allowable discharge power constraint condition or the maximum allowable charging power constraint condition, if there is an energy storage unit that violates the corresponding constraint condition, the energy storage unit is recalculated by the maximum allowable discharge power or the maximum allowable charging power. The power command value; otherwise, the end judgment.
  • the power command value and real-time data of each energy storage unit temporarily stored in the local monitoring module are uploaded to the central monitoring module in real time through a real-time communication network for storage and management, and stored in the local monitoring module.
  • the non-real-time data of each energy storage unit is uploaded to the central monitoring module for storage and management through a non-real-time monitoring communication network.
  • the monitoring system and method of the invention adopts a network connection of a real-time communication network and a non-real-time monitoring communication network, which satisfies the cluster real-time rapid control of the energy storage unit and the condition monitoring requirements of hundreds of thousands of energy storage batteries, and maximizes It reduces battery degradation and ensures healthy battery operation, making battery storage power station safer and more stable:
  • the monitoring system of the present invention calculates the relevant data of the battery energy storage power station through the central energy management module, and performs online monitoring and energy management through a multi-angle megawatt battery energy storage power station such as steady state and dynamic, thereby realizing integration.
  • Uniform access, real-time scheduling management and multi-layer coordinated active safety control of battery energy storage units in a scale battery energy storage power station system to solve the problem of coordinated control and energy management of battery energy storage power stations;
  • the monitoring system and method are applicable to a wide range of advanced functions of large-scale battery energy storage power stations that support smooth wind power output, tracking planned power generation, participating in system frequency modulation, peak clipping, and safety and stability control.
  • Figure i is a schematic diagram of system access of a multi-type lithium battery energy storage power station in the present invention.
  • FIG. 2 is a block diagram showing an embodiment of a monitoring system and method embodiment of a megawatt battery energy storage power plant of the present invention.
  • FIG 1 shows the system topology of the 4MW lithium battery energy storage power station deployed in the Zhangbei National Wind Energy Storage and Loss Demonstration Power Station.
  • the wind and light storage combined power generation system connected to the energy storage power station includes a wind farm, a photovoltaic farm, a battery energy storage power station, and Grid. Wind farms, photovoltaic farms and battery energy storage power stations are connected to the grid through transformers. The internal connection diagrams of the wind farm and the photovoltaic farm are omitted here.
  • the MMW lithium battery energy storage power station includes nine parallel lithium battery energy storage substations, and each battery energy storage substation is connected in parallel to a 35kV AC bus through a transformer.
  • Each lithium battery energy storage substation includes a plurality of parallel lithium battery energy storage units, each of which includes a bidirectional converter and a plurality of lithium ion battery packs, and the lithium ion battery can be executed by the bidirectional converter Group switching control and charge and discharge power commands.
  • Fig. 2 is a schematic structural view of the monitoring system of the lithium battery energy storage power station shown in Fig. 1 in the monitoring of Fig. 1.
  • the battery energy storage power station monitoring system in this example includes: a central monitoring module and a local monitoring module, and a communication network is used between the central monitoring module and the local monitoring module for data transmission and communication, and the communication network adopts real-time. Communication network and non-real-time monitoring communication network parallel network structure.
  • the module/3 ⁇ 4 determines the power command value of each energy storage substation in the power station and sends it to each local monitoring module in real time; in addition, the module also implements monitoring and processing, data communication, and all monitoring data in the energy storage power station. Operational supervision and other functions for energy storage power stations.
  • the central monitoring module mainly includes a central system supporting module, a central energy management module, a central storage module and a central communication module, wherein
  • IA a central system support module for reading data related to the battery energy storage power station and transmitting the data to the central storage module; the central system support module further comprising:
  • Central acquisition module used to read the relevant data of the battery energy storage station
  • Central timing module used to provide timing and frequency accuracy through hardware time ⁇ ;
  • Central interface unit Various interface functions required to provide battery storage power stations, in addition to basic application software packages, user programs and tool sets.
  • Central energy management module which can be configured with various advanced applications according to actual needs, used to calculate the total power demand of the battery energy storage station according to the specific application, and further determine the power command of each energy storage substation in the battery energy storage power station. Values are sent to the central storage module for energy management of the battery-storage power station and for a variety of specific applications for battery-storage power stations (multiple applications including smooth wind power output, tracking planned power generation, participation in system frequency modulation, cutting) Peak filling, safety and stability control, etc., and real-time status monitoring and early warning function for the entire energy storage power station through real-time information interaction.
  • the central energy management module further includes:
  • Smooth Wind Power Output Module Based on adaptive filtering technology and feedback control to stabilize wind power output fluctuations. That is, the feedback control of S0C and wind power generation volatility is introduced to smooth the wind power output fluctuation.
  • the smooth wind power output module calculates the total power demand of the battery energy storage power station required for the smooth wind power generation output fluctuation according to the current feedback S0C and the wind power generation fluctuation rate, and also calculates the current working capacity of the battery energy storage power station. While satisfying the demand of smooth wind power output, effectively control the volatility of S0C and wind power generation within the set range;
  • Tracking juice generation power generation module It is used to compensate the difference between the actual power of the wind and light storage combined power generation and the Fengguang storage power generation.
  • the tracking power generation module calculates the total power demand of the battery energy storage station required for the tracking plan in real time according to the current battery operating state and the remaining battery capacity feedback value, and also calculates the current working capacity of the battery energy storage electric cobalt:
  • Participate in the system FM module It is used to meet the system FM power command value corresponding to the AGC that is directly delivered by the external dispatch center (including the upper-layer scheduling and the North China network).
  • the participating system FM module calculates the total battery energy storage power station required for the system frequency modulation according to the information of the system FM power command value corresponding to the AGC, the current battery operating status and the battery residual capacity feedback value issued by the external dispatch center. Power demand, and also calculate the current working capacity of the battery energy storage power station;
  • Peak-cutting valley filling module It is used to meet the peak clipping and valley filling issued by the external dispatching center in real time! 3 ⁇ 4 Energy storage station power demand command. That is, the real-time response to the power command value corresponding to the peak-to-peak filling plan issued by the upper-level scheduling is to ensure the effect of peak-cutting and filling the valley.
  • the peak-cutting valley filling module calculates the total power demand of the battery energy storage power station required for peak-cutting and filling the valley according to the current battery operating state and the battery residual capacity feedback value, and also calculates the current active and reactive power of the battery energy storage power station.
  • Ability to work eg: current allowable capacity and currently available maximum charge and discharge capacity
  • Safety and stability control module According to the stability control command issued by the external dispatching center and its related energy storage total power demand, the safety and stability control module calculates the battery required for safe and stable control in real time according to the collected state information of each energy storage unit. The total power demand of the energy storage power station, and also calculate the current active and reactive working capacity of the battery energy storage power station (such as: the current allowable capacity and the currently available maximum charge and discharge capacity) to ensure the real-time power demand of the system and ensure energy storage. Normal, safe and reliable operation of the power station;
  • the real-time distribution module of the total power demand of the energy storage power station based on the total power demand of the battery energy storage power station directly calculated by any one of the above six modules or directly dispatched by the external dispatching center, and according to the current state information of each stored energy storage unit (such as battery operating conditions, current total energy storage capacity, current energy storage system maximum charge and discharge capacity, battery voltage, SOH and temperature, etc.), calculate the power command value of each energy storage substation in real time, and ensure the total power of the battery energy storage power station.
  • the current state information of each stored energy storage unit such as battery operating conditions, current total energy storage capacity, current energy storage system maximum charge and discharge capacity, battery voltage, SOH and temperature, etc.
  • Data processing module It is used to read the real-time data transmitted through the central real-time communication module, and transmit the corresponding data to the smooth wind power output module, the tracking plan power generation module, the participating system FM module, the peak-shaving valley module, and the security stability control.
  • the module or the energy storage station total power demand real-time allocation module is calculated, and then the calculated result is transmitted to the central real-time communication module for real-time communication, and also transmitted to the central storage module for unified storage and management.
  • Central storage module used to store and manage related data of battery energy storage power stations and each energy storage substation.
  • the relevant data of the battery storage power station and the power command value of each energy storage substation are stored, and the above data and power command values are assigned to corresponding interface variables for local monitoring module and external dispatch center to call.
  • a central communication module comprising a central real-time communication module and a central non-real-time communication module, wherein the central real-time communication module respectively performs real-time communication functions with the local monitoring module and the external dispatching center through the real-time communication network; the central non-real-time communication The module completes the non-real-time communication function with the local monitoring module and the external dispatching center through the non-real-time monitoring communication network.
  • Each local monitoring module is respectively used for monitoring a corresponding energy storage substation, and the module is used for calculating the power command value of each energy storage unit in the corresponding energy storage substation, and is sent to each energy storage unit in real time, and The power command value of each energy storage unit is uploaded to the central monitoring module for storage; in addition, the module performs real-time communication with each energy storage unit in the energy storage sub-division through the local real-time communication module to realize local processing data processing, in situ Monitoring, local power distribution between energy storage converters, local self-diagnosis and protection of energy storage equipment.
  • the local monitoring module further includes:
  • the local system support module reads the power command value of the corresponding energy storage substation in the battery energy storage power station and the real-time and non-real-time data of all the energy storage units in the energy storage substation, and sends the data to the local storage module;
  • the local system support module further includes:
  • Local acquisition module Real-time data for reading energy storage units - Local time-to-time module: Used to provide timing and frequency accuracy through hardware time stamping; and
  • the local interface unit: ⁇ is provided with various interface variables required for each energy storage unit in the energy storage substation under the jurisdiction of the local monitoring module, and includes basic software packages, user programs and tool groups.
  • a local energy management module configured to calculate a power command value of each energy storage unit in the energy storage substation under the local monitoring module, and send the power command value to the corresponding energy storage unit; The energy management of each energy storage unit in the substation, the diagnosis of the energy storage substation and the protection control functions.
  • 2C local storage module, 3 ⁇ 4 in the temporary storage energy storage sub-station power command value and power command value, real-time data, non-real-time data of all energy storage units in the energy storage sub-station; during the monitoring process, will be stored
  • the power limit value and real-time data of all energy storage units in the local storage module are transmitted to the central real-time communication module of the central monitoring module through the local real-time communication module, and the non-real-time data of all the energy storage units are passed through the local non-real time.
  • the module is uploaded to the central non-real-time communication and is uniformly stored and managed through the central storage module.
  • the power command value and real-time data of each energy storage unit can be transmitted through the central real communication module.
  • Non-real-time data of each energy storage unit is transmitted through a central non-real-time communication module.
  • Local communication module including local real-time communication module and local non-real-time communication module.
  • the local real-time communication module completes the real-time communication function between the central storage module and the energy storage units in the energy storage sub-station under the jurisdiction of the local monitoring module through the solid-line communication network; and the local non-real-time communication module passes the non-real-time monitoring communication network.
  • the non-real communication function between each energy storage unit in the energy storage substation under the jurisdiction of the central monitoring module and the local monitoring module is completed.
  • the monitoring method of the megawatt battery energy storage power station in this example includes the following steps:
  • Step A Read the relevant data of the battery energy storage power station through the central real-time and non-real-time communication module in the central monitoring module, and store and manage the above data through the central storage module in the central monitoring module;
  • Step B determining the total power demand of the battery energy storage power station in real time based on the central energy management module in the central monitoring module; Step (:, determining the power limit value of each energy storage substation in the battery energy storage power station based on the central energy management module in real time, And the power command value of each energy storage substation is sent to each local monitoring module in real time through a central real-time communication module;
  • Step D Calculating the power command value of each energy storage unit in the energy storage sub-station under the local monitoring module based on the local energy management module in the local monitoring module, and transmitting the power command value to each energy storage unit based on the local real-time communication module in real time: At the same time, the module calculates the current controllable state, state of charge, etc. of the energy storage substation under the jurisdiction:
  • Step E temporarily storing the real-time and non-real-time data of each energy storage unit and the power limit value of each energy storage unit calculated in step D, the current controllable state of the energy storage substation, and the state of charge, etc.
  • the real ff data and power command value 1 of each energy storage unit are transmitted to the central real-time communication module through the local real-time communication module, and the non-real-time energy storage units are non-real-time through the local non-real-time communication module.
  • Data is uploaded to the central non-real-time communication module, and unified storage and management in the central storage module Reason.
  • the corresponding information of the energy storage power station can be uploaded to the external dispatch center through the central real-time and non-real time communication module based on the communication protocol.
  • the central real-time communication module of step C and the local real-time communication module described in step D can communicate in real time through a real-time communication network based on EPA (Ethernet for Plant Automation) or PROFI ET real-time Ethernet communication protocol;
  • Step D The local real-time communication module and the real-time communication module of each energy storage unit communicate in real time through a real-time communication network based on EPA (Ethernet for Plant Aivtomatioii) or PROFINET real-time Ethernet communication protocol;
  • Step E The central non-real-time communication module communicates with the local non-real-time communication module through the monitoring communication network, and performs non-real-time communication based on the IEC104 communication protocol;
  • the real-time communication module and the external dispatching center adopt real-time.
  • Communication network real-time communication based on IEC104 communication protocol.
  • step A the central storage module stores and manages related data of the battery energy storage power station, that is, assigns relevant data of the battery energy storage power station to relevant interface variables according to a preset protocol for local monitoring.
  • the module and the Xifu dispatch center perform rn ⁇ &
  • the related data of the battery energy storage power station includes real-time data transmitted through a real-time communication network and non-real-time data transmitted through the monitoring communication network; the real-time data includes setting data, upper layer scheduling data, and scenery on the monitoring interface of the energy storage power station.
  • the power generation data and real-time data of all energy storage units, the non-real-time data includes non-real-time data of all energy storage units, wherein - the setting data on the monitoring interface of the energy storage power station includes the filter constant and the wind power generation fluctuation index value
  • the storage power station application mode setting value (for example, it can be set to 1: smooth wind power output mode, 2: tracking power generation plan application mode; 3: participation in system frequency modulation application mode, 4: peak clipping Valley application mode, 5: security stability control application mode) and so on.
  • the upper layer scheduling data includes any one of the following data: Tracking the i-throwing power generation curve value, the system load curve value (ie, the total system load), the peaking and valley filling curve value, the system frequency modulation power command value, and the total energy demand of the battery energy storage power station.
  • the wind power generation data includes any one of the following data: wind power generation smoothing target value, wind power generation volatility value, total wind power generation power value, wind power generation plan value; wind power generation wind power generation group active power, each wind turbine Working status, total power value of wind power generation, rated power of wind power generation, predicted power of wind power generation, etc., and active power of photovoltaic generator sets in photovoltaic power plants, working status of each photovoltaic generating unit, total power generation value of photovoltaic power generation, rated power of photovoltaic power generation, photovoltaic Power generation prediction power, etc.;
  • the real-time data of the energy storage unit includes any one of the following data: rated power, actual power value, and status information of the energy storage unit (eg, controllable state, working state, alarm state, protection state, tuning state, etc.), working mode Available charge capacity, available discharge capacity, maximum allowable charging power, maximum allowable discharge power, state of charge value, state of charge state, value of state of health, and actual total power of battery energy storage station (equal to the actual power of all energy storage units) The sum of the values)
  • the non-real-time data of the energy storage unit includes any one of the following data: voltage information, temperature information and non-real-time status information of each battery unit in the energy storage unit.
  • step B the total power demand command value of the battery energy storage power station can be obtained by any of the following methods - B1) Calculate the total power demand of the battery energy storage power station required for the current smooth wind power generation output fluctuation by the following formula:
  • Total light - total scenery Wherein said two, i3 ⁇ 4 wind power level of 3 ⁇ 4 smoothing target value; 3 ⁇ 4 of the total optical power value of the total wind power generation; ⁇ is the total electric power value of the total wind power: 3 ⁇ 4 V always a total power value PV: S is the complex variable; 7 filter, ⁇ ⁇ 2 ⁇ are the filter time constant values, and satisfy 7 ⁇ ⁇ ⁇ 2 ⁇ ⁇ 3 ; is the wind power generation volatility value; ⁇ is the volatility calculation time; ⁇ is the wind power generation filter rate index value, ⁇ Satisfying ⁇ ⁇ 2 / f , 3 ⁇ 4f , respectively, the maximum value and minimum value of the total power value of the wind power generation and the rated power of the wind power generation, which are the sum of the rated power of the wind power and the rated power of the photovoltaic power, calculated by the following formula;
  • the status value is ⁇ , the other value is o ;
  • the number of fan units 3 ⁇ 4£ is the rated power of the PV unit;
  • u is the controllable state of the PV unit ⁇ .
  • the status value is 1 and the other value is 0;
  • the wind power generation plan value at each time interval is determined;
  • the current total energy demand of the battery energy storage station is determined.
  • control period can be set according to the actual control requirements, such as seconds or 2 seconds; p ; s - mp ⁇ m iA were engraved fr Wo ⁇ next day inch [Theta] «hair movable scenery ij 1 + Ge value; Pii m -, 3 ⁇ 4 3 ⁇ 43 ⁇ 4 pools were filled to the maximum allowed energy storage power station, a discharge power; 3 ⁇ 4 of the total wind power Power value; is the total power value of photovoltaic power generation.
  • is updated in real time every other pair of scales; for the current system load curve value, it is updated in real time in the sampling period.
  • the total power demand of the battery energy storage power station is calculated in real time by the following formula - p total demand S.
  • step C the power command values of the energy storage substations in the battery energy storage station are obtained as follows: When the 3 ⁇ 4 calculated in step B is positive (i)
  • the controllable state of the energy storage substation ⁇ when the battery energy storage substation i is controllable, the state value is 1, other The value is o ; sc ⁇ i is the state of charge of the energy storage substation; for the energy storage substation / the discharge state value, ', s is the number of energy storage substations; is the total power demand of the battery energy storage station; Si is the power demand value of the energy storage substation; the maximum allowable discharge power for the energy storage substation ⁇ ; the maximum allowable charging power for the energy storage substation i; / Aft 3 ⁇ 4 is the maximum allowable discharge power of the energy storage unit k; i is the maximum allowable charging power of the energy storage unit k.
  • step C when calculating the current controllable state and the state of charge state of the energy storage substation under the jurisdiction: (1) calculating the current available state of the substation according to the current control state of each energy storage unit in the energy storage substation under the jurisdiction Control state: (2) Calculate the charged titanium state of the substation participating in power distribution according to the current controllable state of each energy storage unit in the energy storage substation under the jurisdiction and the current state of charge.
  • each energy storage substation is obtained by the following method:
  • step D the power command values of each energy storage unit in each energy storage substation are obtained by the following methods:
  • Step D1 When the power command value of the energy storage substation is positive, indicating that the energy storage substation will be in a discharged state, based on the state of charge (SOC) and maximum of each energy storage unit in the substation. Allowing the discharge power, calculating the power command value of each energy storage unit in the energy storage substation by the following steps;
  • DID calculates the decision variables of each energy storage unit based on genetic algorithm ⁇ :
  • (11a) Determine the number of individuals (chromosomes) in the population N, and the number of genes in each chromosome is the number of energy storage units L.
  • the selection operation for example, the roulette selection method can be used to select the winner, in which the individual's selection probability will be The fitness value is proportional. Then, the recombination and mutation operations are respectively performed based on the crossover probability and the mutation probability to obtain the offspring;
  • step D13 judging whether the power command value of each energy storage unit obtained in step D12 satisfies the maximum allowable discharge power constraint condition of the active energy of the following energy storage unit;
  • step D14 If there is an energy storage unit that violates the constraint condition (29), perform the following step D15, otherwise end;
  • Step D2 When the power command value of the energy storage substation is negative, indicating that the battery energy storage power station is in a charging state, based on the discharge state value and the maximum allowable charging power of each energy storage unit, the following steps are used: Power command value of each energy storage unit in the energy storage sub-gu
  • (21a) Determine the number of individuals (chromosomes) in the population N'
  • the number of genes in each chromosome is the number of energy storage units L.
  • step 21c determining whether the evolution algebraic counter value G is less than or equal to the maximum evolution algebra counter value G max , and whether each individual satisfies the following constraint: If both of the above determination conditions are satisfied, step 21c is performed, otherwise, jump to Step 21f; K ⁇ ) (3 ⁇ )
  • the selection operation is performed according to the principle of survival of the fittest, for example, the roulette selection method can be used to select the winner, in which the individual's selection probability will be adapted to The value is proportional. Then, the recombination and mutation operations are respectively performed based on the crossover probability and the mutation probability to obtain the offspring;
  • step D23 determining whether the power command value of each energy storage unit i obtained in step D22 satisfies the maximum allowable charging power constraint condition of the active energy of the following energy storage unit;
  • step D24 If there is an energy storage unit that violates the above constraint (35), perform the following step D25, otherwise end.
  • the maximum allowable charging ⁇ 3 ⁇ 4 (26) - (36) is the controllable state of the energy storage unit i, which is read by step A.
  • the maximum allowable discharge power value of the group; J is the maximum allowable charging power value of the i energy storage unit.
  • the invention has the functions of achieving centralized access of a large-scale battery energy storage power station system, coordinated control of multiple types of battery systems, state monitoring of various battery energy storage units, and real-time rapid output control.
  • the energy management system module in the energy storage power station monitoring system has a variety of energy storage battery power and energy management and application functions, such as real-time battery power distribution function in the energy storage power station, peak clipping and valley filling function, participation in system frequency modulation function, and tracking power generation plan.
  • the function, the smooth wind power output function and the safety and stability control function, etc. thereby realizing the predictability, controllability and schedulability of the energy storage power station system to increase the power generation of large-scale wind farms and photovoltaic power plants.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

一种兆瓦级电池储能电站的监控系统及其方法,系统包括中央监控模块和本地监控模块,两模块之间采用实时通信网络和非实时监测通信网络并行的通信网络结构进行通信与连接。方法包括以下步骤:通过通信网络读取电池储能电站的相关数据,并进行存储和管理;确定电池储能电站总功率需求;确定各储能子站的功率命令值,并下发给各本地监控模块;计算出储能子站中各储能机组的功率命令值,并下发给各储能机组;将本地监控模块中各储能机组的功率命令值、实时数据和非实时数据上传至中央监控模块统一存储和管理。该系统和方法能满足对储能机组集群式实时快速控制和大量传输数据的监测要求,保障了电池健康运行,使储能电站更安全稳定。

Description

一种兆瓦级电池储能电站的监控系统及其方法
技术领域
本发明属于智能电网以及能量存储与转换技术领域,具体涉及一种兆瓦级电池储能电站的监控系 统及其方法, 尤其适用于大规模电池储能电站并网系统的监控和管理。
背景技术
国家风光储输示范工程是国家电网公司建设坚强智能电网首批试点工程, 以 "电网友好型"新 能源发电为目标, 以 "先进性、 灵活性、示范性、经济性 "为特点, 是目前世界上规模最大、集风电、 光伏发电、 储能及输电工程四位一体的可再生能源综合示范工程。 其中, 国家风光储输示范工程 (一 期)拟建设风电 100 、光伏发电 40MW和储能装置 20MW (包含 14MW锂离子电池储能系统和 2厦液流电 池储能系统)。
随着电池及其集成技术的不断发展, 大规模分布式和集中式电池储能电站的应用模式将逐步成 为一种优选方案。大量储能电站在配电网末端投入使 ®,使储能设备的监控范围更广,监控要求更高, 必须有一个完善的、可扩充的、标准的信息平台来支撑配电网末端储能电站的实时监控与保护, 实现 准确、 真实、 及时的监测, 做出正确分析, 采取有效措施。
对比既往的传统电力监控系统和新能源发电系统的管理监控平台, 不难发现, 大规模电池储能 电站中由于大量电池的使 导致遥测、 遥信量急剧增加, 数据通信量非常庞大。 因此, 为了解决这 一在储能电站管理、 监控中出现的特殊问题, 必须研制拥有高速通信, 高可靠性, 大数据库容量, 高 速实时响应等技术特点的全新适用于配电网末端储能电站的综合控制方案及监控软硬件平台,为配电 网末端电池储能电站监控和保护提供全面、 有效的技术支撑。
储能电站监控系统在保证可靠稳定的前提下, 需满足配电网末端用户实时调度和管控的性能要 求, 高速响应电网各种应用场景对储能系统的需求, 这对监控系统平台的研发带来了巨大的挑战。 无论是在监控体系结构以及通信网络优化、硬件支撑系统开发、实时响应人机界面设计等方面, 都面 临相当多的问题和约束条件。
目前有关大规模多类型电泡储能电站的监控和并网运行方面的专利、 文献、 技术报告等非常少, 需要深入研究和探索。
发明内容
为克服现有技术的缺陷,本发明的目的之一在于提供一种更安全稳定的兆瓦级电池储能电站的监 控系统,该系统能够不仅满足对储能机组集群式实时快速控制和数十万传输数据的监测要求,还可以 最大限度的减小电池劣化, 保障电泡健康运行。
本发明的兆瓦级电池储能电站的监控系统是通过如下技术方案实现的:
一种兆瓦级电池储能电站的监控系统, 其包括:
中央监控模块, 用于确定电池储能电站中各储能子站的功率命令值并实时下发给各本地监控模 块:
本地监控模块, 每个本地监控模块分别管辖一个储能子站,其用于计算所管辖储能子站中各储能 机组的功率命令值、并实时下发给各储能机组, 以及将各储能机组的功率命令值丄传至中央监控模块 进行存储;
所述中央监控模块与本地监控模块之间采用通信网络进行数据传输与通信,所述通信网络采用实 时通信网络和非实时监测通信网络并行的网络结构。
其中,电池储能电站的相关数据包括通过实时通信网络传递的实时数据和通过监测通信网络传递 的非实时数据; 所述实时数据包括上层调度数据、风光发电数据和所有储能机组的实时数据, 所述非 实时数据包括所有储能机组的非实时数据, 具体地:
上层调度数据包括下述任一至全部数据: 跟踪计划发电曲线值、系统负荷曲线值、 削峰填谷曲线 值、系统调频功率命令值、 电池储能电站总功率需求、 电池储能电站负荷值和风光储联合发电总功率 值等;
风光发电数据包括下述任一至全部数据: 风光发电平滑目标值、风光发电波动率值、风光发电总 功率值、风光发电计划值; 风力发电厂中各风力发电机组有功功率、 各风力发电机组工作状态、 风力 发电总功率值、风力发电额定功率、风力发电预测功率等以及光伏发电厂中各光伏发电机组有功功率、 各光伏发电机组工作状态、 光伏发电总功率值、 光伏发电额定功率、 光伏发电预测功率等; 储能机组的实时数据包括下述任一至全部数据:储能机组的额定功率、实际功率值、状态信息(如; 可控信号、 工作状态、 告警状态、 保护状态、 整定状态等)、 工作模式、 可用充电容量、 ^用放电容 量、 最大允许充电功率、 最大允许放电功率、 荷电状态值、 放电状态值、 健康状态值和电池储能电站 实际总功率值 (等于所有储能机组实际功率值的总和) 等;
储能机组的非实时数据包括下述任一至全部数据:储能机组中各电池单体的电压信息、温度信息 和非实时状态信息等。
本发明的另一目的在于提出一种兆瓦级电池储能电站的监控方法, 其包括如下步骤:
步骤 A、 中央监控模块通过通信网络读取电池储能电站的相关数据, 并对上述数据进行存储和管 理, 所述通信网络采/ ¾实时通信网络和非实时监测通信网络并行的网络结构;
步骤 B、 基于中央监控模块确定电池储能电站总功率需求;
步骤 C、基于中央监控模块确定电池储能电站中各储能子站的功率命令值, 并下发给各本地监控 模块;
步骤 D、基于本地监控模块计算出该模块所管辖储能子站中各储能机组的功率命令值, 并下发给 各储能机组; 同时该模块中 if算所管辖储能子站的当前可控状态、 荷电状态等:
步骤 E、将翁时存储于本地监控模块中各储能机组的功率命令值、所管辖储能子站的当前可控状 态、 荷电状态、 实时数据和非实时数据通过通信网络上传至中央监控模块进行存储和管理。
所述步骤 A 中, 先通过通信网络读取电池储能电站的相关数据; 再对电池储能电站的相关数据 进行存储, 并将该相关数据赋值给相应接口变量。
所述步骤 B 中, 可以根据实际监控需要选择相应计算方法计算出或直接读取外部调度中心下发 的电池储能电站总功率需求。
所述步骤 C 中, 根据当前电池储能电站总功率需求的符号通过储能子站的可控信号、 电池储能 电站总功率需求以及储能子站的荷电状态值或放电状态值,实时计算出电池储能电站中各储能子站的 功率命令值。
所述步骤 D 中, 根据储能子站的功率命令值符号, 选择通过最大允许放电功率或最大允许充电 功率来计算各储能机组的决策变量,进而求取各储能机组的功率命令值; 并且判断各储能机组是否满 足最大允许放电功率约束条件或最大允许充电功率约束条件, 如果有违反相应约束条件的储能机组, 则通过最大允许放电功率或最大允许充电功率重新计算该储能机组的功率命令值; 否则, 结束判断。
所述步骤 E 中, 将临时存储于本地监控模块中的各储能机组的功率命令值和实时数据通过实时 通讯网络实时上传至中央监控模块中进行存储和管理,将临 存储于本地监控模块中的各储能机组的 非实时数据通过非实时监测通信网络上传至中央监控模块中进行存储和管理。
与现有技术相比, 本发明的有益效果是:
1 )本发明的监控系统和方法采用实时通信网络和非实时监测通信网络并存的网络结抅, 满足了 储能机组集群式实时快速控制以及数十万储能电池的状态监测要求,最大限度的减小了电池劣化,并 保障电池健康运行, 使电池储能电站更加安全稳定:
2)本发明的监控系统通过中央能量管理模块对电池储能电站的相关数据进行计算, 并且通过稳 态、动态等多角度兆瓦级电池储能电站进行在线监控与能量管理,实现集成化大规模电池储能电站系 统中各电池储能机组的统一接入、实时调度管理和多层协调的主动安全控制, 以解决电池储能电站协 调控制及能量管理的问题; 此夕卜, 由于本发明的监控系统和方法同 '支持平滑风光功率输出、跟踪计 划发电、 参与系统调频、 削峰填谷、 安全稳定控制等大规模电池储能电站的多种高级功能, 应用范围 广泛。
if图说明
图 i是本发明中多类型锂电池储能电站的系统接入示意图;
图 2是本发明的兆瓦级电池储能电站监控系统和方法实施例的实施框图。
具体实施方式
下面结合 ft图和具体实施例对本发明的监测系统及其监测方法作进一步的详细说明。
图 1所示为目前张北国家风光储输示范电站中配置的 4MW锂电池储能电站的系统拓 图。 如 图 1所示, 电泡储能电站接入的风光储联合发电系统包括风力发电场、 光伏发电场、 电池储能电站和 电网。风力发电场、光伏发电场及电池储能电站分别通过变压器与电网连接。风力发电场和光伏发电 场的内部连接示意图在此省略。 本例中, MMW锂电池储能电站包括 9个相并联的锂电池储能子站, 各电池储能子站通过一个变压器并联至 35kV的交流母线。每个锂电池储能子站中包括多个相并联的 锂电池储能机组,各储能机组中包括双向变流器和多个锂离子电池组,通过双向变流器可执行对锂离 子电池组的投切控制及充放电功率指令等。
图 2为/ B于监控图 1所示锂电池储能电站的监控系统的结构示意图。如图 2所示,本例中的电池 储能电站监控系统包括: 中央监控模块和本地监控模块, 中央监控模块与本地监控模块之间采用通信 网络进行数据传输与通信, 所述通信网络采用实时通信网络和非实时监测通信网络并行的网络结构。
(一) 中央监控模块
该模块 /¾于确定该电站中各储能子站的功率命令值并实时下发给各本地监控模块;此外,该模块 还 于实现储能电站内所有监控数据的监测和处理、 数据通信以及对储能电站进行运行监管等功能。 中央监控模块主要包括中央系统支撑模块、中央能量管理模块、中央存储模块和中央通讯模块,其中,
IA ) 中央系统支撑模块, 用于读取电池储能电站的相关数据, 并发送至中央存储模块; 该中央系 统支撑模块进一步包括:
中央采集模块: 用于读取电池储能电站的相关数据;
中央对时模块: 用于通过硬件时间戮来提供定时和频率准确度; 和
中央接口单元: 用于提供电池储能电站所需的各种接口函数, 此外, 还包括基本应用软件包、 用 户程序和工具组等。
IB) 中央能量管理模块, 该模块可根据实际需要配置多种高级应用, 用于根据具体应用实时计算 电池储能电站总功率需求,再进一步确定电池储能电站中各储能子站的功率命令值,并发送至中央存 储模块, 从而实现对电池储能电站进行能量管理, 以及实现电池储能电站的多种具体应用(多种应用 包括平滑风光功率出力、 跟踪计划发电、 参与系统调频、 削峰填谷、 安全稳定控制等), 并通过实时 信息交互实现对整个储能电站的实时状态监控及预警功能。 该中央能量管理模块进一步包括:
平滑风光功率出力模块: 基于自适应的滤波技术和反馈控制来平抑风光发电出力波动。 即引入 S0C和风光发电波动率的反馈控制去平滑风光功率输出波动。平滑风光功率出力模块根据当前反馈的 S0C和风光发电波动率来实时计算出平滑风光发电出力波动所需的电池储能电站总功率需求, 同时还 i十算出电池储能电站当前的工作能力, 以满足平滑风光功率输出需求的同时,有效控制 S0C和风光发 电波动率在设定范围内;
跟踪汁划发电模块: 用于实时补偿风光储联合发电实际功率与凤光储发电什划间的差值。跟踪什 划发电模块根据当前的电池运行状态与电池剩余容量反馈值,实时计算出跟踪计划所需的电池储能电 站总功率需求 , 同时还计算出电池储能电钴当前的工作能力:
参与系统调频模块: 用于实时满足外部调度中心 (包括上层调度和华北网调) 直接下发的支持 AGC相对应的系统调频功率命令值。参与系统调频模块根据外部调度中心下发的支持 AGC相对应的系 统调频功率命令值、当前的电池运行状态和电池剩余容量反馈值等信息, 实时计算出参与系统调频所 需的电池储能电站总功率需求, 同时还计算出电池储能电站当前的工作能力;
削峰填谷模块: 用于实时满足外部调度中心下发的削峰填谷! ¾储能电站功率需求命令。 即实时 响应上层调度下发的削峰填谷计划对应的功率命令值, 以保证削峰填谷的应^效果。削峰填谷模块根 据当前的电池运行状态与电池剩余容量反馈值, 实时计算出削峰填谷所需的电池储能电站总功率需 求, 同时还计算出电池储能电站当前有功和无功的工作能力(如: 当前允许使用容量和当前可用最大 充放电能力);
安全稳定控制模块:根据外部调度中心下发的安稳控制指令及其相关储能总功率需求,安全稳定 控制模块根据采集的当前各储能机组的状态信息,实时计算出安全稳定控制所需的电池储能电站总功 率需求, 同时还计算出电池储能电站当前有功和无功的工作能力(如: 当前允许使用容量和当前可用 最大充放电能力), 以保证系统的实时功率需求, 确保储能电站正常、 安全、 可靠的工作;
储能电站总功率需求实时分配模块:基于上述六大模块中任一模块计算出的或外部调度中心直接 下发的电池储能电站总功率需求, 并根据采集的当前各储能机组的状态信息(如电池运行状况, 当前 储能总容量, 当前储能系统最大充放电能力, 电池电压, SOH及温度等), 实时计算出各储能子站功 率命令值, 在保证电池储能电站总功率需求的同时, 并防止电泡的过充电或过放电; 和 数据处理模块: 用于读取通过中央实时通 ¾模块传递的实时数据,并将相应数据传至平滑风光功 率出力模块、跟踪计划发电模块、 参与系统调频模块、 削峰填谷模块、 安全稳定控制模块或储能电站 总功率需求实时分配模块中进行计算,然后将计算的结果传至中央实时通讯模块进行实时通信,还传 至中央存储模块中进行统一存储和管理。
IC)中央存储模块, 用于对电池储能电站的相关数据和各储能子站进行存储与管理。存储电池储 能电站的相关数据和各储能子站的功率命令值, 并且将上述数据和功率命令值赋值给相应接口变量, 以供本地监控模块和外部调度中心调用。
ID)中央通讯模块, 包括中央实时通讯模块和中央非实时通汛模块, 所述中央实时通讯模块通过 实时通信网络分别完成与本地监控模块和外部调度中心的实时通信功能;所述中央非实时通讯模块通 过非实时监测通信网络分别完成与本地监控模块和外部调度中心的非实时通信功能。
(二)本地监控模块
每个本地监控模块分别用于监控一个相对应的储能子站,该模块用于计算相应储能子站中各储能 机组的功率命令值、并实时下发给各储能机组, 以及将各储能机组的功率命令值上传至中央监控模块 进行存储; 此外, 该模块通过本地实时通讯模块与所管辖储能子姑中各储能机组进行实时通信, 实现 本地采集数据的处理, 就地监测, 本地各储能变流器间功率分配, 储能设备的本地自诊断与保护等功 能。 该本地监控模块进一步包括:
2A)本地系统支撑模块, ffl于读取电池储能电站中相应储能子站的功率命令值以及该储能子站中 所有储能机组的实时、 非实时数据, 并发至本地存储模块; 该本地系统支撑模块进一步包括:
本地采集模块: 用于读取储能机组的实时数据- 本地对时模块: 用于通过硬件时间戳来提供定时和频率准确度; 和
本地接口单元: ω于提供该本地监控模块所管辖的储能子站中各储能机组所需的各种接口变量, 此夕卜, 还包括基本应 软件包、 用户程序和工具组等。
2B)本地能量管理模块,用于计算该本地监控模块所管辖的储能子站中各储能机组的功率命令值, 并将功率命令值下发给相应的储能机组; 以实现对储能子站中各储能机组的能量管理、储能子站的诊 断以及保护控制等功能。
2C)本地存储模块, ¾于临时存储储能子站的功率命令值以及该储能子站中所有储能机组的功率 命令值、 实时数据、 非实时数据; 在监控过程中, 将临^存储于该本地存储模块中的所有储能机组的 功率侖令值和实时数据通过本地实时通 ¾模块传至中央监控模块的中央实时通讯模块,以及将所有储 能机组的非实时数据通过本地非实时通¾模块上传至中央非实时通讯,并通过中央存储模块中进行统 一存储和管理; 当外部调度中心需要调取时, 可通过中央实 通讯模块传输各储能机组的功率命令值 和实时数据且通过中央非实时通讯模块传输各储能机组的非实时数据。
2D)本地通 ¾模块, 包括本地实时通 ¾模块和本地非实时通 ¾模块。 其中, 本地实时通讯模块通 过实衬通信网络完成与中央监控模块以及本地监控模块所管辖的储能子站中各储能机组间的实时通 信功能;而本地非实时通讯模块通过非实时监测通信网络完成与中央监控模块以及本地监控模块所管 辖的储能子站中各储能机组间的非实 ^通信功能。
如图 2所示, 本例中所述兆瓦级电池储能电站的监控方法, 包括如下步骤:
步骤 A、通过中央监控模块中的中央实时、非实时通讯模块读取电池储能电站的相关数据, 并通 过中央监控模块中的中央存储模块对上述数据进行存储和管理;
步骤 B、 基于中央监控模块中的中央能量管理模块实时确定电池储能电站总功率需求; 步骤(:、基于中央能量管理模块实时确定电池储能电站中各储能子站的功率侖令值, 并通过中央 实时通讯模块将各储能子站的功率命令值实时下发至各本地监控模块;
步骤 D、基于本地监控模块中的本地能量管理模块计算出该本地监控模块所管辖储能子站中各储 能机组的功率命令值,并基于本地实时通讯模块实时下发给各储能机组: 同时该模块中计算所管辖储 能子站的当前可控状态、 荷电状态等:
步骤 E、将各储能机组的实时、非实时数据和步骤 D计算出的各储能机组的功率侖令值、所管辖 储能子站的当前可控状态、荷电状态等临时存储于本地监控模块中的本地存储模块中,然后通过本地 实时通讯模块将各储能机组的实 ff 数据和功率命令值 1传至中央实时通讯模块、通过本地非实时通讯 模块将各储能机组的非实时数据上传至中央非实时通讯模块, 并在中央存储模块进行统一存储和管 理。
当外部调度中心需要调取数据时, 可基于通信协议, 将储能电站的相应信息通过中央实时、非实 时通讯模块上传至外部调度中心。
上述各步骤之间进行数据交互时, 可以采用如下通信方式:
1 )步骤 C的中央实时通讯模块与步骤 D所述的本地实时通讯模块间可通过实时通信网络, 基于 EPA ( Ethernet for Plant Automation )或 PROFI ET实时以太网通信规约进行实时通信;
2) 步骤 D 的本地实时通讯模块与各储能机组的实时通讯模块间通过实时通信网络, 基于 EPA ( Ethernet for Plant Aivtomatioii )或 PROFINET实时以太网通信规约进行实时通信;
3 ) 步骤 E的中央非实时通讯模块与本地非实时通 ¾模块间通过监测通信网络, 基于 IEC104通 信规约进行非实时通信;
4) 当外部调度中心 (例如, 如图 2中所示的^光储联合调度中心和华北网调调度中心) 需要丛 中央监控模块中调取数据时, 通过中央通讯模块与外部调度中心采用实时通信网络, 基于 IEC104通 信规约进行实时通信。
在步骤 A中, 中央存储模块 于存储电池储能电站的相关数据, 并对其进行管理, 即: 将电池储 能电站的相关数据按事先设定的协议赋值给相关接口变量,以供本地监控模块以及夕卜部调度中心进行 r-n π &
所述电池储能电站的相关数据包括通过实时通信网络传递的实时数据和通过监测通信网络传递 的非实时数据; 所述实时数据包括储能电站监控界面上的设定数据、上层调度数据、风光发电数据和 所有储能机组的实时数据, 所述非实时数据包括所有储能机组的非实时数据, 其中- 储能电站监控界面上的设定数据包括滤波 ^间常数、风光发电波动率指标值、储能电站应用模式 设定值 (例如可设定为, 1: 平滑风光功率出力的应∞模式, 2: 跟踪发电计划的应用模式; 3: 参与 系统调频的应用模式、 4: 削峰填谷的应用模式、 5: 安全稳定控制的应用模式) 等。
上层调度数据包括下述任一至全部数据: 跟踪 i划发电曲线值、系统负荷曲线值(即为系统总负 荷)、 削峰填谷曲线值、 系统调频功率命令值、 电池储能电站总功率需求、 电池储能电站负荷值和风 光储联合发电总功率值等:
风光发电数据包括下述任一至全部数据: 风光发电平滑目标值、风光发电波动率值、风光发电总 功率值、风光发电计划值; 风力发电 Γ中各风力发电^组有功功率、 各风力发电机组工作状态、 风力 发电总功率值、风力发电额定功率、风力发电预测功率等以及光伏发电厂中各光伏发电机组有功功率、 各光伏发电机组工作状态、 光伏发电总功率值、 光伏发电额定功率、 光伏发电预测功率等;
储能机组的实时数据包括下述任一至全部数据:储能机组的额定功率、实际功率值、状态信息(如: 可控状态、 工作状态、 告警状态、 保护状态、 整定状态等)、 工作模式、 可用充电容量、 可用放电容 量、 最大允许充电功率、 最大允许放电功率、 荷电状态值、 敖电状态值、 徤康状态值和电池储能电站 实际总功率值 (等于所有储能机组实际功率值的总和) 等;
储能机组的非实时数据包括下述任一至全部数据:储能机组中各电池单体的电压信息、温度信息 和非实时状态信息等。
在歩骤 B中, 电池储能电站总功率需求命令值可通过如下任一方法获得- B1 ) 通过下式计算当前平滑风光发电出力波动所需的电池储能电站总功率需求:
— p目标 p ί Λ
—― 风光平滑 — 风光¾ 1.
且满足:
(2) AJ 总 " -光1 ίΛ总 (' )
Figure imgf000008_0001
(6)
最.1 置 „ j ίρ )
光总 ― 风光总 h
Figure imgf000008_0002
二述式中, i¾平 ¾为风光发电平滑目标值; ¾光总为风光发电总功率值; ^电总为风力发电总 功率值: ¾伏总为光伏发电总功率值: S为复变量; 7滤波、 Τ Τ2 ^均为滤波时间常数值, 且满 足7^ < Τ2 < Τ3 ; 为风光发电波动率值; Γ为波动率计算时间; 、 均为风光发电滤波率 指标值, ϋ满足 < δ2 / f 、 ¾f , 分别为 Γ时间内风光发电总功率值中的最大值、 最 小值和风光发电额定功率, 为风力发电额定功率与光伏发电额定功率之和,通过下式计算;
(8)
Figure imgf000008_0003
上式中, ¾£为风机机组 的额定功率; M 为风机机组/ 1的可控状态, 当该风机机组 λ可 控时, 此状态值为 ι, 其他值为 o; 为风机机组个数; ¾£为光伏机组 的额定功率; u條为 光伏机组 έ的可控状态, 当该光伏机组 Α可控时, 此状态值为 1 , 其他值为 0; 为光伏机组个数„
B2)根据当前各储能机组的电池运行状态与电池剩余容量反馈值, 实时计算出跟踪计划所需的 电池储能电站总功率需求:
首先, 基于风光发电 i划曲线 (该计划曲线是计算机根据各时刻下的风光发电计划值自动形成 的), 确定出每个时间间隔 (刻度) 下的风光发电计划值;
其次, 基于各时间刻度下的风光发电计划值, 确定当前风光储联合发电总功率值 ^风光储 f风光储 ― 风光储 (9)
p下一个时 ¾¾^ 值 p当前时 Si;H3iffl
¾光储 ― f风光 ¾ (10)
7;时间 ¾度
然后, 基于己 i十算出的/ ¾ , 确定当前电池储能电站总功率需求 储能
p'y.需求 ― "
f储能 ― (11) 最后, 基于下述方法对 f 进行判断和再修正:
/Π l¾ p总需求 、 《 曰 p总需求 、 p最大^许放电 [J|j| 总需求 ― p
' . 如果 _¾f*< 且 |i¾求 |>|¾ί允许充电 | , 则 ¾f*= ¾ 上述各式中, 为控制周期,可以根据实际控制需求来设定,例如 秒或 2秒; p;s - mp^m iA 分别为 fr日寸刻禾 ίΐ下一 Θ«動风光发 1十戈 ij值; Piim-、 ¾ ¾¾分别为 池储能电站的最大允许充、 放电功率; ¾ 为风力发电总功率值; 为光伏发电总功率值。
B3)根据外部调度中心下发的参与系统调频功率命令值、 当前各储能机组的电池运行状态与电 池剩余容量反馈值, 实时计算调频所需的电池储能电站总功率需求-
(1)当自动发电控制系统调频功率命令值 ^'为正值时,表示该电池储能电站将处于放电状态, 则基于当前电池储能电站的最大允许放电功率, 计算调频用电池储能电站总功率需求 i¾ 首先, 判断 赌能是否满足下列储能机组有功功率的最大允许放电功率约束条件;
pAGC <<· p最大允许放电
-f储储能能 储能 (12)
其次, 如果有违反约束条件 (12), 则令
p 需求 pft大允许放电
f*能 — 锗能 (iJ) 否则令 ¾f求 ^ ί (14) (2)当系统调频功率命令值/ ¾¾f为负值时, 表示该电池储能电站将处于充电状态, 则基于当前 电池储能电站的最大允许充电功率, 计算调频用电池储能电站总功率需求 : 首先, 判断 ¾ 是否满足下列储能机组有功功率的最大允许充电功率约束条件-
^能 < (15)
Figure imgf000009_0001
其次, 如果有违反约束条件 (15), 則令
p>总需求 _„ p最大允许充电
½能 储能
否则令 ff求 : = ¾f (17)
B4)根据当前各储能机组的电池运行状态、 电池剩余容量反馈值, 实时计算削峰填谷用电池储能 电站总功率需求:
首先, 基于削峰填谷曲线值 和系统负荷曲线值 i负荷, 并通过下式计算出每个时 间阆隔 (刻度) 下的电池储能电站当前总功率需求
p总需求 p 当前时刻肖峰填谷值 ...i e
储能 — 负荷 (lb)
然后, 基于下述方法进行判断和再修正-
-/1Γ! |¾ ρ总需求 、、 p p总 求 .、 p最大 ^许放电 > 需求 _ p最大允许放电 -(
储能 ( ^½能 储能 , 则 ½能 — ½能 ; ! 最大允许充电 总需求 D最大允许充电
如果 ff* <0且 储能 能 储能 式 (18)中, ^^^^是每隔一个对间刻度实时更新的; 为当前系统负荷曲线值, 是以 采样周期实时更新的。
B5) 根据当前各储能机组的状态信息, 通过下式实时计算电池储能电站总功率需求- p总需求 S.
ftt能 ― ^能 (19)
B6)直接读取外部调度中心下发的电池储能电站总功率需求。
在步骤 C中, 电池储能电站中各储能子站的功率命令值 通过如下方法获得: 当步骤 B中计算的 ¾ 为正值时 i (20)
∑i^-Titiiso ms) 如果有任何- ί的功率需求值 满足条件 > 且^^ > ,则基于下式 重新确定 :
, ρ·最大允许放电
子站 ί 站 ΐ (2-1)
储能
最大: fc许放电
予站^子站
(22)
Figure imgf000010_0001
当歩骤 Β中计算的.^ 为负值时
.... "于站 子站 (23)
∑ (^站 ' 子站 i 如果有任何一个子站 /的功率需求值 满足条件/^ ^ <0且 |/^| > |/¾^ 卜 则基于下式 重新确定
p最大允许充电
1% 子站 子站 ΐ (24)
i "' s , 储能
L p最大允许充电 )
Ζ^Ψ ί ρ最
f子 (25)
Figure imgf000010_0002
上述各式中, 为储能子站 ί的可控状态, 当该电池储能子站 i可控时, 此状态值为 1, 其他 值为 o; s c÷ i为储能子站 的荷电状态值; 为储能子站 /的放电状态值, '、 s为储能子站个数; 为电池储能电站总功率需求; / Si为储能子站 /的功率需求值; 为储能子站 ί的最大允许放电功率; 为储能子站 i的最大允许充电功率; / Aft ¾为储能 机组 k的最大允许放电功率; i 为储能机组 k的最大允许充电功率。
步骤 C中, 计算所管辖储能子站的当前可控状态、 荷电状态值时: (1 )根据所管辖储能子站中各 储能机组的当前 ^控状态计算该子站的当前可控状态: (2)根据所管辖储能子站中各储能机组的当前 可控状态、 当前荷电状态计算该子站参与功率分配的荷电钛态。
具体地, 各储能子站中的当前可控 iv钛态、 荷电状态等值通过下述方法获得:
1)关于 ί '子站 内的任何一个储能机组 可控时, ;二 1, 否则《 ¾ 0;
2)例如关于 soc.^t ; = I , z为一个子站 中储能机组个数; ¾ 子站 /中的储能机组 的可控状态, 当该储能机组 έ可控时, 此状态值为 1, 其他值为 0。
在步骤 D中, 各储能子站中各储能机组功率命令值通过下述方法获得:
步骤 Dl、 当储能子站 的功率命令值 为正值时, 表示该储能子站将处于放电状态, 则基于 子站中各储能机组的荷电状态 (State of Charge: SOC)和最大允许放电功率, 通过下列歩骤计算储能 子站 中各储能机组的功率命令值 ;
DID基于遗传算法计算出各储能机组的决策变量 ^:
( 11a)确定群体中的个体 (染色体) 个数 N, 每个染色体中的基因个数为储能机组个数 L。 对 每个个体进行二进制编码(编码成一个向量, 即染色体, 向量每个元素为基因, 相应基因值将对应每 个储能机组是否参与本次功率分配的决策值 X U-Ι,, , , Ϊ), 随机生成 Ν个个体作为初始群体, 得到 各染色体中的基因串的 0、 1组合方式; 并令进化代数计数器值 0=0:
( l ib)判断进化代数计数器值 G是否小于等于最大进化代数 i数器值 Gma% 且每个个体是否满 足下式约束条件: 如果上述两个判断条件均满足, 执行步骤 lie, 否则, 跳转至步骤 iif
y ( x u P.最大允许放电、— p总需求 > 0 (26)
( 11c)基于下式计算每个个体 έ所对应的适应值 , 按 的大小评价其适应度; 最大允许放电 总需求
S„ -n
(k=== ....„N) (27)
( l id) 基于歩骤 l ie计算得出的适应度值, 按照优胜劣汰的原理进行选择操作, 例如可采 轮 盘赌选择法选择出优胜的个体, 在该方法中, 个体的选择概率将与其适应度值成比例。然后基于交叉 概率和变异概率分别进行重组和变异操作后得到子代;
( l ie) 基于下述目标函数 选择出最优子代, 并将其按照一定插入概率重新插入到种群中进行 替代操作; 商后令 OG+1 , 返回到步骤 ilb;
Figure imgf000012_0001
( l lf)计算满足目标函数 (1)的最优解 对最优解对应的个体经过解码得出其基因串排列组合方式, 每个基因值为与之对应的储能机组 ί的决策变量值 χ; ( /==! ,.
D12) i 算各储能机组 i的功率命令值 ; ~-—■■—: :— ί _子 i占 (28)
D13 )判断歩骤 D12得出的各储能机组 的功率命令值 是否满足下列储能机组有功功率的最大 允许放电功率约束条件;
η < 大允许放电 (29')
D14) 如果有违反约束条件 (29)的储能机组, 执行下列步骤 D15 , 否则结束;
D15 ) 基于下式, 重新确定各储能机组的功率命令值
,最大允许放电
E f站 (30)
最大允许放电
i—1
步骤 D2、 当储能子站 的功率命令值 为负值时, 表示该电池储能电站将处于充电状态, 则 基于各储能机组的放电状态值和最大允许充电功率,通过下列步骤] +算储能子姑 中各储能机组的功 率命令值 -
D21 )基千遗传算法计算 m各储能机组的决策变量 c :
(21a )确定群体中的个体 (染色体) 个数 N' 每个染色体中的基因个数为储能机组个数 L。 对 每个个体进行二进制编码(编码成一个向量, 即染色体, 向量每个元素为基因, 相应基因值将对应每 个储能机组是否参与本次功率分配的决策值 C =:! ,., 随机生成 N个个体作为初始群体, 得到 各染色体中的基因串的 0、 i组合方式; 并令进化代数计数器值 G=0;
(21 b)判断进化代数计数器值 G是否小于等于最大进化代数计数器值 Gmax, 且每个个体是否满 足下式约束条件: 如果上述两个判断条件均满足, 执行步骤 21c, 否则, 跳转至步骤 21f;
Figure imgf000012_0002
K 求 ί) (3 ί)
(21c)基于下式 i†算每个个体 所对应的适应值 , 按&的大小评价其适应度 电) j3总需求
m1 ——锂 (32)
=1 (k=l,...,N)
(21d)基于步骤 21c i†算得出的适应度值, 按照优胜劣汰的原理进行选择操作, 例如可采用轮 盘赌选择法选择出优胜的个体, 在该方法中, 个体的选择概率将与其适应度值成比例。然后基于交叉 概率和变异概率分别进行重组和变异操作后得到子代;
(21e)基于下述目标函数 (II)选择出最优子代, 并将其按照一定插入概率重新插入到种群中进行 替代操作; 而后令 G=G+i, 返回到步骤 21b;
最大允许 电
min f(x, , χ2, · · ·, · ; ~ min (II)
Figure imgf000013_0001
(21f) 计算满足目标函数 (II)的最优解, 对最优解对应的个体经过解码得出其基因串排列组合方 每个基因值为与之对应的储能机组 ί的决策变量值 ,
Figure imgf000013_0002
D22) ΐί·算参与跟踪计划的各储能机组 的功率命令值 /
Figure imgf000013_0003
SOD. - i - SOC, (34)
D23 )判断步骤 D22得出的各储能机组 i的功率命令值 是否满足下列储能机组有功功率的最大 允许充电功率约束条件;
s最大允许充电
< \P —'— \ (35)
D24) 如果有违反上述约束条件 (35)的储能机组, 执行下列步骤 D25 , 否则结束。
D25 )基千下式, 重新确定各储能机组的功率命令值
>最大允许充电
~~ P: Ϊ^·站^ (36)
最大允许充电 ι¾ (26) - (36) 中, 为 i号储能机组的可控状态, 该状态通过步骤 A读取, 当该储能机组 1 可控时, 此状态值为; U 其他值为 0 ; ;为0- 1决策变量, xf = ^时表示将储能机组 f参与功率分配 算, _^ = 时则表示不参与本次功率分配; SOC,为 号储能机组的荷电状态值; SOD,为 号储能机组 的放电状态值; L为电池储能机组个数; 为 号储能机组的額定功率; 为 i号储能机 组的最大允许放电功率值; J 为 i号储能机组的最大允许充电功率值。
综上所述, 本发明具有可实现大规模电池储能电站系统集中接入、 多类型电池系统的协调控制、 各类电池储能机组的状态监测与实时快速出力控制等功能。储能电站监控系统中的能量管理系统模块 具备多种储能电池功率和能量管理以及应用功能,例如储能电站内电池功率实时分配功能、削峰填谷 功能、 参与系统调频功能、跟踪发电计划功能、平滑风光功率出力功能和安全稳定控制功能等, 从而 实现了储能电站系统提高大规模风电场和光伏电站发电的可预测性、 可控性及可调度性。 最后应该说明的是: 以上实施例仅用以说明本发明的技术方案而非对其限制, 结合上述实施例对 本发明进行了详细说明, 所属领域的普通技术人员应当理解到;本领域技术人员依然可以对本发明的 具体实施方式进行修改或者等同替换, 但这些修改或变更均在申请待批的权利要求保护范围之中。

Claims

权 利 要 求
1、 一种兆瓦级电池储能电站的监控系统, 其特征在于, 该监控系统包括:
中央监控模块, 用于确定电池锗能电站中各储能子站的功率命令值, 并下发给各本地监 控模块;
本地监控模块, 用于 t算该模块所管辖的储能子站中各储能机组的功率命令值, 并下发 给各储能机组, 以及将各储能机组的功率命令值上传至中央监控模块进行存储;
所述中央监控模块与本地监控模块之间采用通信网络进行数据传输与通信, 所述通信网 络采用实时通信网络和非实时监测通信网络并行的网络结构。
2、 如权利要求 i所述的监控系统, 其特征在于, 所述中央监控模块包括:
中央系统支撑模块, 用于读取电池储能电站的相关数据, 并发送至中央存储模块; 中央能量管理模块, 用于根据具体应用实时计算电池储能电站总功率需求, 从而进一步 确定该电站中各储能子站的功率命令值, 并发送至中央存储模块和中央实时通讯模块; 中央存储模块, 用于存储电池储能电站的相关数据和各储能子站的功率命令值, 并且将 上述数据和功率命令值赋值给相应接口变量, 以供本地监控模块和外部调度中心调用; 和 中央通讯模块, 包括中央实时通讯模块和中央非实时通讯模块, 所述中央实时通讯模块 通过实时通信网络分别与本地监控模块和外部调度中心进行实^通信; 所述中央非实时通 ΪΗ 模块通过非实时监测通信网络与本地监控模块和外部调度中心进行非实时通信。
3、 如权利要求 2所述的监控系统, 其特征在于, 所述中央能量管理模块包括: 平滑风光功率出力模块, 用于实时计算出平滑风光发电出力波动所需的电池储能电站总 功率需求;
跟踪计划发电模块, ∞于实时计算处跟踪计划所需的电池储能电站总功率需求; 参与系统调频模块, i¾于实时计算出调频所需的电池储能电站总功率需求;
削峰填谷模块, 用于实时计算出削峰填谷所需的电池储能电站总功率需求;
安全稳定控制模块, 用于实时计算出安全稳定控制所需的电池储能电站总功率需求; 储能电站总功率需求实时分配模块, 用于根据上述任一模块所计算出的或外部调度中心 直接下发的电池储能电站总功率需求, 实时计算储能电站中各储能子站的功率命令值; 和 数据处理模块, 用于读取通过中央实时通讯模块传递的实时数据, 并将相应数据传至平 滑风光功率出力模块、 跟踪计划发电模块、 参与系统调频模块、 削峰填谷模块、 安全稳定控 制模块或储能电站总功率需求实时分配模块中进行计算, 然后将计算的结果传至中央实时通
Ϊ模块和中央存储模块。
4、 如权利要求 i所述的监控系统, 其特征在于, 所述本地监控模块包括:
本地系统支撑模块, 用于读取电池储能电站中相应储能子站的功率命令值以及该储能子 站中所有储能机组的实时、 非实时数据, 并发至本地存储模块:
本地能量管理模块, 用于计算储能子站中所有储能机组的功率命令值, 并将功率命令值 下发给相应的储能机组;
本地存储模块, 用于临时存储储能子站的功率命令值以及该储能子站中所有储能机组的 功率命令值、 实时数据、 非实时数据: 并且将临时存储于该模块中的所有储能机组的功率命 令值和实时数据通过本地实时通讯模块传至中央监控模块中进行存储; 和
本地通讯模块, 包括本地实时通讯模块和本地非实时通讯模块, 所述本地实时通讯模块 通过实时通信网络分别与中央监控模块和所有储能机组进行实 通信, 所述本地非实时通 ¾ 模块通过非实时监测通信网络分别与中央监控模块和所有储能机组进行非实时通信。
5、 一种兆瓦级电池储能电站的监控方法, 其包括如下步骤:
步骤 Α、 中央监控模块通过通信网络读取电池储能电站的相关数据, 并对上述数据进行 存储和管理, 所述通信网络采/ Β实时通信网络和非实时监测通信网络并行的网络结构; 步骤 Β、 基于中央监控模块确定电池储能电站总功率需求; 步骤 c、 基于中央监控模块确定电池储能电站中各储能子站的功率命令值, 并下发给各 本地监控模块:
步骤 D、 基于本地监控模块计算出该模块所管辖储能子站中各储能机组的功率命令值, 并下发给各储能 il组;
步骤 Ε、 将临时存储于本地监控模块中各储能机组的功率命令值、 实时数据和非实时数 据通过通信网络上传至中央监控模块进行存储和管理。
6、 如权利要求 5所述的监控方法, 其特征在于, 在步骤 Β Φ , 通过如下任一方法确定 所述电池储能电站总功率需求:
B1 ) 实时读取风光发电平滑目标值和风光发电总功率值, 前者减去后者的差值即为当前 平滑风光发电出力波动所需的电池储能电站总功率需求;
Β2) 实^读取各日 Τ刻的风光发电计划值, 并确定当前风光储联合发电总功率值, 从风光 储联合发电总功率值中减去风力发电总功率值和光伏发电总功率值, 所得值再进行判断和再 修正, 得到当前跟踪计划所需的电池储能电站总功率需求:
Β3 ) 读取参与系统调频功率命令值- , 根据 的符号判断其是否满足最大允许放 电功率约束条件或最大允许充电功率约束条件; 如果违反了约束条件, 则将电池储能电站的 最大允许放电功率或最大允许充电功率作为调频所需的电池储能电站总功率需求; 否则, 将 作为参与系统调频所需的电池储能电站总功率需求;
B4) 实日 T读取当前时刻的削峰填谷曲线值和系统负荷曲线值, 对前者减去后者的差值进 行判断和再修正, 得到当前削峰填谷所需的电池储能电站总功率需求;
B5 ) 将电池储能电站的最大允许放电功率作为安全稳定控制所需的电池储能电站总功率 需求;
B6) 实时读取外部调度中心直接下发的电池储能电站总功率需求。
7、 如权利要求 6所述的监控方法, 其特征在于,
在步骤 M中, 通过下式求取平滑风光发电出力波动所需的电池储能电站总功率需求:
Γ>总 求 r>
储能 ― 光平滑 _ 风光总 且满足:
Figure imgf000016_0001
P 风电总 伏总
δ2
^波动率
Figure imgf000016_0002
风. Max 最小值
¾ ΐ Min 二述式中, 平滑为风光发电平滑目标值: P, 为风光发电总功率值; 电总为风力 发电总功率值; 总为光伏发电总功率值: T}、 Τ2、 ! 均为滤波时间常数值, 且 满足 7) <Τ23, 波率为风光发电波动率值; s为复变量: 为波动率计算时间; δ 、 ^均为风光发电滤波率指标值, 且满足 A < δ?,
Figure imgf000017_0001
、 p»f, 分别为 ΓίΙί间内风 光发电总功率值中的最大值、 最小值和风光发电额定功率, 该额定功率为风力发电额定功率 与光伏发电额定: ? 通过下式计算
' Ή
Figure imgf000017_0002
'风 ρ ,
风电 V η ≠
'光伏 光伏 丄述式中, ¾¾为风机机组 的额定功率; 为风机机组 的可控状态, 当该风机机组 可控时, 此状态值为 1, 其他值为 0; 为风机 M组个数; ¾¾为光伏机组 A的额定功率; 为光伏机组 的可控状态, 当该光伏机组 可控时, 此状态值为 1, 其他值为 0; V为 光伏机组个数。
在步骤 Β2中, 求取跟踪计划所需的电池储能电站总功率需求的具体歩骤包括: 首先, 读取各时刻的风光发电计划值, 并通过下式确定当前风光储联合发电总功率值- ρ当前时刻 i†划值 下一个时刻计划疸 p当 SiSi刻计划值
( 风光储. ― 风光储.
7时 1¾刻度 其次, 读取当前风力发电机组的风力发电总功率值 和光伏发电杭组的光伏发电总 功率值 总 '并通过下式确定当前电池储能电站总功率需求 · - /¾r::: 伏总 最后, 通过下述方法对 ¾? 进行判断和再修正, 以获得最终的跟踪计划所需的电池储能 ί率需求;
;总需求
如果 ¾储能求 >0且 f储f能 >Pi储能
Figure imgf000017_0003
总需求 允卉充电
如果 储能 <0且 :憾 能 则 a总需求 最大
能 储能
— t 当前时刻计划值 ^ 述式中, /^^^为风光储联合发电总功率值; /!/为控制周期; P风,光储 p£:i -是分别为当前时刻和下一时刻的风光发电计划值; ΡΙΪΑ™、 分另 I 为电池储能电站的最大允许充、 放电功率;
在步骤 B3中, 求取调频所需的电池储能电站总功率需求的具体步骤包括:
AGC
实^读取参与系统调频功率侖令值 储能 : 当/ 为正值时, 表示该电池储能电站将处于放电状态, 则判断^i是否满足下列储 能机组的最大允许放电功率约束条件: /¾ ≤ p§im 如有违反最大允许放电功率约束条件的, 令/¾ * = _ ^ ; 否则, 令 Sf*= ; ¾ ¾ 为负值时, 表示该电池储能电站将处于充电状态, 贝 "J判断 是否满足下列储 能机组的最大允许放电功率约束条件: '-d储a能 ~ ί Sι:能 如有违反最大允许充电功率约束条件的, 令 f* = ;否则, 令 ^l^^^ ; 在步骤 B4中, 求取削峰填谷所需的电池储能电站总功率需求的具体歩骤包括: 首先, 实时读取当前时刻的削峰填谷曲线值和系统负荷曲线值, 并通过下式确定出当前 时刻的储能电站总功率需求¾J*: i¾f求 = / 当綱-媚峰填谷值 其次, 通过下述方法对 ff54进行判断和再修正, 以获得最终的削峰填谷所需的电池储 能电站总功率需求- rriM p总需求 、 /} H p总需求 、 p最大允许放电 p总需求 ― p最大允许放电 jiiM p总需求 曰 I p总需求 I、 I p最大允许充电 I i p总需求― p最大允许充电 · 上述式中, P 、 P 1^^^^分别为系统负荷曲线值和削峰填谷曲线值; 在步骤 B5 中, 将电池储能电站的最大允许放电功率作为安全稳定控制所需的电池储能 电站总功率需求;
在步骤 B6中, 直接读取外部调度中心下发的电池储能电站总功率需求。
8、 如权利要求 6所述的监控方法, 其特征在于, 在步骤 C ÷, 实时确定所述电池储能 电站中各储能子站的功率命令值的具体方法包括:
当电池储能电站总功率需求为正值时, 各储能子站的功率命令值 ί^ ί为- ρ .... "子站 ^0(: '子' p m
J子站 ί -- —^ ^ffi能求
∑(^Pt6iSOC_ i ) 如果有任何一个子站 i的功率需求值 fii;满足条件 > 且 > ¾ 则 基于下式重新确定
Figure imgf000018_0001
L
最大 最大允许放电 当电池储能电站总功率需求为负值时, 各储能子站的功率命令值^^为 如果有任何一个
Figure imgf000019_0001
子站 的功率需求值 满足条件 子站 <οϊί]ρ ¾
子. 最大兌^充 站 ί 子站; 于下式重新确定 子站 ;
大免许充电
p总需求
子姑 ■""?" 储能
L P最大允许充电)
子站 ^子站 } ρ最大允许充电 — p最大允许充电
子站 ^ ^ 上述各式中, 为储能子站 的可控状态; ^)C_ 为储能子站 的荷电状态值; SOD^ 为储能子站 的放电状态值, SOD^ ^l-SOC^- S为储能子站个数; ¾|*为电池储能电站 总功率需求; /¾5;为储能子站 /的功率需求值; 为储能子站 的最大允许放电功率: 为储能子站 的最大允许充电功率; / ί ¾为储能机组 k的最大允许放电功率; f *fti^¾为储能机组 k的最大允许充电功率。
9、 如权利要求 6所述的监控方法, 其特征在于, 在步骤 D中, 计算储能子站中所有储 能 il组的功率命令值的具体方法包括: 根据储能子站的功率命令值符号, 选择通过最大允许 放电功率或最大允许充电功率来计算各储能机组的决策变量, 进而求取各储能机组的功率命 令值: 并且判断各储能机组是否满足最大允许放电功率约束条件或最大允许充电功率约束条 件, 如果有违反相应约束条件的储能机组, 则通过最大允许放电功率或最大允许充电功率重 新计算该储能机组的功率命令值; 否则, 结束判断。
10、 如权利要求 9所述的监控方法, 其特征在于, 所述步骤 D的具体方法包括- 步骤 Dl、当储能子站 的功率侖令值 为正值时,计算该储能子站中各储能 组功率 命令值的方法包括-
DID 通过遗传算法计算出各储能机组的决策变量 ;
D12) 通过下式计算各储能机组 f 的功率命令值 ? : p ... ^S C,
D13)判断步骤 D2得出的各储能 il组 ί的功率侖令值 ^是否满足下列储能 il组有功功率 的最大允许放电功率约束条件: < ^™¾¾
D14) 如果有违反最大允许放电功率约束条件的储能机组, 则通过下式重新确定各储能 机组 的功率命令值 ; 否则结束判断;
Figure imgf000020_0001
步骤 D2、当储能子站/的功率命令值 为负值时,计算该储能子站中各储能机组功率 命令值的方法包括:
D21) 通过遗传算法计算出各储能机组的决策变量 x;
D22)通过下式 it算参与跟踪计划的各储能机组 f 的功率命令值: X,M,SOD
D23) 判断步骤 D22得出的各储能机组 i的功率命令值是否满足下列电池储能 组有功 功率的最大允许充电功率约束条件: ^ μ I
D24) 如果有违反最大允许充电功率约束条件的储能机组, 则通过下式重新确定各储能
„ p最大允许充电
机组 的功率命令值 ; 否则, 结束判断: P ::: " P:子站;
最大允许充电 上述式中, ^为 /号储能机组的可控信号; 其他值为 0; ^为0- 1决策变量: SOC,、 SOD, 分别为 /号储能机组的荷电、 放电状态, SOD, ^i-SOQ 为电池储能机组个数; 1^^为 号储能机组的额定功率; Pa it™ , ^^^^为^号储能机组的最大允许充、放电功率。
1 如权利要求 10所述的方法, 其特征在于,
所述步骤 D11中计算各储能机组的决策变量 法包括:
(11a)确定群体中的个体个数 N, 每个个体中的基因个数为储能机组个数 L, 对每- 体进行二进制编码, 随机生成 N个个体作为初始群体, 得到各个体中基因串的 0、 i组合方 式, 并令进化代数计数器值 G=0;
(lib) 判断进化代数计数器值 G是否小于等于最大进化代数计数器值 Graax, 且每个个 体是否满足下式的约束条件: 抝果上述两个判断条件均满足, 则执行步骤 】lc; 否则, 跳转 至步骤】
x u 最 X允许放电 )— 总需求 > 0
(lie)基于下式计算每个个体 k所对应的适应度值 ;
, 其中 k:4 ,Ν
Figure imgf000020_0002
(lid)基于步骤 11c计算得出的适应度值, 按照优胜劣汰原理进行选择操作, 然后基于 交叉概率和变异概率分别进行重组和变异操作后得到子代;
(lie)基于下述目标函数 选择出最优子代, 并将其按照插入概率重新插入到种群中进 行替代操作; 然后令 G=G+i , 跳转至步骤 l lb;
L
最大允许放电
mm χ? ! · · ·, xL } ~ min < ufl (I)
> 0
Figure imgf000021_0001
( llf)计算满足目标函数 (I)的最优解, 对最优解对应的个体进行解码后得出其基因串的 方式, 每个基因值即为与之对应的储能杭组 /的决策变量值 ,, 其中 =1,…… ; 所述步骤 D21 中计算各储能机组的决策变量 ;的方法包括-
(21a)确定群体中的个体个数 N, 每个个体中的基因个数为储能机组个数 L, 对每个个 体进行二进制编码, 随机生成 N个个体作为初始群体, 得到各个体中基因串的 0、 1组合方 式, 并令进化代数计数器值 G ):
(21b) 判断进化代数计数器值 G是否小于等于最大进化代数计数器值 Graax, 且每个个 体是否满足下式的约束条件: 如果上述两个判断条件均满足, 则 ¾行步骤 2ic; 否则, 跳转 至步骤 21f;
最大 t 充电 总需求 > 0
(21c) 基于下式计算每 的适应度值 St ; ; ^最大允许充电
, 其中 k=
(21 d)基于步骤 21c计算得出的适应度值, 按照优胜劣汰原理进行选择操作, 然后基于 交叉概率和变异概率分別进行重组和变异操作后得到子代:
(21e) 基于下述目标函数 (II)选择出最优子代, 并将其按照插入概率重新插入到种群中 进行替代操作; =G+1, 跳转至
Figure imgf000021_0002
(21f) 计算满足目标函数 (Π)的最优解, 对最优解对应的个体进行解码后得出其基因库 的排列组合方式, 每个基因值即为与之对应的储能机组 i的决策变量值 x;, 其中 /=1,»»—,£。
PCT/CN2013/085410 2013-10-17 2013-10-17 一种兆瓦级电池储能电站的监控系统及其方法 WO2015054869A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US14/123,518 US9660450B2 (en) 2013-10-17 2013-10-17 Monitoring system and method for megawatt level battery energy storage power plant
PCT/CN2013/085410 WO2015054869A1 (zh) 2013-10-17 2013-10-17 一种兆瓦级电池储能电站的监控系统及其方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2013/085410 WO2015054869A1 (zh) 2013-10-17 2013-10-17 一种兆瓦级电池储能电站的监控系统及其方法

Publications (1)

Publication Number Publication Date
WO2015054869A1 true WO2015054869A1 (zh) 2015-04-23

Family

ID=52827573

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2013/085410 WO2015054869A1 (zh) 2013-10-17 2013-10-17 一种兆瓦级电池储能电站的监控系统及其方法

Country Status (2)

Country Link
US (1) US9660450B2 (zh)
WO (1) WO2015054869A1 (zh)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109743387A (zh) * 2018-12-29 2019-05-10 江苏金派克新能源有限公司 锂电池组装车间安全监测统一管理系统
CN110011422A (zh) * 2019-05-05 2019-07-12 苏州华天国科电力科技有限公司 基于人工神经网络的智能配电运行监测系统及调控方法
CN110311398A (zh) * 2019-08-02 2019-10-08 东北大学 一种新型储能电池系统的连接拓扑、控制系统及方法
CN110445158A (zh) * 2019-08-07 2019-11-12 国电南瑞科技股份有限公司 基于多网合一的储能电站系统及暂态控制方法
CN110855006A (zh) * 2019-12-02 2020-02-28 许继电气股份有限公司 一种基于边缘物联代理的分布式光储充调控系统
CN111030294A (zh) * 2018-10-10 2020-04-17 周锡卫 一种基于双路径网域大规模储能实时管控系统
CN112018825A (zh) * 2020-09-18 2020-12-01 云南电网有限责任公司电力科学研究院 一种多端口电能路由器能量协调控制方法
CN112348398A (zh) * 2020-11-23 2021-02-09 国网北京市电力公司 面向多站融合的储能规划方法、装置和处理器
CN112928765A (zh) * 2019-12-06 2021-06-08 阳光电源股份有限公司 风光储变流系统及其控制方法
CN113013905A (zh) * 2021-02-03 2021-06-22 国网天津市电力公司营销服务中心 一种风光储微能量收集无线传感系统调度方法及装置
CN113094902A (zh) * 2021-04-08 2021-07-09 国网上海市电力公司 一种多站融合容量联合规划方法
CN113468269A (zh) * 2021-07-02 2021-10-01 杭州轻舟科技有限公司 储能电站远程监控系统的数据传输方法、装置、介质
CN113900031A (zh) * 2021-09-14 2022-01-07 国网浙江省电力有限公司电力科学研究院 一种储能系统接入agc后的soc安全校验方法
CN114268113A (zh) * 2021-11-12 2022-04-01 安徽伯华氢能源科技有限公司 面向非恒定功率源的电解制氢与储能发电系统及控制方法
CN114678883A (zh) * 2022-04-24 2022-06-28 国网福建省电力有限公司经济技术研究院 一种电力储能系统的控制方法
CN114899845A (zh) * 2022-06-20 2022-08-12 国网湖南省电力有限公司 基于瞬时调频的储能电池安全判断方法
CN115411770A (zh) * 2022-08-24 2022-11-29 燕山大学 一种可再生能源系统的能量管理方法
CN116232219A (zh) * 2023-01-17 2023-06-06 中国电建集团北京勘测设计研究院有限公司 一种光伏电站远程监测系统及方法
CN118611155A (zh) * 2024-08-01 2024-09-06 长江三峡集团实业发展(北京)有限公司 适用于风光储电站的热备用损耗补偿方法、装置及设备
CN118899938A (zh) * 2024-09-30 2024-11-05 国网浙江省电力有限公司乐清市供电公司 一种用于光伏储电站内电池组的均衡控制方法和系统
CN119382202A (zh) * 2024-12-27 2025-01-28 山东力诺电力设计咨询有限公司 适用于光伏新能源电力系统电量存储优化控制系统

Families Citing this family (118)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3136533B1 (en) * 2014-04-24 2019-11-13 Kyocera Corporation Control method and control device
FR3025663B1 (fr) * 2014-09-10 2017-12-29 Renault Sas Procede de gestion de la plage d'utilisation d'une batterie
US10172786B2 (en) 2014-12-16 2019-01-08 Axim Biotechnologies, Inc. Oral care composition comprising cannabinoids
US9991732B2 (en) 2015-04-10 2018-06-05 Enovate Medical Llc Contactless battery system utilizing a bidirectional power converter
US10554048B2 (en) * 2015-05-18 2020-02-04 University Of North Carolina At Charlotte Battery energy storage system controller systems and methods
US20160365729A1 (en) * 2015-06-10 2016-12-15 Tanachat Pochana Intelligent control system for power generation equipment
KR20170126344A (ko) * 2016-05-09 2017-11-17 엘에스산전 주식회사 로컬 모니터링 데이터 관리 장치
US10141776B2 (en) * 2016-06-20 2018-11-27 General Electric Company Distribution of power commands in an energy storage system
TWI602381B (zh) * 2016-09-26 2017-10-11 財團法人資訊工業策進會 充放電控制裝置及方法
CN108270228B (zh) * 2017-01-03 2020-11-06 国家能源投资集团有限责任公司 储能系统的控制方法、装置和储能系统以及电力系统
DE102017202136A1 (de) 2017-02-10 2018-08-16 Siemens Aktiengesellschaft Energiespeichervorrichtung und deren Verwendung
DE102017106465A1 (de) * 2017-03-27 2018-09-27 LichtBlick SE Hybride Nutzung von Energiespeichern
CN107359637B (zh) * 2017-09-05 2024-03-22 张传坤 电力系统多级云储能系统
CN107425227A (zh) * 2017-09-12 2017-12-01 北京亦庄材料基因研究院有限公司 适用于大规模储能系统的蓄电池在线管理平台
CN107706910B (zh) * 2017-09-28 2020-08-07 广西大学 一种电网频率调节的实时调度方法
CN107623383B (zh) * 2017-10-19 2023-09-12 江阴市创新气门嘴有限公司 一种分布式光伏并网发电的监控系统
CN109802411B (zh) * 2017-11-15 2021-07-13 国家能源投资集团有限责任公司 储能系统控制的方法、装置和储能系统以及电力系统
CN108233398B (zh) * 2017-12-14 2023-10-20 中国电力科学研究院有限公司 一种集中式与分布式联合应用的分层储能系统与控制方法
CN109980694A (zh) * 2017-12-28 2019-07-05 广东电网有限责任公司电力调度控制中心 一种实时发电调度深调峰智能化辅助决策方法
CN108258701A (zh) * 2018-01-05 2018-07-06 神华集团有限责任公司 调节功率的方法和装置
FR3077690B1 (fr) * 2018-02-08 2021-01-08 Voltalis Regulation de la frequence de fonctionnement d'un reseau de transport et/ou de distribution d'energie electrique
CN108429280B (zh) * 2018-02-13 2022-07-08 中国电力科学研究院有限公司 一种无源电网广域虚拟频率控制方法及系统
US10686327B2 (en) 2018-04-13 2020-06-16 Honeywell International Inc. Energy storage controller
US11238474B2 (en) * 2018-06-15 2022-02-01 Hunt Energy Enterprise, L.L.C. Distributed energy control
CN109217369A (zh) * 2018-10-17 2019-01-15 国网辽宁省电力有限公司经济技术研究院 一种计及储能寿命的风储电站分层优化控制方法
CN111386654B (zh) * 2018-10-29 2023-08-04 东芝三菱电机产业系统株式会社 风力发电系统及电力转换装置
CN109636096B (zh) * 2018-11-01 2023-10-24 国家电网有限公司 一种储能电站输出功率优化方法及装置
CN110401228B (zh) * 2018-12-14 2024-07-30 特变电工西安电气科技有限公司 一种适用于微电网离网运行模式的稳定控制方法
CN109818419A (zh) * 2019-01-10 2019-05-28 国网新疆电力有限公司吐鲁番供电公司 一种变电站用智能指示灯系统
CN109742777A (zh) * 2019-03-04 2019-05-10 曹麾 低压台区峰谷负荷平衡智能管控子系统
CN109888874A (zh) * 2019-03-14 2019-06-14 珠海吉瓦科技有限公司 一种基于可用容量的储能系统功率分配优化方法
CN109936167A (zh) * 2019-04-30 2019-06-25 天津锦美碳材科技发展有限公司 一种适用于电解水制氢的光/风/储/市电的电能调度系统及方法
CN110061515B (zh) * 2019-05-23 2024-04-16 中国电建集团江西省电力建设有限公司 一种应用于光伏发电场的锌铁液流电池的储能监控装置
CN110266026B (zh) * 2019-06-26 2022-10-18 中国能源建设集团广东省电力设计研究院有限公司 一种电厂储能辅助调频的储能定容方法
CN110365114B (zh) * 2019-08-05 2021-12-21 国电南瑞科技股份有限公司 基于多模块集成的储能电站综合管理系统及信息交互方法
CN110416991B (zh) * 2019-08-13 2023-04-28 国网河南省电力公司经济技术研究院 一种模块化多端柔性直流微电网组网及其分层控制方法
CN111049171B (zh) * 2019-12-25 2024-03-22 深圳供电局有限公司 一种主动配电网储能配置方法
CN113131490B (zh) * 2019-12-30 2022-09-23 北京金风科创风电设备有限公司 新能源场站的无功控制方法、装置和系统
CN111682994B (zh) * 2020-04-29 2022-03-29 浙江杰芯科技有限公司 基于epa协议的环形或线形网络系统和非实时数据的传输方法
CN111900748B (zh) * 2020-06-15 2022-06-17 许继集团有限公司 一种适用于梯次利用储能电站的电网支撑控制方法及系统
CN111952998A (zh) * 2020-07-30 2020-11-17 国网甘肃省电力公司电力科学研究院 一种大规模集成储能系统及研制方法
CN111884862A (zh) * 2020-08-03 2020-11-03 湖南经研电力设计有限公司 储能电站二次系统的性能优化方法
CN111915083B (zh) * 2020-08-03 2024-06-11 国网山东省电力公司电力科学研究院 一种基于时间分层组合的风电功率预测方法及预测系统
CN112510270B (zh) * 2020-10-20 2022-04-19 国网浙江省电力有限公司电力科学研究院 一种储能系统多层级荷电状态均衡统一控制方法及系统
CN112260324B (zh) * 2020-10-29 2024-04-09 国网甘肃省电力公司电力科学研究院 利用储能消弭新能源并网风险的调频方法
CN112436532A (zh) * 2020-11-11 2021-03-02 许继集团有限公司 一种模块化变流器控制方法及装置
CN112467768A (zh) * 2020-11-17 2021-03-09 国网北京市电力公司 电池组的调度方法和装置
CN112467879A (zh) * 2020-11-18 2021-03-09 广东电网有限责任公司电力科学研究院 一种园区能源智能监测系统、方法和设备
CN112531828B (zh) * 2020-11-26 2023-02-10 许继集团有限公司 一种电化学储能电站bms协同控制系统及方法
CN112682268A (zh) * 2020-12-07 2021-04-20 国投云南风电有限公司 一种风电场管理用安全监控系统
CN112765425B (zh) * 2020-12-31 2023-10-20 国能日新科技股份有限公司 水电站数据处理方法及电子设备
CN112821418B (zh) * 2021-01-21 2023-07-07 上海电气集团股份有限公司 一种光储充多目标功率动态调节系统及方法
CN115207984B (zh) * 2021-04-09 2024-06-04 正泰集团研发中心(上海)有限公司 微电网系统的功率分配方法及微电网系统
CN113162091B (zh) * 2021-05-13 2022-09-02 北方工业大学 一种提升风电平滑的储能系统配置方法
CN113363966A (zh) * 2021-05-31 2021-09-07 湖南高创新能源有限公司 一种分布式储能系统的承载装置及风电场能量管理方法
CN113193599B (zh) * 2021-06-06 2024-09-06 中国南方电网有限责任公司 一种风储多时间尺度优化控制系统
CN113644736B (zh) * 2021-07-01 2022-04-12 广西大学 5g基站智能微电网多源供电系统
CN113572161B (zh) * 2021-07-28 2023-08-29 广东电网有限责任公司 一种抗灾保底电网的储能系统在线状态监测和评估方法
CN113743724B (zh) * 2021-08-02 2024-05-28 南方电网科学研究院有限责任公司 新能源场站配置储能评估方法、系统、介质及电力终端
CN113746142B (zh) * 2021-08-09 2022-07-22 大连理工大学 一种风光电站汇聚调度方法
CN113824588A (zh) * 2021-09-14 2021-12-21 华能嘉祥发电有限公司 一种基于安全监管需求的统一融合子站系统
CN113991783B (zh) * 2021-10-29 2024-10-22 北京能高自动化技术股份有限公司 基于退役电池构建的光储充能源系统控制方法
US11411533B1 (en) * 2021-10-29 2022-08-09 King Fahd University Of Petroleum And Minerals Moving linear regression based power firming filter
CN114069676B (zh) * 2021-11-19 2023-11-28 许继集团有限公司 一种基于soc均分的电池储能电站agc控制方法
CN114123266B (zh) * 2021-11-26 2024-09-17 国网甘肃省电力公司电力科学研究院 一种大规模储能电站四级实时协调调控方法及其应用
CN114243802B (zh) * 2021-12-16 2023-08-15 南京瀚元科技有限公司 一种台区光储充协同控制方法及系统
CN114221351B (zh) * 2021-12-22 2023-06-13 国网冀北电力有限公司秦皇岛供电公司 电压无功调节方法、装置、终端及存储介质
CN114256982A (zh) * 2021-12-24 2022-03-29 珠海格力电器股份有限公司 光储充一体的空调系统及其控制方法、存储介质
CN114548809A (zh) * 2022-02-28 2022-05-27 西安热工研究院有限公司 一种电力储能系统管理方法及系统
CN114625052A (zh) * 2022-03-28 2022-06-14 国网北京市电力公司 一种用于多站融合系统的冷热电控制系统及方法
CN114977227B (zh) * 2022-04-17 2024-11-08 深圳市未蓝新能源科技有限公司 一种用户侧多套储能系统的控制方法
CN114709878A (zh) * 2022-05-09 2022-07-05 广东电网有限责任公司 应用于光储直柔建筑的光储协同配置方法、设备及介质
CN115622100B (zh) * 2022-05-12 2023-07-28 深圳市海雷新能源有限公司 一种使用光伏储能电池的企业用电分配监测系统及方法
CN115102239B (zh) * 2022-05-31 2024-07-23 湖南迪泰尔综合能源规划设计有限公司 一种考虑soc均衡的储能电站一次调频控制方法及系统
CN115000989A (zh) * 2022-06-28 2022-09-02 国网江苏省电力有限公司经济技术研究院 一种多储能电站参与减轻线路过载的协调控制方法
CN115000992B (zh) * 2022-07-18 2022-11-01 联通(广东)产业互联网有限公司 一种数据中心用绿色备用电源的调控系统
CN115102210B (zh) * 2022-07-21 2024-11-22 台州宏创电力集团有限公司 参与电力辅助服务的区域换电站系统及站间控制方法
CN115378969A (zh) * 2022-07-28 2022-11-22 中国能源建设集团天津电力设计院有限公司 一种充电站边缘聚合管理装置
CN115276177B (zh) * 2022-08-18 2023-09-26 上海采日能源科技有限公司 储能电池充放电功率控制方法、装置及电池控制系统
CN115967178B (zh) * 2022-12-07 2023-09-05 贵州大学 一种储能系统运行的监测系统及方法
CN115954895B (zh) * 2023-01-05 2024-07-19 广东顺德电力设计院有限公司 一种用于智慧园区能源管理的功率控制方法和系统
CN115912447B (zh) * 2023-01-06 2023-05-30 中国电力科学研究院有限公司 一种储能电站功率分配方法及系统
CN116170383A (zh) * 2023-02-08 2023-05-26 广州汇电云联数科能源有限公司 一种储能电站通信组网方法、装置、设备及存储介质
CN115995885B (zh) * 2023-02-10 2023-10-27 深圳库博能源科技有限公司 一种组串式储能系统满载运行自动测试方法
CN116454983B (zh) * 2023-02-11 2024-03-26 奈曼旗广星配售电有限责任公司 一种风光储联合最优控制管理方法、系统及设备
WO2024186838A2 (en) * 2023-03-05 2024-09-12 Walker Stanley A system for an independent recursive virtual world with a voice controlled interface
CN116454934B (zh) * 2023-04-03 2024-01-19 威胜能源技术股份有限公司 一种基于多设备的储能ems云平台
CN116316739B (zh) * 2023-04-12 2024-11-15 湖南经研电力设计有限公司 基于充放电潮流优化的共享储能站日协同调度方法及系统
CN116191517A (zh) * 2023-04-27 2023-05-30 北京国能国源能源科技有限公司 一种基于风光的储能系统
CN118886833A (zh) * 2023-04-30 2024-11-01 上海思格源智能科技有限公司 交互式光伏信息处理控制系统、方法
CN116317173B (zh) * 2023-05-25 2023-11-21 水电水利规划设计总院 一种运用于光伏项目的储能在线监控系统
CN116345698A (zh) * 2023-05-30 2023-06-27 中国华能集团清洁能源技术研究院有限公司 储能电站运维管控方法、系统、设备及介质
CN116488352B (zh) * 2023-06-20 2023-09-12 北京航能绿电科技有限公司 用于储能电站的电路安全监测预警方法
CN116845945B (zh) * 2023-07-05 2024-03-08 云储新能源科技有限公司 一种用户侧优化储能控制系统及方法
CN116544936B (zh) * 2023-07-07 2023-09-22 北京国网电力技术有限公司 一种用于储能系统的智能控制调度方法及系统
CN117277384A (zh) * 2023-09-19 2023-12-22 浙江衡睿科技有限公司 一种基于储能系统功率追踪的控制系统
CN116995641B (zh) * 2023-09-26 2023-12-22 北京交通大学 一种应用于轨道交通储能的能量管理架构及方法
CN117013583B (zh) * 2023-09-28 2024-01-16 烟台开发区德联软件有限责任公司 一种电化学储能电站故障预警方法及系统
CN117039961B (zh) * 2023-10-09 2024-01-30 广州菲利斯太阳能科技有限公司 一种微电网混合储能系统及方法
CN117371726B (zh) * 2023-10-20 2024-05-24 国网新疆电力有限公司 储能信息子站状态感知和性能评估系统及方法
CN117477720A (zh) * 2023-11-01 2024-01-30 江苏天合储能有限公司 储能系统功率均衡调度方法、系统、设备及存储介质
CN117200300B (zh) * 2023-11-03 2024-02-23 深圳海辰储能科技有限公司 基于储能系统的电能调度方法及装置
CN117310506B (zh) * 2023-11-23 2024-04-12 宁德时代新能源科技股份有限公司 监测储能电站的方法、装置和计算机可读存储介质
CN117353359B (zh) * 2023-12-05 2024-04-12 国网浙江省电力有限公司宁波供电公司 电池联合储能供电方法及系统
CN117713174B (zh) * 2023-12-15 2024-07-19 国网青海省电力公司清洁能源发展研究院 一种储能系统功率调节方法
CN117728498B (zh) * 2023-12-19 2024-06-07 国网青海省电力公司清洁能源发展研究院 一种应用储能装置的电网稳定性的控制方法
CN117791674A (zh) * 2023-12-23 2024-03-29 广东永光新能源科技有限公司 风力发电智能储能系统及方法
CN117639081B (zh) * 2024-01-23 2024-04-30 深圳市德兰明海新能源股份有限公司 一种光伏储能逆变并机系统及其光伏能量调度方法
CN117937769B (zh) * 2024-03-21 2024-07-26 西安奇点能源股份有限公司 一种协调控制器功率控制系统及方法
CN118249480B (zh) * 2024-05-29 2024-08-13 云储新能源科技有限公司 一种储能电池工况主动调节方法、装置、介质及产品
CN118611261B (zh) * 2024-05-31 2025-04-04 重庆千信新能源有限公司 光伏电力数据上传方法
CN118282050B (zh) * 2024-05-31 2024-08-20 湖北华中电力科技开发有限责任公司 一种电力储能设备运行信息采集方法
CN118367623A (zh) * 2024-06-18 2024-07-19 南方电网调峰调频(广东)储能科技有限公司 储能电站的集中调度方法、装置、设备及存储介质
CN119093585A (zh) * 2024-08-09 2024-12-06 广东工业大学 一种用于重力储能监控系统的信息安全防护方法及系统
CN119093498A (zh) * 2024-08-29 2024-12-06 国电南瑞南京控制系统有限公司 一种低压配电网台区分布式光伏多层级调控方法及系统
CN118889503A (zh) * 2024-09-27 2024-11-01 内蒙古润蒙能源有限公司 一种铁铬液流电池储能电站内储能车间的布置方法
CN119182360B (zh) * 2024-11-19 2025-03-04 甘肃省安装建设集团有限公司 一种用于光伏光热电站的远程储能运维控制系统
CN119276190B (zh) * 2024-12-09 2025-03-28 武汉理工大学三亚科教创新园 一种低碳建筑屋顶储能系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010089253A1 (en) * 2009-02-03 2010-08-12 Dong Energy Power A/S Distributed electrical power production system and method of control thereof
JP2011234563A (ja) * 2010-04-28 2011-11-17 Toshiba Corp 蓄電池制御システム及び蓄電池制御方法
CN102510123A (zh) * 2011-11-10 2012-06-20 山东大学 应对风电大范围切机的自动储能控制方法
CN202633961U (zh) * 2012-03-30 2012-12-26 中国电力科学研究院 一种电池储能电站的监控系统
CN103187733A (zh) * 2011-12-31 2013-07-03 中国电力科学研究院 兆瓦级液流电池储能电站实时功率控制方法及其系统
CN103560532A (zh) * 2012-03-30 2014-02-05 中国电力科学研究院 一种兆瓦级电池储能电站的监控系统及其方法

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8706650B2 (en) * 2009-01-14 2014-04-22 Integral Analytics, Inc. Optimization of microgrid energy use and distribution
US8178997B2 (en) * 2009-06-15 2012-05-15 Google Inc. Supplying grid ancillary services using controllable loads
US8196395B2 (en) * 2009-06-29 2012-06-12 Lightsail Energy, Inc. Compressed air energy storage system utilizing two-phase flow to facilitate heat exchange
WO2013042474A1 (ja) * 2011-09-21 2013-03-28 日本電気株式会社 電池制御システム、電池制御装置、電池制御方法、および記録媒体
US9514428B2 (en) * 2011-10-28 2016-12-06 Viridity Energy, Inc. Managing energy assets associated with transport operations
US9715261B2 (en) * 2012-02-29 2017-07-25 Thomas Wilkins Continuous dynamic balancing of generation and loads
EP2688173B1 (en) * 2012-07-20 2017-03-22 Panasonic Intellectual Property Management Co., Ltd. Multi-service provision with energy storage system
US8849715B2 (en) * 2012-10-24 2014-09-30 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US9548619B2 (en) * 2013-03-14 2017-01-17 Solaredge Technologies Ltd. Method and apparatus for storing and depleting energy

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010089253A1 (en) * 2009-02-03 2010-08-12 Dong Energy Power A/S Distributed electrical power production system and method of control thereof
JP2011234563A (ja) * 2010-04-28 2011-11-17 Toshiba Corp 蓄電池制御システム及び蓄電池制御方法
CN102510123A (zh) * 2011-11-10 2012-06-20 山东大学 应对风电大范围切机的自动储能控制方法
CN103187733A (zh) * 2011-12-31 2013-07-03 中国电力科学研究院 兆瓦级液流电池储能电站实时功率控制方法及其系统
CN202633961U (zh) * 2012-03-30 2012-12-26 中国电力科学研究院 一种电池储能电站的监控系统
CN103560532A (zh) * 2012-03-30 2014-02-05 中国电力科学研究院 一种兆瓦级电池储能电站的监控系统及其方法

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111030294A (zh) * 2018-10-10 2020-04-17 周锡卫 一种基于双路径网域大规模储能实时管控系统
CN109743387A (zh) * 2018-12-29 2019-05-10 江苏金派克新能源有限公司 锂电池组装车间安全监测统一管理系统
CN110011422A (zh) * 2019-05-05 2019-07-12 苏州华天国科电力科技有限公司 基于人工神经网络的智能配电运行监测系统及调控方法
CN110311398A (zh) * 2019-08-02 2019-10-08 东北大学 一种新型储能电池系统的连接拓扑、控制系统及方法
CN110445158A (zh) * 2019-08-07 2019-11-12 国电南瑞科技股份有限公司 基于多网合一的储能电站系统及暂态控制方法
CN110445158B (zh) * 2019-08-07 2022-09-13 国电南瑞科技股份有限公司 基于多网合一的储能电站系统及暂态控制方法
CN110855006B (zh) * 2019-12-02 2023-08-08 许继电气股份有限公司 一种基于边缘物联代理的分布式光储充调控系统
CN110855006A (zh) * 2019-12-02 2020-02-28 许继电气股份有限公司 一种基于边缘物联代理的分布式光储充调控系统
CN112928765A (zh) * 2019-12-06 2021-06-08 阳光电源股份有限公司 风光储变流系统及其控制方法
CN112928765B (zh) * 2019-12-06 2024-05-14 阳光电源股份有限公司 风光储变流系统及其控制方法
CN112018825A (zh) * 2020-09-18 2020-12-01 云南电网有限责任公司电力科学研究院 一种多端口电能路由器能量协调控制方法
CN112018825B (zh) * 2020-09-18 2023-11-21 云南电网有限责任公司电力科学研究院 一种多端口电能路由器能量协调控制方法
CN112348398A (zh) * 2020-11-23 2021-02-09 国网北京市电力公司 面向多站融合的储能规划方法、装置和处理器
CN113013905A (zh) * 2021-02-03 2021-06-22 国网天津市电力公司营销服务中心 一种风光储微能量收集无线传感系统调度方法及装置
CN113013905B (zh) * 2021-02-03 2024-05-28 国网天津市电力公司营销服务中心 一种风光储微能量收集无线传感系统调度方法及装置
CN113094902A (zh) * 2021-04-08 2021-07-09 国网上海市电力公司 一种多站融合容量联合规划方法
CN113468269A (zh) * 2021-07-02 2021-10-01 杭州轻舟科技有限公司 储能电站远程监控系统的数据传输方法、装置、介质
CN113900031B (zh) * 2021-09-14 2024-05-31 国网浙江省电力有限公司电力科学研究院 一种储能系统接入agc后的soc安全校验方法
CN113900031A (zh) * 2021-09-14 2022-01-07 国网浙江省电力有限公司电力科学研究院 一种储能系统接入agc后的soc安全校验方法
CN114268113A (zh) * 2021-11-12 2022-04-01 安徽伯华氢能源科技有限公司 面向非恒定功率源的电解制氢与储能发电系统及控制方法
CN114678883A (zh) * 2022-04-24 2022-06-28 国网福建省电力有限公司经济技术研究院 一种电力储能系统的控制方法
CN114899845A (zh) * 2022-06-20 2022-08-12 国网湖南省电力有限公司 基于瞬时调频的储能电池安全判断方法
CN115411770A (zh) * 2022-08-24 2022-11-29 燕山大学 一种可再生能源系统的能量管理方法
CN116232219B (zh) * 2023-01-17 2024-04-16 中国电建集团北京勘测设计研究院有限公司 一种光伏电站远程监测系统及方法
CN116232219A (zh) * 2023-01-17 2023-06-06 中国电建集团北京勘测设计研究院有限公司 一种光伏电站远程监测系统及方法
CN118611155A (zh) * 2024-08-01 2024-09-06 长江三峡集团实业发展(北京)有限公司 适用于风光储电站的热备用损耗补偿方法、装置及设备
CN118899938A (zh) * 2024-09-30 2024-11-05 国网浙江省电力有限公司乐清市供电公司 一种用于光伏储电站内电池组的均衡控制方法和系统
CN119382202A (zh) * 2024-12-27 2025-01-28 山东力诺电力设计咨询有限公司 适用于光伏新能源电力系统电量存储优化控制系统

Also Published As

Publication number Publication date
US9660450B2 (en) 2017-05-23
US20160218511A1 (en) 2016-07-28

Similar Documents

Publication Publication Date Title
WO2015054869A1 (zh) 一种兆瓦级电池储能电站的监控系统及其方法
CN103560532B (zh) 一种兆瓦级电池储能电站的监控系统及其方法
CN112467722B (zh) 一种考虑电动汽车充电站的主动配电网源-网-荷-储协调规划方法
CN103368193B (zh) 用于跟踪计划出力的电池储能电站实时功率分配方法
CN107887903B (zh) 考虑元件频率特性的微电网鲁棒优化调度方法
CN110009262B (zh) 一种主动配电网的日前-日内两阶段优化调度方法
CN103490410B (zh) 一种基于多目标优化的微电网规划和容量配置方法
CN109980685A (zh) 一种考虑不确定性的主动配电网分布式优化运行方法
CN108683179A (zh) 基于混合整数线性规划的主动配电网优化调度方法及系统
CN104037765B (zh) 基于改进遗传算法选取有源配电网供电恢复方案的方法
WO2013097489A1 (zh) 兆瓦级电池储能电站实时功率控制方法及其系统
CN111711184A (zh) 一种基于最坏场景辨识的电力系统鲁棒经济调度方法
CN106684913B (zh) 一种基于多代理的储能电站跟踪发电计划控制系统和方法
CN103368192B (zh) 基于贪心策略的电池储能电站功率控制方法及其系统
CN105893714B (zh) 基于大电网仿真系统下的自动电压控制系统闭环检测及评估方法
CN103904695A (zh) 一种基于mcs-pso的临近海岛多微网动态调度方法
CN202633961U (zh) 一种电池储能电站的监控系统
CN116599151A (zh) 基于多源数据的源网储荷安全管理方法
Zheng et al. Optimal short-term power dispatch scheduling for a wind farm with battery energy storage system
CN104112237A (zh) 一种基于wams的改进遗传算法的电网无功容量优化配置方法
CN108280554A (zh) 一种可再生能源并网消纳系统及方法
CN109066741A (zh) 一种用于区域电网削峰填谷的分布式储能规划方法及系统
CN113193592A (zh) 一种配电网拓扑动态演化过程的优化方法和系统
CN117833320A (zh) 一种含分布式光伏配电网中储能的优化调度方法和系统
CN108667054A (zh) 一种储能规划方法及装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 14123518

Country of ref document: US

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13895559

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13895559

Country of ref document: EP

Kind code of ref document: A1