WO2005108695A1 - System for production of standard size dwellings using a satellite manufacturing facility - Google Patents
System for production of standard size dwellings using a satellite manufacturing facility Download PDFInfo
- Publication number
- WO2005108695A1 WO2005108695A1 PCT/US2005/005429 US2005005429W WO2005108695A1 WO 2005108695 A1 WO2005108695 A1 WO 2005108695A1 US 2005005429 W US2005005429 W US 2005005429W WO 2005108695 A1 WO2005108695 A1 WO 2005108695A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- standard size
- dwelling
- subassembly
- constructing
- dwellings
- Prior art date
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 306
- 238000000034 method Methods 0.000 claims abstract description 94
- 230000032258 transport Effects 0.000 claims description 59
- 238000009434 installation Methods 0.000 claims description 15
- 230000000712 assembly Effects 0.000 claims description 13
- 238000000429 assembly Methods 0.000 claims description 13
- 238000010348 incorporation Methods 0.000 claims 6
- 239000000463 material Substances 0.000 abstract description 67
- 230000008569 process Effects 0.000 abstract description 26
- 238000010276 construction Methods 0.000 description 79
- 230000008901 benefit Effects 0.000 description 29
- 238000013461 design Methods 0.000 description 24
- 229910000831 Steel Inorganic materials 0.000 description 13
- 238000011161 development Methods 0.000 description 13
- 230000018109 developmental process Effects 0.000 description 13
- 238000009432 framing Methods 0.000 description 13
- 239000010959 steel Substances 0.000 description 13
- 239000002994 raw material Substances 0.000 description 8
- 230000000694 effects Effects 0.000 description 6
- 238000009436 residential construction Methods 0.000 description 6
- 241000743339 Agrostis Species 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 238000009428 plumbing Methods 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 230000003252 repetitive effect Effects 0.000 description 4
- 238000003860 storage Methods 0.000 description 4
- 230000001105 regulatory effect Effects 0.000 description 3
- 230000011218 segmentation Effects 0.000 description 3
- 238000009826 distribution Methods 0.000 description 2
- 238000009408 flooring Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 238000010422 painting Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 235000019640 taste Nutrition 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 241000196324 Embryophyta Species 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 239000013590 bulk material Substances 0.000 description 1
- 230000001427 coherent effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000001627 detrimental effect Effects 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 238000009424 underpinning Methods 0.000 description 1
- 230000035899 viability Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
Definitions
- This invention relates to a system for manufacturing standard size dwellings using a satellite manufacturing facility that can be erected on or near a large housing development to efficiently manufacture standard size dwellings, substantially in their entirety, in a factory environment using subassemblies manufactured at one or more other facilities and/or materials supplied from one or more other sources, prior to transporting and placing these completed dwellings on pre-constructed permanent foundations.
- the present residential construction industry can be divided into segments based on the three basic methods which are utilized to produce dwellings: manufactured or modular (manufactured), panelized or component (panelized) - with elements fabricated both on and off site, and individually built (stick-built) - with dwelling construction in-place at a specific building site.
- manufactured or modular manufactured
- panelized or component panelized
- individually built stick-built
- a common goal of the residential construction industry is to produce quality dwellings that have broad market appeal in a cost efficient manner.
- the manufactured home is built in a factory which is geographically remote from a housing development or a particular building site.
- the factory produced modules must be transported over public highways and roadways to a dealership or pre-determined building site.
- the earliest of this class of homes were called mobile homes. They were, and still are, equipped with axles attached to an undercarriage framework.
- the typical manufactured home is built in a factory which serves a broad geographic region, ranging in size from tens or hundreds of miles in radius to several states. Because of the cost efficiencies inherent in factory production, the manufactured (and some panelized) method is successful in producing lower cost new housing typically for small size homes which are often in a rural setting.
- a manufactured home is produced for direct sale to a customer and installation at a particular building site or it may be sold to a dealer and held in inventory for a subsequent sale and installation.
- the present-day manufactured home offers significant improvements over the former mobile home.
- a plurality of manufactured modular segments may comprise the finished home and the modules are transported from a remote factory to a dealership or destination building site. Once delivered to the final building location, the modules are joined together to form a resultant dwelling that is significantly larger than a typical 12' x 70' single module manufactured home.
- the major advantage of manufactured homes is the use of a factory environment. Within a factory setting, a controlled environment exists where complete, roadable dwellings are built. Factories represent a significant advantage in mass production efficiency. The advantages of a factory environment are: Dwellings can be produced very quickly from order to finished product. Time savings is a marketing advantage and a source of cost savings in terms of the financing costs associated with the resources tied up in the dwelling. Foul weather has negligible impact on production.
- Construction tolerances are more precise and more controllable, resulting in better overall product quality. Increased production through multiple shifts is readily achievable because the critical conditions of lighting, ventilation, and air temperatures are controlled 24 hours a day.
- Non-sequential construction techniques are possible.
- a Federal (HUD) Building Code can be utilized which offers a streamlined regulatory environment since it is focused on performance standards rather than implementation standards.
- homes built to the HUD Building Code are less expensive to produce than stick-built homes which are built to the Uniform Building Code (UBC) or other local building codes.
- UBC Uniform Building Code
- Major cost efficiencies are realized in both the quantity of labor hours necessary to build homes, and the unit cost for labor because of the use of repetitive production tasks.
- the ability to bulk purchase and handle materials at a fixed manufacturing location also produces major cost efficiencies.
- a method of dwelling construction which has similarities to the manufactured dwelling technology is the panelized method of construction.
- Panelized construction consists of a system for prefabricating walls, floors, and roof components into units or sections. This method of construction is most efficient where there is a repetition of the panel types and dimensions. Panels are manufactured using a jig, into which the framing members are placed and then interconnected via nails, screws, or welds. The interior and/or exterior sheathing, or even the complete interior or exterior finish, may be applied to the wall panel prior to the finished panel being hoisted onto the structure. Shop panelization offers numerous advantages. The panel shop provides a controlled environment where work proceeds regardless of weather conditions. The application of sheathing and finish work is easier and faster with the panels placed in a horizontal position instead of a vertical position.
- panelized construction major components of homes are either prefabricated in a remote factory environment or at the site where, unfortunately, panel installation is exposed to local weather conditions. If components or panels are built in a factory, they are subsequently transported over public highways and roadways to the building site where they are hoisted into place and interconnected to form the basic dwelling structure using conventional building techniques.
- the panelized construction technique requires the use of hoisting equipment at the building site to handle the preassembled components and also requires that significant amounts of finish work be performed at the site to assemble components and finish construction joints between panels and then to apply all finishes that were not included in the panels or components.
- the major advantages of panelized construction are the following: Cost and production efficiencies of off-site factory panel fabrication. Cost reductions from mass producing panels at a project location can also be realized.
- the remaining category of residential housing is the stick-built house that is either custom built according to an owner's individual specifications, or as a builder's spec home, or constructed as one of a plurality of pre-existing models in a housing development. These dwellings are built in the traditional manner of using framing members (typically dimensional lumber) to fabricate the dwelling on a foundation at the building site according to a set of architectural plans. Stick- built home design differs greatly from manufactured home design. There are no architectural, structural, or dimensional limitations with stick-built housing like those imposed on manufactured design by virtue of the roadway transportation limitations.
- Stick-built construction requires a sequenced building format, where item A must be completed before item B can begin, and in turn, item B must then be completed before item C can begin and so on.
- item A must be completed before item B can begin
- item B must then be completed before item C can begin and so on.
- the ground level walls must be completed before the second level floor can begin, and the second level walls must be completed before the second level ceiling can begin.
- stick-built home industry is primarily based on homebuilding companies which subcontract labor and material packages to a series of independent companies who supply and install their portion of the work. While this method of residential home construction has worked for many years, there are inherent inefficiencies in this method that result in significant cost penalties to the homebuyer.
- Stick-built dwellings can be built to any size or layout that is desired within the limitations of the structural capabilities of the framing material. Multi-story homes can easily be built with the architectural features, room size, and layout being determined by the architect, homebuilder, and/or owner. There are no overriding constraints imposed by a need to transport the structure over the existing public highway or roadway system.
- Other advantages of stick-built construction techniques are: Ability to build a wide diversity of standard size dwellings (including single and multi-story).
- the manufactured method cannot be used to build standard size homes without segmentation of the home into modules of relatively small dimensions which results in design and floor plan compromises.
- the manufactured modules must be transported a significant distance from the factory to the building site, often via a dealership.
- Manufactured home segments are subject to significant architectural and floor plan constraints because of the need to transport the completed modules over public highways and roadways.
- This invention relates to a system for manufacturing standard size dwellings using a satellite manufacturing facility that can be erected on or near a large housing development to efficiently manufacture standard size dwellings, substantially in their entirety, in a factory environment using subassemblies manufactured at one or more other facilities and/or materials supplied from one or more other sources, prior to transporting and placing these completed dwellings on pre-constructed permanent foundations.
- the present residential construction industry can be divided into segments based on the three basic methods which are utilized to produce dwellings: manufactured or modular (manufactured), panelized or component (panelized) - with elements fabricated both on and off site, and individually built (stick-built) - with dwelling construction in-place at a specific building site.
- manufactured or modular manufactured
- panelized or component panelized
- individually built stick-built
- a common goal of the residential construction industry is to produce quality dwellings that have broad market appeal in a cost efficient manner.
- the manufactured home is built in a factory which is geographically remote from a housing development or a particular building site.
- the factory produced modules must be transported over public highways and roadways to a dealership or pre-determined building site.
- the earliest of this class of homes were called mobile homes. They were, and still are, equipped with axles attached to an undercarriage framework.
- the typical manufactured home is built in a factory which serves a broad geographic region, ranging in size from tens or hundreds of miles in radius to several states. Because of the cost efficiencies inherent in factory production, the manufactured (and some panelized) method is successful in producing lower cost new housing typically for small size homes which are often in a rural setting.
- a manufactured home is produced for direct sale to a customer
- This invention relates to a system for manufacturing standard size dwellings using a satellite manufacturing facility that can be erected on or near a large housing development to efficiently manufacture standard size dwellings, substantially in their entirety, in a factory environment using subassemblies manufactured at one or more other facilities and/or materials supplied from one or more other sources, prior to transporting and placing these completed dwellings on pre-constructed permanent foundations.
- the present residential construction industry can be divided into segments based on the three basic methods which are utilized to produce dwellings: manufactured or modular (manufactured), panelized or component (panelized) - with elements fabricated both on and off site, and individually built (stick-built) - with dwelling construction in-place at a specific building site.
- manufactured or modular manufactured
- panelized or component panelized
- individually built stick-built
- a common goal of the residential construction industry is to produce quality dwellings that have broad market appeal in a cost efficient manner.
- the manufactured home is built in a factory which is geographically remote from a housing development or a particular building site.
- the factory produced modules must be transported over public highways and roadways to a dealership or pre-determined building site.
- the earliest of this class of homes were called mobile homes. They were, and still are, equipped with axles attached to an undercarriage framework.
- the typical manufactured home is built in a factory which serves a broad geographic region, ranging in size from tens or hundreds of miles in radius to several states. Because of the cost efficiencies inherent in factory production, the manufactured (and some panelized) method is successful in producing lower cost new housing typically for small size homes which are often in a rural setting.
- a manufactured home is produced for direct sale to a customer
- a plurality of manufactured modular segments may comprise the finished home and the modules are transported from a remote factory to a dealership or destination building site. Once delivered to the final building location, the modules are joined together to form a resultant dwelling that is significantly larger than a typical 12' x 70' single module manufactured home.
- the major advantage of manufactured homes is the use of a factory environment. Within a factory setting, a controlled environment exists where complete, roadable dwellings are built. Factories represent a significant advantage in mass production efficiency. The advantages of a factory environment are: Dwellings can be produced very quickly from order to finished product.
- Time savings is a marketing advantage and a source of cost savings in terms of the financing costs associated with the resources tied up in the dwelling.
- Foul weather has negligible impact on production. Construction tolerances are more precise and more controllable, resulting in better overall product quality. Increased production through multiple shifts is readily achievable because the critical conditions of lighting, ventilation, and air temperatures are controlled 24 hours a day.
- Non-sequential construction techniques are possible.
- a Federal (HUD) Building Code can be utilized which offers a streamlined regulatory environment since it is focused on performance standards rather than implementation standards.
- homes built to the HUD Building Code are less expensive to produce than stick-built homes which are built to the Uniform Building Code (UBC) or other local building codes.
- UBC Uniform Building Code
- a method of dwelling construction which has similarities to the manufactured dwelling technology is the panelized method of construction.
- Panelized construction consists of a system for prefabricating walls, floors, and roof components into units or sections. This method of construction is most efficient where there is a repetition of the panel types and dimensions. Panels are manufactured using a jig, into which the framing members are placed and then interconnected via nails, screws, or welds. The interior and/or exterior sheathing, or even the complete interior or exterior finish, may be applied to the wall panel prior to the finished panel being hoisted onto the structure. Shop panelization offers numerous advantages. The panel shop provides a controlled environment where work proceeds regardless of weather conditions. The application of sheathing and finish work is easier and faster with the panels placed in a horizontal position instead of a vertical position.
- panelized construction major components of homes are either prefabricated in a remote factory environment or at the site where, unfortunately, panel installation is exposed to local weather conditions. If components or panels are built in a factory, they are subsequently transported over public highways and roadways to the building site where they are hoisted into place and interconnected to form the basic dwelling structure using conventional building techniques.
- the panelized construction technique requires the use of hoisting equipment at the building site to handle the preassembled components and also requires that significant amounts of finish work be performed at the site to assemble components and finish construction joints between panels and then to apply all finishes that were not included in the panels or components.
- the major advantages of panelized construction are the following: Cost and production efficiencies of off-site factory panel fabrication. Cost reductions from mass producing panels at a project location can also be realized.
- Stick-built construction requires a sequenced building format, where item A must be completed before item B can begin, and in turn, item B must then be completed before item C can begin and so on.
- item A must be completed before item B can begin
- item B must then be completed before item C can begin and so on.
- the ground level walls must be completed before the second level floor can begin, and the second level walls must be completed before the second level ceiling can begin.
- Stick-built dwellings can be built to any size or layout that is desired within the limitations of the structural capabilities of the framing material. Multi-story
- the panels or components that are manufactured require major field assembly which takes a significant amount of time and are therefore exposed to local weather conditions.
- the panels built in a remote plant have size limitations because of the necessity to transport these panels over public highways and roadways.
- the panelized method of construction only accelerates the framing segment of the construction, which represents only an incremental time savings on what presently is a several week portion of a 3 to 8 month project.
- the panels must be assembled at the project site, and construction joints between the panels must be repaired and finished at the project site.
- Stick-built construction is inherently a sequential home building process - floor are built before walls, walls before ceilings, and the roof after all the other framing is completed. This is a lengthy process and therefore results in construction activity of extended duration.
- the materials and supplies are mostly hand carried, piece-by-piece, into and within the house during construction.
- a significant disadvantage of the stick-built dwelling construction technique is that, regardless of the size and/or complexity of the dwelling, these homes are built according to a process that is determined by both building codes and the need for efficiency of the various independent subcontractors that are engaged to construct the dwelling.
- each subcontractor wishes to minimize the number of times that he must visit the building site and often prefers unobstructed access to the majority of the structure with limited interference or coordination with other subcontractors.
- This construction process especially early on, is highly dependent on weather conditions and can only occur during daylight hours.
- An interruption in the flow of construction caused by one of the subcontractors has a ripple effect in that the other subcontractors must await the completion of a particular task before they can begin their work.
- the above-described problems are solved, and a technical advance is achieved, by the system for manufacturing standard size dwellings which uses a satellite manufacturing facility that is capable of efficiently producing standard size dwellings in a factory environment.
- This manufacturing system uses a network of manufacturing facilities to respond to the fundamental desire to maximize home building efficiency by implementing both a factory for and a method of standard size dwelling construction that is of novel design.
- the system for manufacturing standard size dwellings comprises a network of facilities, sited to maximize the efficiency of the product and materials flows.
- one or more manufacturing facilities are used to manufacture subassemblies and supply materials for use in assembling a standard size dwelling in a factory environment. These manufactured subassemblies and materials are transported to one or more satellite manufacturing facilities, each of which are located proximate to a location where a large number of dwellings are to be built.
- the satellite manufacturing facilities function to integrate the received
- the satellite manufacturing facilities can optionally manufacture subassemblies, such as a roof subassembly, where appropriate as part of the dwelling assembly process.
- the satellite manufacturing facility is thereby capable of producing standard size dwellings and supplying them to a new community in a cost effective and time efficient manner unlike any construction method of the prior art.
- the satellite manufacturing facility not only overcomes the problems inherent in the construction methods of the prior art, but also combines the advantages of the three methods of dwelling construction identified previously. Dwellings produced within the satellite manufacturing facility appear to the consumer to be identical to stick-built standard size dwellings.
- the dwellings that can be produced utilizing the satellite manufacturing facility are unlike any manufactured dwellings produced today. These dwellings may include a wide diversity of standard size one- and two-story single family dwellings or various forms of multi-family dwellings.
- a major attribute of the satellite manufacturing facility is its ability to build a huge diversity of dwelling products. The only thing required is a community of sufficient size to amortize the cost of the satellite manufacturing facility. This flexibility is essential for international applications because housing design and requirements are vastly different from one region to the next.
- a common ingredient is that most often in bulk housing requirements, high-quality, low-cost dwellings that can be built in a timely fashion are in demand.
- the satellite manufacturing facility is a specialized manufacturing facility erected proximate to a location where a large number of dwellings are to be built.
- the satellite manufacturing facility may be linked to this community via a controlled access roadway, where public access can be limited and where width and height impediments may be much less restrictive than public streets and where distances from the satellite manufacturing facilities to the locations at which the assembled dwellings are to be sited are short.
- a controlled access roadway where public access can be limited and where width and height impediments may be much less restrictive than public streets and where distances from the satellite manufacturing facilities to the locations at which the assembled dwellings are to be sited are short.
- the dwellings to be produced using the satellite manufacturing facility have special design characteristics.
- One example is an integral base frame comprising a structural base element located at the perimeter of each dwelling, and at the base of load bearing interior walls, which strengthens and stabilizes these standard size dwellings for manufacturing, transportation, placement on foundations, and long-term durability.
- One important feature of the satellite manufacturing facility is that the sequential building process necessary with the prior art of stick-built methods for producing standard size dwellings is now obsolete.
- Subassembly hoisting equipment such as clear span bridge cranes, are the key to material handling and transportation in the staging areas in the satellite manufacturing facility.
- Semi-trucks with loaded trailers may enter the main structure of the satellite manufacturing facility to promote highly efficient unloading and subsequent material handling directly from bulk truck shipments to the staging areas or storage areas via the subassembly hoisting equipment.
- the hoisting equipment can also place large rolls of carpeting, appliances, cabinets and the like directly inside the partially manufactured dwelling to eliminate excess labor.
- the satellite manufacturing facility represents a radical new approach to building standard size dwellings on a large scale basis.
- the satellite manufacturing facility not only overcomes the problems inherent in the construction methods of the prior art, but also combines the advantages of the three methods of dwelling construction identified previously. The result is that standard size dwellings can be built substantially faster, with higher quality, less cost, and more efficiently than comparable homes built on-site by use of prior art construction methods.
- Figure 1 illustrates a perspective view of a prior art integrated standard size dwelling manufacturing facility sited at a residential housing development
- Figure 2 illustrates a perspective view of the prior art integrated standard size dwelling manufacturing facility of Figure 1 with the roof removed therefrom
- Figure 3 illustrates a typical network of manufacturing facilities used to implement the present system for manufacturing standard size dwellings
- Figures 4 - 6 illustrate typical implementations of the various staging areas contained in a typical embodiment of the satellite manufacturing facility of the present system for manufacturing standard size dwellings
- Figure 7 illustrates a perspective view of the architecture of a typical transport element used in this manufacturing process and its actual use to transport a standard size dwelling
- Figure 8 illustrates a perspective view of a typical integral base frame used in the manufacturing process.
- Glossary The terms used in this description are defined below to ensure that the proper import is ascribed to these terms and the usage of these terms is therefore unambiguous.
- the master production facility may or may not be located proximate to a community where the dwellings produced are to be located.
- Satellite Manufacturing Facility the facility described herein which is used to produce standard size dwellings in a hoisting supported production environment, which can comprise one or more enclosed structures or other work areas. Dwelling - a structure(s), typically comprising either a single family or multi-family home, which is used to house individuals.
- Integral base frame that structural element which is integral to the base of a satellite manufacturing facility produced standard size dwelling, and provides the foundation upon which the floor and wall framing elements for the dwelling are attached.
- the integral base frame provides the structural integrity which allows a standard size dwelling to be created in its entirety and moved prior to being located on a permanent foundation.
- the integral base frame is typically provided at the base of the outside bearing perimeter walls, at interior load bearing walls, at selected other locations, and may be contained within a floor subassembly.
- Manufactured home - a home built in a factory environment and transportable over public highways to a building site. These homes include trailer homes, modular homes, and dwellings comprising a plurality of limited size segments that are transported to the building site and which may be joined together.
- the present system for manufacturing standard size dwellings comprises a network of facilities, as shown in Figure 3, sited to maximize the efficiency of the product and materials flows.
- one or more master manufacturing facilities are used to manufacture subassemblies for use in assembling a standard size dwelling in a factory environment and/or process and distribute materials.
- These manufactured subassemblies and materials are transported to one or more satellite manufacturing facilities, each of which are located proximate to a location where a large number of dwellings are to be built.
- the satellite manufacturing facilities function to integrate the received subassemblies and materials together to create a standard size dwelling, which is then transported to the foundation
- the satellite manufacturing facilities can optionally manufacture subassemblies, such as a roof subassembly, where appropriate as part of the dwelling assembly process. In this manner, a plurality of less costly satellite manufacturing facilities can be used in conjunction with one or more master production facilities to maximize home building efficiency and economy.
- FIG 1 illustrates a perspective view of the prior art manufacturing facility described in the above-noted patents, which is sited at a residential housing development
- Figure 2 illustrates a perspective view of the prior art manufacturing facility of Figure 1 with the roof removed therefrom.
- the manufacturing facility 100 disclosed therein comprises a building of sufficient size to encompass the dwelling production operation and of height to provide sufficient clearance for the constructed dwelling, which is typically 30 feet to 40 feet in height.
- the manufacturing facility has two large doorways in the end thereof 101 , 102, with a first doorway 101 as shown in Figure 1 being on the leftmost side of the building and used to provide transport element ingress to the manufacturing facility 100.
- a second large exterior door 102 is located on the opposite side of the end wall of the building and is used to provide ingress to delivery vehicles which are providing the raw materials to a delivery alley, located within the manufacturing facility, for the assembly of the residential structures that takes place within the manufacturing facility 100.
- Figure 1 also illustrates a completed standard size dwelling D traversing a path through the community to a building site B that has a foundation in place and at which building site B a crane C awaits the arrival of the standard size dwelling D.
- the crane C is used to lift the completed standard size dwelling D off the transport element T and to place the structure D on the pre-existing foundation where it is secured in place.
- the pre-existing foundation can be a three-sided structure and the transport element can enter the basement area of the foundation where the transport element can be removed from under the completed dwelling as the dwelling is set on the foundation.
- the transport elements T shown in Figure 1 typically comprise a "trailer” or “frame” that is equipped with a roadable apparatus, such as sufficient number of axles and wheels to support the weight of the completed standard size dwelling D.
- the bed of the trailer T is of extent great enough to securely support the completed standard size dwelling D, which is built in stages on the transport element T as the transport element T is moved from the ingress doorway 101 of the manufacturing facility 100 to the egress doorway.
- a tow vehicle such as a tractor, is used to move the transport element T and the completed standard size dwelling D from the egress doorway of the manufacturing facility 100 to the building site B and thence to return the transport element T to a parking area adjacent the manufacturing facility 100 for use in a subsequent residential structure assembly.
- the community can be occupied in stages as the standard size dwellings are manufactured and sited. Public access to the community is typically selected at a location distant from the manufacturing facility 100, such that dwellings are sited from this juncture incrementally to the manufacturing facility 100.
- the manufacturing facility 100 makes use of temporary roadways R, which are restricted from public use and are available to transport the completed standard size dwellings D from the manufacturing facility 100 to the building site B.
- -16- sections of the roadways R are filled with completed dwellings, these sections can be converted from restricted/controlled access construction use to public use.
- the siting of the manufacturing facility 100 is such in the particular environment illustrated in Figure 1 that the completed standard size dwellings D traverse roads R internal to the development and therefore do not have to contend with existing public roadways with their size and weight limitations, power lines, bridges, and existing traffic. It is also possible to erect the manufacturing facility 100 at a site that requires the use of existing public roads, which is feasible as long as the portions of the existing roadway that are used are free of obstructions and can be monopolized during the movement of a completed standard size dwelling D.
- Prior Art Manufacturing Facility Architecture The economic viability of the prior art manufacturing facility 100 is a function of the efficiency with which it can produce the residential structures, since the efficiency must offset the cost of erecting the manufacturing facility 100 at a particular housing development site. It is obvious that the benefit afforded by this manufacturing facility 100 is a function of the number of building sites B, the incremental cost savings associated with each unit manufactured, and the speed with which these sites can be populated with residential structures.
- the manufacturing facility 100 achieves its efficiency by collapsing the linear, mutually exclusive building trades operation of the prior art into an intensive volumetric focus in the residential structure assembly process. This difference in assembly philosophy as well as the use of hoisting elements that are used in the manufacturing facility 100 provides the efficiencies and "automation" that assist in making this project cost-effective.
- the unique integral base frame that is used as the underpinnings of each standard size dwelling D that is assembled not only enables the completed structure to be constructed, transported, and placed on an irregular field poured concrete foundation but also provides a base for the standard size dwelling D that is of greater stability and rigidity than existing methods of manufacture.
- the manufacturing facility 100 is oriented as shown in Figure 2 which is a
- the first subassembly production line P1 produces an integral base frame which is positioned on a transport element T.
- the second P2 and third P3 subassembly production lines build and subsequently relocate the preassembled panel subassemblies, including two-story high wall panels, onto the floor subassembly.
- the fourth subassembly production line P4 produces and places a full size roof subassembly onto the partitions previously produced and installed in the partially completed standard size dwelling D.
- the manufacturing facility 100 shows the use of a plurality of parallel oriented juxtaposed subassembly production lines P1-P5, each of which is used to create subassemblies and/or to provide warehousing of materials that are used in the construction process.
- Orthogonal to and aligned at one end of this plurality of subassembly production lines is a "delivery alley" DA through which the delivery vehicles pass to deliver the raw materials that are used in the standard size dwelling assembly process.
- the delivery alley DA typically extends the full length of the manufacturing facility 100 and is of sufficient dimensions that delivery vehicles can drive through the manufacturing facility 100 to park adjacent the subassembly production line which is the destination for the materials provided by the delivery vehicle.
- a hoisting element H* integral to that subassembly production line P* is then able to quickly offload the raw materials from the delivery vehicle and the delivery vehicle then exits the manufacturing facility 100 at an egress door 106 distal from the ingress door 102 through which it entered the manufacturing facility 100.
- Juxtaposed to and orthogonal to the plurality of subassembly production lines P1-P5 and at the end thereof opposite the delivery alley DA is a dwelling assembly alley HA wherein the raw materials and subassemblies produced in each subassembly production line P* are assembled in an integrated manner into the standard size dwelling D.
- Each subassembly production line P* takes raw materials and either produces subassemblies that are lifted by the hoisting elements H* onto the standard size dwelling D that is being assembled or provides a warehousing capability for the various raw materials that are used to create the
- each subassembly production line P* is responsible for the complete construction of a volumetric section of the standard size dwelling D or is used to complete the finished work within the standard size dwelling D that has been largely completed at the prior stages of the construction process.
- a floor subassembly is produced and loaded on the transport element T.
- the floor subassembly includes an integral base frame which strengthens the floor subassembly to allow for the construction, transportation and setting of the standard size dwelling D on its foundation.
- the second P2 and third P3 subassembly production lines continuing to the right from the first subassembly production line P1 , large wall panels are framed, sheet rocked, finished, painted and inventoried on racks prior to installation on the appropriate floor subassembly. Windows and doors are installed in the panelized wall subassemblies in the second P2 and third P3 subassembly production line.
- full size roof subassemblies are fabricated on the floor of the manufacturing facility 100 and then hoisted and placed on the framed partially completed standard size dwelling D by the bridge crane H4. Finish work, including panel joint finishing, cabinets, floor covering, fixtures, etc., begins in the second subassembly production line P2, continues through the fourth subassembly production line P4 and is the primary activity implemented in the fifth subassembly production line P5.
- a strategic accomplishment of the manufacturing facility 100 is to provide a large scale factory in which multiple subassembly production lines P* exist and which can be utilized to produce incremental aspects of a standard size dwelling D.
- the manufacturing facility 100 makes bulk materials available to all of the subassembly production lines P*, which capability is provided in the embodiment shown herein by the delivery alley DA, which serves all the subassembly production lines P * .
- the delivery alley DA which serves all the subassembly production lines P * .
- -19- consideration is that a plurality of subassembly production lines P* are used, each of which produces a distinct increment of the standard size dwelling D.
- a dwelling assembly alley HA is used to relocate the partially completed standard size dwelling D from one subassembly production line P* to the next sequential subassembly production line P * typically via the transport element T on which the standard size dwelling is constructed.
- a third consideration is the use of high capacity hoisting elements H * in the subassembly production lines P* to allow for the unloading and movement of bulk materials and for the construction and handling of large subassemblies, including the installation of the subassemblies in a partially completed standard size dwelling D.
- the manufacturing facility 100 is housed within a steel frame building that uses a plurality of steel bents to support the roof as well as the hoisting elements H* that are part of the manufacturing facility 100.
- the bents are aligned with the boundaries of each subassembly production line P* and are of sufficient structural integrity to also support the hoisting elements H* and the loads which they service.
- the bents are typically supported by a plurality of columns, located at regular intervals along the length of the bent, with a free span being provided across the width of the dwelling assembly alley HA as well as the delivery alley DA.
- the dwelling assembly alley HA must be dimensioned to accommodate the full extent of the completely assembled standard size dwelling D. These dimensions would typically be a 30-40 foot floor to bent clearance and a support column to support column free span of approximately 60 feet.
- the rails that support the hoisting elements H* are attached to the columns and can also be hung from the bents in the clear span area to provide support for the rails where the span between columns is greater than otherwise would be allowable for the load bearing capacity of the rails.
- the area of coverage by the hoisting elements H* within a subassembly production line P* can overlap so that each hoisting element H* has a sufficient range of travel to provide the greatest flexibility in use in that subassembly production line P*, thereby enabling tasks to be performed by one hoisting element when the other hoisting element is occupied performing another task.
- Architecture of the Satellite Manufacturing Facility The integrated production of standard size dwellings in a single manufacturing facility that is illustrated in Figures 1 & 2 is segmented in the present system for manufacturing standard size dwellings, which comprises a network of facilities, as shown in Figure 3, sited to maximize the efficiency of the product and materials flows.
- a portion of the manufacturing and assembly processes is implemented in the satellite manufacturing facilities 300-303, each of which is sited at a respective residential housing development, and some or all of the subassembly manufacturing processes and materials preparation/handling are implemented in the one or more master production facilities 311-312.
- a description of typical subassembly production processes are contained in the above-noted U.S. Patent No. 6,000,192 titled “Method of Production of Standard Size Dwellings" and U.S. Patent No. 6,253,504 titled "Manufacturing Facility for Production of Standard Size Dwellings," and will not be reproduced herein for simplicity of description. What is described herein are the various architectures and implementations of the satellite manufacturing facility 300 that can be used to utilize the subassemblies and materials produced at the master production facilities 311-312.
- the satellite manufacturing facilities 300-302 use hoisting
- the master production facilities 311-312 function to manufacture subassemblies and prepare materials for use in the plurality of satellite manufacturing facilities 300-302.
- a master production facility 311 can supply all of the subassemblies and materials used by a satellite manufacturing facility 301 or can provide a subset of the subassemblies and materials used by a satellite manufacturing facility 300, 302.
- the plurality of satellite manufacturing facilities 300-302 may receive materials and/or subassemblies from other sources for use in the dwelling manufacturing process.
- Each of the implementations of the satellite manufacturing facility 300 comprise one or more staging areas, into which are transported the subassemblies produced by the master production facilities 311-312 and/or which are used to create subassemblies, and/or which are used to stage finish materials.
- the staging areas disclosed in Figures 4 - 6 are shown as examples of the geometries that can be used to implement the production process, but these are simply examples and other configurations can be used to implement the present system for manufacturing standard size dwellings, as defined by the attached claims.
- Each satellite manufacturing facility 300-302 is typically located as shown in
- FIG 1 which depicts a variety of the dwellings which can be constructed, including single family detached homes S as well as three-story multi-family units M, to illustrate the flexibility of the production capabilities of the satellite manufacturing facilities.
- the multi-story dwellings M can be produced as a combination of a two-story component with an overall floor area of a standard size dwelling, with a similarly sized single story component produced for the third floor and placed on top of the two-story component by a crane.
- each manufacturing facility is erected in close proximity to a large number of building sites B, some of which are shown in Figure 1 as having residences sited thereon, others having foundations pre-constructed in place and others outlined as lots with no construction work having taken place.
- FIGS. -22- Figures 4-6 illustrate typical implementations of the various staging areas contained in a typical embodiment of the satellite manufacturing facility 300 of the present system for manufacturing standard size dwellings.
- a plurality of staging areas are disclosed and the functions implemented in these staging areas may be combined, modified, eliminated as the needs of the dwelling being produced and the economies of the process may dictate.
- the number and nature of the process steps disclosed herein are mapped to those disclosed in the above-noted patents for simplicity of understanding of the architectures disclosed herein, since the detailed descriptions contained in these patents may be used for illustration.
- Transport Element Figure 7 illustrates in perspective view a typical transport element T that is used to support the standard size dwelling D as it is assembled in the satellite manufacturing facility 300 and transported from this facility to a permanent site.
- the transport element T as shown in a typical embodiment in Figure 7, comprises a rectangular frame formed of a plurality of rigid interconnected supporting members T1-T5. A number of the supporting members T1-T4 form the substantially rectangular exterior frame and the remaining supporting member T5 forms an interior supporting member.
- a standard size dwelling is shown in dotted line outline form placed on the transport element T to illustrate the size and extent of the transport element T with respect to a standard size dwelling.
- the typical supporting members T1-T5 are shown as steel I-beams of sufficient capacity to ' support the standard size dwelling.
- Three of the supporting members T1 , T3, T5 are shown equipped with wheel assemblies W to thereby enable the transport element T to be repositioned within the satellite manufacturing facility 300 and thence to the building site with the standard size dwelling placed on the transport element.
- Figure 7 also illustrates a towing hitch PH affixed to one end of the substantially rectangular frame formed of supporting members T1 -T5 to thereby enable a tow vehicle to connect to
- the transport element T and perform the transportation function.
- the transport element T can be devised, such as having axles span the entire width of the transport element, as a function of the performance characteristics required for the specific implementation of the satellite manufacturing facility 300 as well as the nature of the path that the transport element may take to the building site.
- the wheel assemblies W can be made removable from the frame formed of supporting members T1-T5.
- the transport element can comprise the integral base frame FF of the structure itself, with the wheel assemblies W initially installed thereto to facilitate the movement of the standard size dwelling through the manufacturing process and delivery to the building site.
- the integral base frame is that structural element which is integral to the base of a satellite manufacturing facility produced standard size dwelling, and provides the foundation upon which the floors and vertical framing elements for the dwelling are attached.
- the integral base frame allows a standard size dwelling to be created in its entirety and moved prior to being located on a permanent foundation.
- the integral base frame is typically provided at the base of the outside bearing perimeter walls, at interior load bearing walls, at selected other locations and may be contained within a floor subassembly.
- the standard size dwelling is built with an integral base frame to enable the simple relocation of the partially built dwelling within the satellite manufacturing facility and eventually to a permanent foundation at the dwelling site.
- the dwelling can also be later moved without significant complexity, since the structure incorporates the integral base frame and can be
- the standard size dwelling built in the satellite manufacturing facility is substantially built "in space” rather than "in place".
- the initial step in the manufacturing process requires the use of the integral base frame which establishes a solid point of beginning and provides a dimensionally stable foundation.
- the integral base frame thereby provides structural integrity to the base of the satellite manufacturing facility manufactured dwelling, which enables the dwelling to exist in space without continuous additional support to enable the standard size dwelling to be manufactured, transported and placed on a permanent foundation as an integral, self-supporting and rigidized structure.
- the integral base frame distributes vertical loads downward from the wall sections to the transport element and upward from the transport element to the load bearing walls.
- the integral base frame also provides a dimensionally stable flat surface on which the floor and wall elements can be added and can be manufactured from light gauge steel, standard steel sections, wood, concrete, plastic, or other suitable materials.
- Figure 8 illustrates in perspective view a typical architecture of the integral base frame assembly FF that is used in the standard size dwelling manufacturing process.
- the integral base frame FF is the element that circumscribes the entirety of the standard size dwelling D and provides the support and stability to enable the entire completed structure to be relocated by a crane C or by beams and rollers from a transport element T to the preassembled foundation at the building lot B.
- the integral base frame FF comprises a set of steel beams, such as I-beams or steel tubes, which are assembled into a framework that conforms to the foundation.
- the I-beams or steel tubes as shown in Figure 8, are assembled by welding together or bolting to form a framework onto which a floor joist assembly FJ can be fabricated. Additional precut I-beams or steel tubes are positioned to cap the open ends of the partially assembled integral base frame FF and complete an entire section of the floor subassembly.
- the joists FJ are secured to the integral base frame FF via welds, bolts, screws, shot pins and the like, at points where one of the steel joists FJ meet a corresponding point of the integral base frame FF.
- -25- joists FJ are preferably selected so that the joists snugly fit within the "pocket" created by the cross-section of the integral base frame elements and the capped integral base frame FF creates a resultant dimensionally stable and rigid floor subassembly.
- the floor sheathing FS as shown in Figure 8, is placed to expose a length of the joists FJ sufficient to fit within the pocket provided by the integral base frame FF, so the assembled floor subassembly does not include any voids between the floor sheathing FS and the integral base frame FF.
- the steel tubes may be used to create an integral frame on top of which the floor joists are placed, where they are easy to install and articulate into flexible forms.
- Figures 4 - 6 represent several configurations of the satellite manufacturing facility 300.
- Figure 4 illustrates a typical linear flow of the manufacturing process where the dwelling is assembled in a plurality of stages, with each location L1-L5 in the satellite manufacturing facility 300 being served by an associated staging area PIPS, or in some cases a single staging area P5 can serve several locations L4A, L5 as shown in Figure 4.
- the roof subassembly is shown as being manufactured on site at the satellite manufacturing facility 300, rather than being delivered as a complete subassembly, due to the typical size of a roof subassembly.
- the roof subassembly is implemented in a plurality of stages in locations L4A, L4B, which feed the final roof install location L4 where the completed roof subassembly is placed on the framed partially constructed dwelling that has been moved from location L3 to location L4.
- the dwelling is assembled in stages, at each of locations L1-L5, and the collection of these locations L1-L5 is termed an assembly alley HA herein for convenience herein. There need not be a dedicated assembly alley, and the location of the dwellings in
- the roof subassembly construction may be implemented external to the building that houses other portions of the dwelling assembly, with the roof being installed on the partially assembled dwelling either within or external to the building that houses other portions of the dwelling assembly, with the external installation reducing the height requirement of the building.
- the finish work shown as being implemented at location L5 can be done within another building, external to a building, and possibly at a site distant from the building that houses other portions of the dwelling assembly.
- the linear flow of the process shown in Figure 4 can be implemented in the configuration shown in Figure 5, where multi-purpose staging areas P1-P2 serve dwelling assembly L1 , L2 and roof subassembly fabrication L4B, L4A locations.
- Staging areas P3 and P5 serve locations L3 and L5, respectively to provide subassemblies and materials for the process steps implemented therein.
- the dwelling assembly takes place at various locations within the satellite manufacturing facility 300 and this configuration can even be used to support two dwelling assembly processes, where locations L4B, L4A, L4 are used for the functions designated for locations L1-L3, while location L5 comprises a location where the roof subassembly is fabricated.
- the roof install can take place at locations L3, L4 and the dwelling can exit the satellite manufacturing facility 300 for
- FIG. 6 illustrates a single linear flow of the dwelling assembly process, where the roof subassembly can take place in staging area P4, for installation at location L4.
- the staging areas P1-P5 can each be used for the complete assembly of a dwelling in the associated locations L1-L5, rather than relocating a partially assembled dwelling between locations L1-L5.
- five dwellings can be simultaneously assembled.
- hoisting apparatus are used to move, lift and place the base frame, floor subassemblies, wall subassemblies, prefabricated kitchen/bathroom modules, roof subassembly, and any other components or materials.
- the centralized fabrication of subassemblies and/or the processing of materials into "cut lengths" and/or the staging of components and materials at the master manufacturing facilities 311 , 312 provides economic and efficiency advantages, where the master manufacturing facilities 311 , 312 can feed numerous satellite manufacturing facilities 300-302, where the assembly of the dwelling takes place, using hoisting apparatus to implement this process.
- the first staging area P1 of the satellite manufacturing facility 300 is primarily used to create the floor subassembly, which as a minimum includes the residential integral base frame described above, and can also include the floor joist assembly and sub-flooring as described above.
- the floor platform subassemblies are then typically placed on to beams and rollers of the transport element T that is positioned in the dwelling assembly alley HA of the satellite manufacturing facility 300.
- An integral base frame assembly staging area may be included in the first staging area P1 and the partially assembled integral base frames are used to create a subassembly of floor joists, with insulation, wiring, plumbing installed therein and the overlay of floor sheathing installed thereon.
- the floor joist subassemblies are transported and placed on the transport element T in a predetermined position and
- the second staging area P2 of the satellite manufacturing facility 300 is primarily used to fabricate the exterior walls and first floor interior walls of the standard size dwelling D.
- a wall panel assembly staging area is included in the second staging area P2 to store subassemblies of an exterior or interior wall, with insulation, wiring, plumbing, windows, doors installed therein as desired. Workers can tape drywall seams, finish the drywall, and paint the wall subassembly, if not already done.
- the finished wall subassembly is then relocated to storage racks located in the second staging area P2 or directly placed in position and secured in the dwelling D being assembled in the dwelling assembly alley HA in a predetermined position and interconnected with other wall subassemblies to create a complete framed and subfloored structure assembly.
- the exterior finish may not be present on the exterior walls to thereby enable the workers to access the various utilities that are run through the walls. As wall segments are joined, the utilities pre-installed therein must be interconnected, and this can be done via access from the exterior (or top) of the wall, rather than the interior as is presently done.
- the multitude of subsystems that comprise a dwelling are treated as an integrated system with the progression of construction of each subsystem coordinated with the various other systems to ensure coherent construction of the dwelling in an efficient manner.
- reduce the handling of materials, cabinet assemblies, doors, windows, floor coverings etc. can be pre- stocked in the shell of the standard size dwelling D.
- the pre-stocking enables the workers at later stages of assembly to have the necessary materials already situated within the standard size dwelling D, via hoisting element H2, to enable the workers to perform finish work concurrently with the second story and the roof being assembled and installed on the standard size dwelling D.
- the materials, such as drywall can be of dimensions greater than typically used since the hoisting element H2 can be used to transport these materials, rather than depending on the workers
- Third Staging Area The third staging area P3 is predicated on the presumption that the standard size dwelling being manufactured is a two story dwelling. Obviously, if one story dwellings are being manufactured, the third staging area P3 as described herein may be deemed to be unnecessary.
- the equipment (such as hoisting apparatus H3) and work areas of the third staging area P3 are similar to those of the second staging area P2.
- Fourth Staging Area The fourth staging area P4 of the satellite manufacturing facility 300 is primarily used to fabricate, relocate and install the roof subassembly of the standard size dwelling D.
- This staging area if used to manufacture a roof subassembly may comprise a series of areas P4A-P4C, each of which is used to fabricate a portion of the roof subassembly or a plurality of roof subassemblies.
- the roof fabrication can be implemented external to the building that houses the satellite manufacturing facility.
- the equipment and work areas of the fourth staging area P4 typically comprise at least one raw material processing stage.
- standard lengths of framing members and roof truss members are delivered to the fourth staging area P4.
- a roof subassembly staging area is included in the fourth staging area P4. The roof subassembly is then hoisted into place on top of the framed shell of the two story structure and thus must be constructed somewhat differently from existing roof designs.
- the trusses used to fabricate the roof subassembly must be designed to support both dynamic and static traditional roof loads, supported by the frame of the house, as well as to be capable of supporting the weight of the assembled roof when it is being hoisted. Therefore, the roof trusses must be designed to account for compression and tension loads in all conditions.
- the overhead crane H4 transports the completed roof subassembly from the roof subassembly fabrication areas L4B, L4A to the dwelling assembly
- the fabrication of the roof subassembly on the roof subassembly fabrication areas results in a reduced assembly time, since working on ground level is easier, safer and more efficient than constructing the roof in place on the framed two story dwelling as is presently done in the stick building technology.
- Fifth Staging Area The fifth staging area P5 of the satellite manufacturing facility 300 is used to perform all remaining finish work that was not completed in the previous manufacturing stages.
- the fifth staging area P5 may not strictly be termed a staging area since no subassembly is produced therein, but instead, in the preferred embodiment of the satellite manufacturing facility 300, it is used as a storage and staging area where the pre-stocking materials, such as floor covering, are stored and cut to size for transportation to the appropriate staging area for insertion into the partially competed dwelling located in the dwelling assembly alley HA, as described above. Therefore, the finish work includes any remaining painting, installation of plumbing fixtures, electrical outlets, trim work, appliance installation, etc. Additional exterior work that was not previously completed is now done, such as gutters, roofing, flashing, exterior trim painting, etc. The materials for these activities can be stored in a plurality of rows of high bay storage racks.
- the materials handled in the fifth staging area P5 of the satellite manufacturing facility 300 may be more adapted to processing using a forklift truck rather than an overhead crane.
- the dwelling assembly alley HA may not be contiguous with the fifth staging area P5, since there is not necessarily any relocation of large bundles of materials to the dwelling at this stage of production. Therefore, the dwelling can even be moved at this juncture to a section of the building remote from the staging areas P1-P4, or "off-site" external to the building to another enclosed structure, or even in an open area outside.
- the benefits of the satellite manufacturing facility are that the standard size dwellings produced in the satellite manufacturing facility represent significant advances from what is produced by the housing industry today. It is achieved by collapsing the traditional sequential building process into a small finite number of steps, each of which is implemented in a predetermined staging area of the facility somewhat independent of, yet in close coordination with, the building activity that takes place in the other staging areas of the facility.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2005240968A AU2005240968A1 (en) | 2004-04-26 | 2005-02-18 | System for production of standard size dwellings using a satellite manufacturing facility |
MXPA06012355A MXPA06012355A (en) | 2004-04-26 | 2005-02-18 | System for production of standard size dwellings using a satellite manufacturing facility. |
CA002563031A CA2563031A1 (en) | 2004-04-26 | 2005-02-18 | System for production of standard size dwellings using a satellite manufacturing facility |
EP05713868A EP1740782A1 (en) | 2004-04-26 | 2005-02-18 | System for production of standard size dwellings using a satellite manufacturing facility |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/832,745 | 2004-04-26 | ||
US10/832,745 US20050235581A1 (en) | 2004-04-26 | 2004-04-26 | System for production of standard size dwellings using a satellite manufacturing facility |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2005108695A1 true WO2005108695A1 (en) | 2005-11-17 |
Family
ID=34961083
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2005/005429 WO2005108695A1 (en) | 2004-04-26 | 2005-02-18 | System for production of standard size dwellings using a satellite manufacturing facility |
Country Status (8)
Country | Link |
---|---|
US (1) | US20050235581A1 (en) |
EP (1) | EP1740782A1 (en) |
CN (1) | CN101300393A (en) |
AU (1) | AU2005240968A1 (en) |
CA (1) | CA2563031A1 (en) |
MX (1) | MXPA06012355A (en) |
WO (1) | WO2005108695A1 (en) |
ZA (1) | ZA200609453B (en) |
Families Citing this family (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070039258A1 (en) * | 2005-08-19 | 2007-02-22 | Walker John R Iii | Adjustable attachment system |
US7452173B2 (en) * | 2006-05-09 | 2008-11-18 | Custom Quality Homes, L.L.C. | Building transport device |
US7987644B2 (en) * | 2006-09-15 | 2011-08-02 | Enclos Corporation | Curtainwall system |
US20080111327A1 (en) * | 2006-11-13 | 2008-05-15 | Rhodes Design And Development Corporation | Transport device capable of adjustment to maintain load planarity |
US20080163577A1 (en) * | 2007-01-05 | 2008-07-10 | James Rhodes | Method and apparatus for mobile stem wall |
US20080164078A1 (en) * | 2007-01-05 | 2008-07-10 | Rhodes Design And Development Corporation | Device and method for transporting a load |
US20080184630A1 (en) * | 2007-02-01 | 2008-08-07 | James Rhodes | Home manufacturing facility |
US20080184659A1 (en) * | 2007-02-01 | 2008-08-07 | James Rhodes | Method and apparatus for sheltered, in-place home building |
US20080184658A1 (en) * | 2007-02-01 | 2008-08-07 | James Rhodes | Method for setting a building on a subdivision lot |
US20080184640A1 (en) * | 2007-02-01 | 2008-08-07 | James Rhodes | Movable building and building foundation |
US20080289287A1 (en) * | 2007-05-21 | 2008-11-27 | James Rhodes | Building manufacturing facility with rotatable subassembly areas |
US20090025322A1 (en) * | 2007-07-26 | 2009-01-29 | James Rhodes | Method and apparatus for building homes in a factory lacking a roof or exterior wall |
US8393518B2 (en) | 2008-11-18 | 2013-03-12 | Thomas P. Corcoran | Mobile manufacturing platform |
WO2010059278A1 (en) * | 2008-11-18 | 2010-05-27 | Thomas Corcoran | Mobile manufacturing platform and manufacturing method thereof |
US9027307B2 (en) | 2010-06-08 | 2015-05-12 | Innovative Building Technologies, Llc | Construction system and method for constructing buildings using premanufactured structures |
US20110296778A1 (en) | 2010-06-08 | 2011-12-08 | Collins Arlan E | Pre-manufactured utility wall |
US9493940B2 (en) | 2010-06-08 | 2016-11-15 | Innovative Building Technologies, Llc | Slab construction system and method for constructing multi-story buildings using pre-manufactured structures |
US8950132B2 (en) | 2010-06-08 | 2015-02-10 | Innovative Building Technologies, Llc | Premanufactured structures for constructing buildings |
CA2962552C (en) | 2014-08-30 | 2019-08-13 | Innovative Building Technologies, Llc | Floor and ceiling panel for use in buildings |
AU2014364344B2 (en) | 2014-08-30 | 2020-01-16 | Innovative Building Technologies, Llc | Prefabricated demising and end walls |
US10260250B2 (en) | 2014-08-30 | 2019-04-16 | Innovative Building Technologies, Llc | Diaphragm to lateral support coupling in a structure |
EP3011122B1 (en) | 2014-08-30 | 2017-08-16 | Innovative Building Technologies LLC | Closure piece for installing the track of a sliding door and method of using it |
WO2016032537A1 (en) | 2014-08-30 | 2016-03-03 | Innovative Building Technologies, Llc | A prefabricated wall panel for utility installation |
JP6806784B2 (en) | 2016-03-07 | 2021-01-06 | イノベイティブ ビルディング テクノロジーズ,エルエルシー | Floor and ceiling panels for floor systems that do not include building slabs |
MX2018010276A (en) | 2016-03-07 | 2019-02-20 | Innovative Building Tech Llc | A pre-assembled wall panel for utility installation. |
CN109072609B (en) | 2016-03-07 | 2021-03-16 | 创新建筑技术有限责任公司 | Prefabricated divider walls with external conduit engagement |
CA3015813C (en) | 2016-03-07 | 2020-08-25 | Innovative Building Technologies, Llc | Waterproofing assemblies and prefabricated wall panels including the same |
SG11201807780XA (en) | 2016-03-10 | 2018-10-30 | Lonza Ag | Customizable facility |
US10689873B2 (en) * | 2016-03-10 | 2020-06-23 | Lonza Ltd | Customizable facility |
EP3478821A1 (en) | 2016-08-02 | 2019-05-08 | Lonza Ltd | Customizable facility |
US10724228B2 (en) | 2017-05-12 | 2020-07-28 | Innovative Building Technologies, Llc | Building assemblies and methods for constructing a building using pre-assembled floor-ceiling panels and walls |
US11098475B2 (en) | 2017-05-12 | 2021-08-24 | Innovative Building Technologies, Llc | Building system with a diaphragm provided by pre-fabricated floor panels |
US10323428B2 (en) | 2017-05-12 | 2019-06-18 | Innovative Building Technologies, Llc | Sequence for constructing a building from prefabricated components |
US10487493B2 (en) | 2017-05-12 | 2019-11-26 | Innovative Building Technologies, Llc | Building design and construction using prefabricated components |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4501098A (en) * | 1982-07-19 | 1985-02-26 | Heritage Homes, Inc. | Hybrid home construction technique |
US4546530A (en) * | 1983-06-14 | 1985-10-15 | Polyfab S.A.R.L. | Method for producing a modular building unit |
US6000192A (en) | 1995-07-14 | 1999-12-14 | Cohen Brothers Homes, Llc | Method of production of standard size dwellings |
US6253504B1 (en) | 1995-07-14 | 2001-07-03 | Cohen Brothers Homes, Llc | Manufacturing facility for production of standard size dwellings |
WO2003052212A1 (en) * | 2001-12-17 | 2003-06-26 | Bau How N.V. | Assembling shop with assembly line, compartments and material line for producing prefabricated buildings in modular steel skeleton construction |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3679177A (en) * | 1970-04-14 | 1972-07-25 | Scholz Homes Inc | Method and apparatus for setting a prefabricated building section |
US3994060A (en) * | 1971-10-01 | 1976-11-30 | Lely Cornelis V D | Methods and production lines for the manufacture of prefabricated buildings |
US4187659A (en) * | 1976-09-07 | 1980-02-12 | North Oakland Development Corporation | Home building method and apparatus |
US4110952A (en) * | 1976-09-07 | 1978-09-05 | North Oakland Development Corporation | Home building method |
US4114328A (en) * | 1976-09-13 | 1978-09-19 | Robert Raymond Lawrence | Prefabricated transportable building without continuous steel chassis |
US4320607A (en) * | 1978-10-10 | 1982-03-23 | Eubank Marcus P | Combination floor, jack and trailer assemblies |
GR73603B (en) * | 1978-12-11 | 1984-03-26 | Wybauw Jacques | |
US4616459A (en) * | 1981-05-29 | 1986-10-14 | Calvin Shubow | Building construction using hollow core wall |
US4485608A (en) * | 1982-07-13 | 1984-12-04 | Restroom Facilities Corporation | Prefabricated, self-contained building and method of construction |
US4869036A (en) * | 1987-03-16 | 1989-09-26 | Building With Legs, Ltd. | Modular building construction |
US4930809A (en) * | 1988-01-11 | 1990-06-05 | Lindsay Industries, Inc. | Towable unified floor frame assembly |
US5076310A (en) * | 1989-02-23 | 1991-12-31 | Alexander Barenburg | Framed wall with a prefabricated underfloor drain line and method of manufacture |
US5381633A (en) * | 1990-09-28 | 1995-01-17 | Hendrich; John H. | Assembly and method for constructing a building |
US5094048A (en) * | 1990-12-14 | 1992-03-10 | Woo Chi G | Transportable modular home |
US5402618A (en) * | 1991-12-31 | 1995-04-04 | Cable Bridge Enterprises Limited | System for use in fabricating, transporting and placing a prefabricated building unit at its placement site |
US5353558A (en) * | 1992-12-23 | 1994-10-11 | Fairmont Homes, Inc. | Manufactured house unit |
-
2004
- 2004-04-26 US US10/832,745 patent/US20050235581A1/en not_active Abandoned
-
2005
- 2005-02-18 WO PCT/US2005/005429 patent/WO2005108695A1/en active Application Filing
- 2005-02-18 MX MXPA06012355A patent/MXPA06012355A/en not_active Application Discontinuation
- 2005-02-18 EP EP05713868A patent/EP1740782A1/en not_active Withdrawn
- 2005-02-18 AU AU2005240968A patent/AU2005240968A1/en not_active Abandoned
- 2005-02-18 ZA ZA200609453A patent/ZA200609453B/en unknown
- 2005-02-18 CA CA002563031A patent/CA2563031A1/en not_active Abandoned
- 2005-02-18 CN CNA2005800214226A patent/CN101300393A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4501098A (en) * | 1982-07-19 | 1985-02-26 | Heritage Homes, Inc. | Hybrid home construction technique |
US4546530A (en) * | 1983-06-14 | 1985-10-15 | Polyfab S.A.R.L. | Method for producing a modular building unit |
US6000192A (en) | 1995-07-14 | 1999-12-14 | Cohen Brothers Homes, Llc | Method of production of standard size dwellings |
US6253504B1 (en) | 1995-07-14 | 2001-07-03 | Cohen Brothers Homes, Llc | Manufacturing facility for production of standard size dwellings |
WO2003052212A1 (en) * | 2001-12-17 | 2003-06-26 | Bau How N.V. | Assembling shop with assembly line, compartments and material line for producing prefabricated buildings in modular steel skeleton construction |
Also Published As
Publication number | Publication date |
---|---|
CN101300393A (en) | 2008-11-05 |
MXPA06012355A (en) | 2007-01-31 |
US20050235581A1 (en) | 2005-10-27 |
ZA200609453B (en) | 2008-02-27 |
AU2005240968A1 (en) | 2005-11-17 |
CA2563031A1 (en) | 2005-11-17 |
EP1740782A1 (en) | 2007-01-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20050235581A1 (en) | System for production of standard size dwellings using a satellite manufacturing facility | |
AU709284B2 (en) | Movable manufacturing facility for production of standard size dwellings | |
CA2226873C (en) | Method of production of standard size dwellings using a movable manufacturing facility | |
US20020007605A1 (en) | Manufactured standard size dwellings having an integral base frame | |
US10947720B2 (en) | Block construction of prefabricated buildings | |
US4501098A (en) | Hybrid home construction technique | |
US8418411B2 (en) | Integral, industrialized modular dwelling system | |
US10227785B2 (en) | Portable robotic casting of volumetric modular building components | |
US20220381050A1 (en) | System and Method for Hybrid Building Construction for Difficult Sites | |
US20080022609A1 (en) | Mobile manufacturing plants for producing prefab elements | |
Rosenfeld | Innovative construction methods | |
US20050186062A1 (en) | Modular housing system | |
CA2359062C (en) | Standard size dwellings | |
JP2002295030A (en) | Building having detached building appearance applicable to law for condominium ownership, etc., of building for effective use of building lot, and sales method thereof | |
Tash | Research into modular construction | |
Marfella et al. | The Logic of Rapid Extrusion Produces the “Jumping” Phoenix | |
Honyak | Design Decisions for a Buildable Prefabricated Modular High-Rise Structure with Customized Geometry: A Case for Honolulu, HI. | |
US20080276565A1 (en) | Method and apparatus for stick building homes within a factory | |
KR20100014211A (en) | Customized Partial Temporary Space Model House Structures Suitable for Interior Construction | |
Richman | Accelerated methods of residential construction: prefabrication re-evaluated | |
JPH11124903A (en) | Construction method for building using pc member | |
IE84811B1 (en) | Construction of buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SM SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2005713868 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2563031 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2005240968 Country of ref document: AU |
|
WWE | Wipo information: entry into national phase |
Ref document number: 3067/KOLNP/2006 Country of ref document: IN |
|
WWE | Wipo information: entry into national phase |
Ref document number: PA/a/2006/012355 Country of ref document: MX |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2006/09453 Country of ref document: ZA Ref document number: 200609453 Country of ref document: ZA |
|
ENP | Entry into the national phase |
Ref document number: 2005240968 Country of ref document: AU Date of ref document: 20050218 Kind code of ref document: A |
|
WWP | Wipo information: published in national office |
Ref document number: 2005240968 Country of ref document: AU |
|
WWE | Wipo information: entry into national phase |
Ref document number: 200580021422.6 Country of ref document: CN |
|
WWP | Wipo information: published in national office |
Ref document number: 2005713868 Country of ref document: EP |