WO2008102429A1 - Construction method of large space building - Google Patents
Construction method of large space building Download PDFInfo
- Publication number
- WO2008102429A1 WO2008102429A1 PCT/JP2007/053014 JP2007053014W WO2008102429A1 WO 2008102429 A1 WO2008102429 A1 WO 2008102429A1 JP 2007053014 W JP2007053014 W JP 2007053014W WO 2008102429 A1 WO2008102429 A1 WO 2008102429A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- truss
- construction method
- large space
- end portion
- rear end
- Prior art date
Links
- 238000010276 construction Methods 0.000 title abstract 4
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/342—Structures covering a large free area, whether open-sided or not, e.g. hangars, halls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009500026A JP4843709B2 (en) | 2007-02-20 | 2007-02-20 | Construction method of large space building |
CN200780051493XA CN101611203B (en) | 2007-02-20 | 2007-02-20 | Construction method of large space building |
PCT/JP2007/053014 WO2008102429A1 (en) | 2007-02-20 | 2007-02-20 | Construction method of large space building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2007/053014 WO2008102429A1 (en) | 2007-02-20 | 2007-02-20 | Construction method of large space building |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2008102429A1 true WO2008102429A1 (en) | 2008-08-28 |
Family
ID=39709714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2007/053014 WO2008102429A1 (en) | 2007-02-20 | 2007-02-20 | Construction method of large space building |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP4843709B2 (en) |
CN (1) | CN101611203B (en) |
WO (1) | WO2008102429A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444203A (en) * | 2011-09-15 | 2012-05-09 | 浙江城建建设集团有限公司 | High-altitude large-span cantilever corridor type steel concrete structure and construction method |
CN102635209A (en) * | 2012-05-23 | 2012-08-15 | 中建二局第三建筑工程有限公司 | Cornice steel skeleton and bracket steel skeleton for large-span big roof of pseudo-classic architecture and construction method of cornice steel skeleton and bracket steel skeleton |
CN104196246A (en) * | 2014-08-27 | 2014-12-10 | 浙江精工钢结构集团有限公司 | Partial-evacuation in-site lifting construction method for multidirectional stress structure of continuous truss |
WO2017127947A1 (en) * | 2016-01-27 | 2017-08-03 | Nüssli (Switzerland) Ltd. | Supporting structure for a hall, stage, stand or bridge construction which can be assembled and disassembled multiple times |
JP2018123635A (en) * | 2017-02-03 | 2018-08-09 | 株式会社竹中工務店 | Building structure |
CN111794490A (en) * | 2020-08-10 | 2020-10-20 | 深圳市江丰工程技术有限公司 | A hanging point truss structure of a climbing frame |
CN113389267A (en) * | 2021-06-17 | 2021-09-14 | 北京工业大学 | Spherical grid structure capable of being installed quickly |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103696576A (en) * | 2013-12-12 | 2014-04-02 | 上海通用金属结构工程有限公司 | Method for constructing industrial heat supply station figured-steel structural roof |
CN103669887A (en) * | 2013-12-20 | 2014-03-26 | 上海市机械施工集团有限公司 | Temporary supporting frame for annular steel structure installation |
CN103669886A (en) * | 2013-12-20 | 2014-03-26 | 上海市机械施工集团有限公司 | Installation method for annular steel structure |
CN107337125B (en) * | 2017-05-31 | 2019-08-06 | 中国化学工程第十三建设有限公司 | Flexible sliding platform girder steel handling apparatus and girder steel handling method |
CN111809726B (en) * | 2020-07-17 | 2025-04-01 | 北京市建筑设计研究院股份有限公司 | Truss structure and building structure |
CN113123469A (en) * | 2021-03-24 | 2021-07-16 | 中国五冶集团有限公司 | Method for constructing complex curved surface modeling roof grid structure |
CN115492411B (en) * | 2022-10-19 | 2023-06-16 | 中铁五局集团建筑工程有限责任公司 | High-precision rapid butt joint device and butt joint method for unitized high-altitude overhanging steel structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6490339A (en) * | 1987-10-01 | 1989-04-06 | Fujita Corp | Construction method for controlling stress and deformation of large span housing |
JPH04111829A (en) * | 1990-08-30 | 1992-04-13 | Shimizu Corp | Construction method for large span roofs |
JPH08144526A (en) * | 1994-11-17 | 1996-06-04 | Tomoe Corp | Construction method of roof frame |
JP2945917B2 (en) * | 1990-10-24 | 1999-09-06 | 東急建設株式会社 | Construction method of large space building |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2682827Y (en) * | 2004-03-16 | 2005-03-09 | 张守明 | High-performance energy-saving cow house |
-
2007
- 2007-02-20 JP JP2009500026A patent/JP4843709B2/en active Active
- 2007-02-20 CN CN200780051493XA patent/CN101611203B/en not_active Expired - Fee Related
- 2007-02-20 WO PCT/JP2007/053014 patent/WO2008102429A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6490339A (en) * | 1987-10-01 | 1989-04-06 | Fujita Corp | Construction method for controlling stress and deformation of large span housing |
JPH04111829A (en) * | 1990-08-30 | 1992-04-13 | Shimizu Corp | Construction method for large span roofs |
JP2945917B2 (en) * | 1990-10-24 | 1999-09-06 | 東急建設株式会社 | Construction method of large space building |
JPH08144526A (en) * | 1994-11-17 | 1996-06-04 | Tomoe Corp | Construction method of roof frame |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444203A (en) * | 2011-09-15 | 2012-05-09 | 浙江城建建设集团有限公司 | High-altitude large-span cantilever corridor type steel concrete structure and construction method |
CN102444203B (en) * | 2011-09-15 | 2013-06-19 | 浙江城建建设集团有限公司 | High-altitude long-span overhanging corridor type reinforced concrete structure and construction method |
CN102635209A (en) * | 2012-05-23 | 2012-08-15 | 中建二局第三建筑工程有限公司 | Cornice steel skeleton and bracket steel skeleton for large-span big roof of pseudo-classic architecture and construction method of cornice steel skeleton and bracket steel skeleton |
CN104196246A (en) * | 2014-08-27 | 2014-12-10 | 浙江精工钢结构集团有限公司 | Partial-evacuation in-site lifting construction method for multidirectional stress structure of continuous truss |
WO2017127947A1 (en) * | 2016-01-27 | 2017-08-03 | Nüssli (Switzerland) Ltd. | Supporting structure for a hall, stage, stand or bridge construction which can be assembled and disassembled multiple times |
JP2018123635A (en) * | 2017-02-03 | 2018-08-09 | 株式会社竹中工務店 | Building structure |
CN111794490A (en) * | 2020-08-10 | 2020-10-20 | 深圳市江丰工程技术有限公司 | A hanging point truss structure of a climbing frame |
CN113389267A (en) * | 2021-06-17 | 2021-09-14 | 北京工业大学 | Spherical grid structure capable of being installed quickly |
Also Published As
Publication number | Publication date |
---|---|
CN101611203A (en) | 2009-12-23 |
JPWO2008102429A1 (en) | 2010-05-27 |
CN101611203B (en) | 2011-03-02 |
JP4843709B2 (en) | 2011-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2008102429A1 (en) | Construction method of large space building | |
KR101440422B1 (en) | Underground vertical concrete structure construction method by the top-down method | |
TN2011000572A1 (en) | PARKING SHELTER EQUIPPED WITH SOLAR PHOTOVOLTAIC PANELS | |
CN208792343U (en) | The slope protective device of architectural engineering | |
JP6057059B2 (en) | Building raising method and building structure | |
JP5528845B2 (en) | Floor structure construction method and floor plate fixture used therefor | |
CN204385883U (en) | A kind of Fabricated balcony | |
CN205475854U (en) | Roof beam wall composite external wall component | |
CN106835984B (en) | The reverse construction method of installation of slug matching bridge Bridge Erector | |
KR101422789B1 (en) | Prefabricated Korean House frame and it's construction methods | |
JP5840914B2 (en) | New and old building thatched roof method | |
CN204849777U (en) | Tilting board double row pile supporting construction that bears down on one | |
CN102605962A (en) | Mounting and constructing method for steel plate shear wall | |
CN104196221B (en) | Large area is encorbelmented the construction bearing platform of building and erection method thereof | |
CN108677974A (en) | The slope protective device that architectural engineering is used for | |
CN204551897U (en) | With the steel framework post of joint type linkage | |
KR102114477B1 (en) | Construction Structure of Pole Plate, Comprising Column Head with Upper/Lower Combining Structure for Enhanced Durability of Column and Buildability of Pole Plate | |
CN206352397U (en) | A kind of auxiliary mould for being used to connect pillar and take over a business | |
JP7152282B2 (en) | Building | |
CN115305824A (en) | Construction method of bridge rectangular penetrating rod support | |
KR101539371B1 (en) | Gable Steel Frame for Reducing Moment | |
CN102511336B (en) | High-strength and short greenhouse skeleton structure and construction method thereof | |
GB2466927B (en) | Fence panel post apparatus | |
CN107780539A (en) | Prefabrication supporting member and its assemble method | |
CN102535693B (en) | Curtain wall column mounting method and mounting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 200780051493.X Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 07714540 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2009500026 Country of ref document: JP |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 07714540 Country of ref document: EP Kind code of ref document: A1 |