WO2001096665A1 - Method of constructing simple and continuous composite bridges - Google Patents

Method of constructing simple and continuous composite bridges Download PDF

Info

Publication number
WO2001096665A1
WO2001096665A1 PCT/KR2000/001501 KR0001501W WO0196665A1 WO 2001096665 A1 WO2001096665 A1 WO 2001096665A1 KR 0001501 W KR0001501 W KR 0001501W WO 0196665 A1 WO0196665 A1 WO 0196665A1
Authority
WO
WIPO (PCT)
Prior art keywords
concrete
abutments
bridge
beams
composite
Prior art date
Application number
PCT/KR2000/001501
Other languages
English (en)
French (fr)
Inventor
Min Se Koo
Original Assignee
Min Se Koo
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020000031515A external-priority patent/KR20000054500A/ko
Priority claimed from KR1020000035471A external-priority patent/KR20000058716A/ko
Priority claimed from KR2020000018176U external-priority patent/KR200212395Y1/ko
Application filed by Min Se Koo filed Critical Min Se Koo
Priority to AU2001222332A priority Critical patent/AU2001222332A1/en
Publication of WO2001096665A1 publication Critical patent/WO2001096665A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Definitions

  • the present invention relates to a method of constructing simple and continuous composite bridges, such as simple and continuous preflex composite bridges, prestressed concrete (PSC) composite bridges, steel box girder bridges, plate girder bridges, and long span truss bridges.
  • simple and continuous preflex composite bridges such as simple and continuous preflex composite bridges, prestressed concrete (PSC) composite bridges, steel box girder bridges, plate girder bridges, and long span truss bridges.
  • PSC prestressed concrete
  • Patent 1 discloses a method of constructing simple preflex composite bridges using a provisional support, and for continuous composite bridges
  • Korean Unexamined Pat. Publication No. 105754 discloses a continuous prestressed composite beam and method of constructing continuous prestressed composite beam structure using the same.
  • Figs, la to Id are views showing a conventional procedure for constructing composite bridges in accordance with the cited invention 1. With reference to these drawings, there will be described a method of constructing composite bridges in accordance with the cited invention 1.
  • a preflex beam fabricated in a factory or field is rested on two abutments, a provisional support 51 is set, and a compressive stress is introduced to a lower concrete casing 52 by lifting up the provisional support 51 to compensate for the creep of initial concrete and the loss of compressive stress by drying contraction.
  • a provisional support is positioned under the center of a beam and an upward load is applied to the support. Accordingly, high costs are incurred by the use of a staging for a beam having a high overhead clearance, traffic is obstructed under the bridge, and the construction is complicated.
  • the entire bridge behaves as a simple beam system, so the cross section of a composite girder should be enlarged to provide against the maximum positive moment, thereby causing a problem that excessive deflection occurs at the center of the beam owing to the enlargement of the cross section.
  • Figs. 2a to 2e and 3a to 3h are views showing methods of constructing a two-span continuous composite bridge and a three-span continuous composite bridge in accordance with the cited invention 2.
  • a two-span continuous composite bridge is described.
  • preflex beams made by span according to the design of the continuous beam are connected to each other over a second support 54 and rested on the second support 54.
  • compressive stress is introduced to a lower casing concrete 52 by lifting up the second support 54.
  • a floor slab concrete 53 is applied to the upper flange of a steel girder near a second support 54 and cured, and as shown in Fig. 2d, compressive moment is introduced to provide against negative moment created in the floor slab concrete near the second support 54.
  • the two-span continuous preflex composite bridge is completed by applying the remaining floor slab concrete.
  • Figs. 3a to 3h are views showing a method of constructing a three-span continuous preflex composite bridge.
  • a process performed near a second support 54 is the same as that of the two-span continuous preflex composite bridge shown in
  • Fig. 2 Thereafter, as shown in Figs. 3e to 3h, the three-span continuous preflex composite bridge is completed by lifting up a third support 55, applying a floor slab concrete 53, lowering the third support 53 and applying the remaining floor slab concrete.
  • the method of the cited invention 2 is problematic in that a construction joint is created owing to time difference in the application of a floor slab concrete to positive and negative moment regions and the difficulty and danger in construction occur owing to the lifting-up and lowering of supports being performed on bridge piers, that is, the second and third supports.
  • a bridge bearing that serves as a medium for transmitting the load of its upper structure to its lower structure is comprised of a rotatable hinge support and a rotatable and movable roller support, so the bridge bearing should be continuously maintained to guarantee the safety of the upper structure of a bridge and may be damaged by an earthquake.
  • an object of the present invention is to provide a practical and economical method of constructing simple and continuous composite bridges, which is capable of introducing compressive stress to the upper floor slab concrete in a negative moment region and the lower flange of a composite girder by lowering and lifting up a support on an abutment, that is, an end support while for a simple composite bridge a beam is completely integrated with an abutment or for a continuous composite bridge a beam is integrated with a bridge pier or not.
  • the present invention provides a method of constructing simple composite bridges, comprising the steps of providing first and second abutments; implanting a shape steel in a bridge seat portion of the first abutment; simply resting a beam on the first and second abutments; connecting the shape steel in the bridge seat portion to a lower flange of the beam; applying a connecting concrete to a portion ranging from an upper end of the first abutment to a neutral axis of the beam; lowering a support near the second abutment; applying a concrete to a portion ranging from an upper end of the connecting concrete to a bottom plate of the beam; applying a floor slab concrete to the beam; and lifting up the lowered support near the second abutment.
  • a method of constructing continuous composite bridges of the present invention may comprise the steps of: connecting at least two beams to each other and simply resting the connected beams near a first abutment, a second abutment and at least one imier bridge pier; lowering supports near said first and second abutments; applying a floor slab concrete to said beams; and lifting up the lowered supports.
  • a method of constructing continuous composite bridges further comprises the steps of: implanting a shape steel in the coping portion of the inner bridge pier before the step of simply resting the beams; connecting the shape steel and the lower flanges of the beams after the step of simply resting the beams; applying a concrete to a portion ranging from the upper end of the coping portion of the inner bridge pier to the neutral axis of cross sections of the beams; and applying a concrete to a portion ranging from the upper end of the connecting concrete of the inner bridge pier to the bottom plates of the beams before the step of lowering supports near the first and second abutments.
  • the supports near the first and second abutments are simultaneously lowered when the supports near the first and second abutments are lowered, and the lowered supports near the first and second abutments are simultaneously lifted up when the supports near the first and second abutments are lifted up.
  • the supports near the first and second abutments are sequentially lowered when the supports near the first and second abutments are lowered, and the lowered supports near the first and second abutments are sequentially lifted up when the supports near the first and second abutments are lifted up.
  • one of the supports near the first and second abutments is lowered when the supports near the first and second abutments are lowered, and the lowered one support is lifted up when the supports near the first and second abutments are lifted up.
  • the method further comprises the step of mounting one or more reinforcing members and studs to the webs of the beams.
  • the method further comprises the step of exposing reinforcing rods out of the webs of the beams.
  • the method further comprises the steps of applying a floor slab concrete to the parapet wall of the first abutment and a positive moment region, and arranging connective reinforcing rods for connecting the parapet wall to the floor slab concrete; before the step of lowering the support near the second abutment.
  • the method further comprises the steps of applying floor slab concretes to the positive moment region of the beams, and arranging connective reinforcing rods to com ect the floor slab concretes to one another; before the step of lowering the supports near the first and second abutments.
  • the beams are connected at a position that is situated at an inner support, or a position that is situated by the right and left sides of an inner support.
  • Figs, la to Id are views showing a conventional procedure for constructing a simple preflex composite bridge
  • Figs. 2a to 2e are views showing a conventional procedure for constructing a two-span continuous preflex composite bridge
  • Figs. 3a to 3h are views showing a conventional procedure for constructing a three-span continuous preflex composite bridge
  • Figs. 4a to 4d are views showing a state in which an abutment is integrated with a composite girder so as to construct a simple preflex composite bridge;
  • Figs. 5a to 5c are views showing a state in which an abutment is integrated with a composite girder so as to construct a simple steel box girder bridge;
  • Figs. 6a to 6c are views showing a state in which an abutment is integrated with a composite girder so as to construct a simple prestressed concrete composite bridge
  • Figs. 7a to 7d are views showing a procedure for constructing a simple preflex composite bridge in accordance with the present invention
  • Figs. 8a to 8d are views showing a procedure for constructing a two-span continuous composite bridge in which a bridge pier is not integrated with a composite girder, in accordance with the present invention
  • Figs. 9a to 9d are views showing a procedure for constructing a three-span continuous composite bridge in which a bridge pier is not integrated with a composite girder, in accordance with the present invention
  • Figs. 10a to 10c are views showing a state in which a beam is connected to another beam at an inner support during the construction of a multi-span continuous composite bridge in accordance with the present invention
  • Figs. 1 la to 1 Id are views showing a state in which a composite girder is integrated with a bridge pier so as to construct a multi-span continuous preflex composite bridge in accordance with the present invention
  • Figs. 12a to 12c are views showing a state in which a composite girder is integrated with a bridge pier so as to construct a multi-span continuous steel box girder bridge in accordance with the present invention
  • Figs. 13a to 13c are views showing a state in which a composite girder is integrated with a bridge pier so as to construct a multi-span prestressed concrete composite bridge in accordance with the present invention
  • Figs. 14a to 14c are views showing a procedure for constructing a two- span continuous composite bridge in which a bridge pier is integrated with a composite girder, in accordance with the present invention.
  • Figs. 15a to 15c are views showing a procedure for constructing a three- span continuous composite bridge in which a bridge pier is integrated with a composite girder, in accordance with the present invention. ' *Description of reference numerals*
  • bridge seat portion 2 beam 3 : shape steel
  • Figs. 4a to 7d are views showing methods of constructing simple composite bridges in which beams are integrated with abutments.
  • Figs. 4a to 4d are views showing a method in which while a preflex beam 2 fabricated in the form of a simple beam is simply rested on a pair of abutments, a bridge seat portion 1 is coimected to the preflex beam 2 in one of the abutments. As shown in Fig.
  • an H- or D-shaped steel 3 is implanted in the bridge seat portion 1, a connecting plate 4 is welded onto the shape steel 3 to connect the shape steel 3 to the lower flange 60 of a beam 2, and the shape steel 3 is coimected to the lower flange 60 of the beam 2 by bolts 5 or a welding process.
  • a reinforcing member 8 is attached to the beam 2, and a plurality of studs 9 are secured onto a steel girder to improve the connection of the steel girder with a concrete.
  • a connecting concrete 10 is applied to a portion ranging from the upper end of the abutment to the neutral axis of the cross section of the preflex beam 2.
  • a plurality of reinforcing rods 6 are exposed out of the connecting concrete 10 to connect the connecting concrete 10 to a later applied concrete.
  • a stationary support is accomplished by applying a concrete as well as an upper floor slab 61.
  • Fig. 4d is a plan view of the abutment employed in this method.
  • Figs. 5a to 5c are views showing a method in which while a steel box girder 2 is simply rested on a pair of abutments, a bridge seat portion 1 is connected to the steel box girder 2 in one of the abutments.
  • an H- or D-shaped steel 3 is implanted in the upper portion of the bridge seat portion 1, a connecting plate 4 is welded onto the shape steel 3 to connect the shape steel 3 to the lower flange 60 of the steel box girder 2, and the shape steel 3 is connected to the lower flange 60 of the steel box girder 2 by bolts 5 or a welding process.
  • reinforcing members 8 are attached to the steel box girder 2, and a plurality of studs 9 are secured onto a steel girder to improve the connection of the steel girder with a concrete.
  • a connecting concrete 10 is applied to a portion ranging from the upper end of the abutment to the neutral axis of the cross section of the steel box girder 2.
  • a plurality of reinforcing rods 6 are exposed out of the connecting concrete 10 to connect the connecting concrete 10 to a later applied concrete.
  • a stationary support is completed by applying a concrete as well as an upper floor slab 61.
  • Figs. 6a to 6c are views showing a method of constructing a prestressed concrete composite bridge in which while a prestressed concrete (PSC) beam 2 is simply rested on a pair of abutments, a bridge seat portion 1 is connected to the PSC beam 2 in one of the abutments.
  • PSC prestressed concrete
  • a floor slab concrete is applied over a full span except about 10% of the span extended from a stationary support and a connecting concrete 10 is applied to a portion ranging from the upper end of the abutment to the neutral axis of the cross section of the PSC beam 2, to integrate the abutment with the PSC beam 2.
  • a parapet wall 63 is provided. Additionally, in order to allow the connecting concrete 10 to be integrated with a later applied concrete, reinforcing rods 6 are exposed out of the connecting concrete 10 and the parapet wall 63 in advance. Tensile reinforcing rods 64 are arranged in the parapet wall 63 of the abutment and applied floor slab concrete to provide against tensile force created when a movable support is lowered during the construction.
  • the former length is a length that allows compressive stress to be effectively introduced, and can be varied depending upon bridge classes and materials of concretes used.
  • a stationary support is completed by applying a concrete as well as an upper floor slab 61.
  • Figs. 7a to 7d are views showing the method of constructing a simple composite bridge.
  • Fig. 7a is a view showing a state in which a beam fabricated in a factory or field is simply rested on a pair of abutments with a stationary support 71 employed as one support and a movable support 72 employed as the other support.
  • Fig. 7b is a view showing a state in which compressive stress is introduced to the lower flange of the beam by lowering the moving support 72, and moment distribution in this state.
  • Fig. 7c is a view showing a state in which a floor slab concrete (61 in
  • Fig. 7d is a view showing a state in which compressive stress corresponding to negative stress created in the stationary support 71 is introduced to the floor slab concrete by lifting up the lowered movable support 72 after the floor slab concrete is cured.
  • tensile stress is created in the lower flange. This tensile stress amounts to about 60 to 70% of compressive stress introduced during the lowering of the movable support 72 owing to the increased sectional strength after integration, resulting in the achievement of about 30 to 40% compressive prestressing effect.
  • a floor slab concrete is applied over a full span except about 10% of the span extended from the stationary support before the lowering of the movable support, and a concrete is applied to the remaining portion after the lowering of the movable support.
  • Figs. 8a to 9d are views showing constructing methods for eliminating the problems of the cited invention 2 in which a construction joint may be created and an accident may occur owing to the lifting and lowering of the support on a bridge pier. As described above, these methods can be applied to preflex composite bridges, PSC composite bridges, steel box girder bridges, plate girder bridges, and long span truss bridges.
  • Figs. 8a to 8d are views showing a method of constructing two-span continuous composite bridges in which a bridge pier is not integrated with a composite girder.
  • additional compressive stress is introduced to the lower flange in a positive moment region by lifting up the inner support, or the second support;
  • a preflex beam or PSC beam fabricated in the form of a simple beam is rested on abutments and a bridge pier and connected to the bridge pier at an inner support 73 (as shown in Figs. 10a and 10c) or by the right or left side of the inner support 73 (as shown in Fig. 10b).
  • Fig. 8b is a view showing a state in which additional compressive stress is introduced into a lower flange by lowering the two end supports of a bridge on the abutments of the bridge, and moment distribution in this state.
  • Fig. 8c is a view showing a state in which a floor slab concrete is applied while two end supports are lowered, and moment distribution in this state.
  • Fig. 8d is a view showing a state in which compressive stress corresponding to tensile stress created in an inner support after integration is introduced to the floor slab concrete by lifting up the lowered end supports 72 after the floor slab concrete is cured.
  • tensile stress is created in the lower flange, as in the simple span.
  • This tensile stress amounts to about 60 to 70% of compressive stress introduced during the lowering of the end supports owing to the increased sectional strength after integration, resulting in the achievement of about 30 to 40%> compressive prestressing effect.
  • a floor slab concrete is applied over a full span except about 10% of the span by both sides of an inner support before the lowering of the end supports, and a concrete is applied to the remaining portion after the lowering of the end supports.
  • Figs. 9a to 9d are views showing a method of constructing three-span continuous composite bridges in which a bridge pier is not integrated with a composite girder.
  • Fig. 9a is a view showing a state, in which preflex beams or PSC beams are rested on abutments and a bridge pier, and, as shown in Figs. 10a, 10b and 10c, are connected to one another at an inner support or at a position by the right or left side of a bridge pier in the negative moment area of the entire bridge away from the inner support.
  • additional compressive stress is introduced to the lower flange in a positive moment region by sequentially lifting up the second support 73 and the third support 74; whereas in this method of the present invention, as shown in Fig. 9b, the same effect is achieved by simultaneously or sequentially lowering both end supports.
  • Fig. 9c is a view showing a state in which a floor slab concrete is applied while two end supports are lowered, and moment distribution in this state.
  • Fig. 9d is a view showing a state in which compressive stress corresponding to tensile stress created in an inner support after integration is introduced to the floor slab concrete by lifting up the lowered end supports after the floor slab concrete is cured.
  • tensile stress is created in the lower flange, as in the above embodiments.
  • This tensile stress amounts to about 60 to 70%) of compressive stress introduced during the lowering of the end supports owing to the increased sectional strength after integration, resulting in the achievement of about 30 to 40% compressive prestressing effect.
  • the positive moment created in an inner span is only about 1/5 of the absolute value of the maximum negative moment created on the inner support owing to the structural characteristics of a continuous beam, so the continuous composite bridge has a sufficient compressive stress without the introduction of additional compressive prestressing during the lifting and lowering of the end supports.
  • a floor slab concrete is applied over a full span except about 10%> of the span by both sides of its inner support before the lowering of the end supports, and a concrete is applied to the remaining portion after the lowering of the end supports.
  • Fig. 10a is a detailed view showing a state in which for the preflex composite bridge two beams 2 are connected to each other by means of a plurality of connecting plates 4 and bolts 5.
  • a floor slab concrete is applied to a negative moment region and a joint concrete 11 is applied over an inner support; whereas in the method of the present invention, before the end supports are lowered, a joint concrete 11 is applied over the inner support.
  • Fig. 10b is a detailed view showing another connecting method for the preflex composite bridge in which two beams 2 are connected at a position by the sides of the inner support to each other by means of a plurality of connecting plates
  • Fig. 10c is a detailed view showing a state in which for a PSC composite bridge two beams 2 are connected to each other at the inner support of the bridge.
  • a plurality of bolts 5 are previously implanted in the concrete of the upper flange of the PSC beam; in connecting the beams, the bolts are tightened to a connecting plate 4.
  • two PSC beams are connected by means of connective reinforcing rods 6 in the upper flanges of the PSC beams.
  • This construction is provided to stabilize the entire composite girder, though the connective reinforcing rods 6 do not play an important role because of the lower flanges near the inner support being a compressive side.
  • an assembly step 12 is formed along the central axis of the beams and the gap between the beams is filled with non-contractile mortar.
  • the steel box girder bridge has no connecting portion near its inner support, so the method of the present invention can be applied to the steel box girder bridge.
  • Figs. 11a to 15c are views showing the different methods of constructing multi-span continuous composite bridges. These methods can provide for the shortcomings of a bridge bearing and damage due to earthquake by integrating each beam and each bridge pier. These integration methods and construction methods will be described hereinafter.
  • a preflex composite bridge two beams 2 fabricated in the form of simple beams, as shown in Fig. 10a, are connected to each other by means of a plurality of connecting plates 4 and bolts 5 and laid on a D-shaped steel 14, and the D-shaped steel 14 is coimected to the lower flange 60 of a steel girder through a welding process.
  • reinforcing rods 6 are exposed out of the bridge pier 13 and the lower casing concretes 52 of the beams 2 in advance.
  • Fig. 11a for a preflex composite bridge, two beams 2 fabricated in the form of simple beams, as shown in Fig. 10a, are connected to each other by means of a plurality of connecting plates 4 and bolts 5 and laid on a D-shaped steel 14, and the D-shaped steel 14 is coimected to the lower flange 60 of a steel girder through a welding process.
  • reinforcing rods 6 are exposed out of the bridge pier 13 and the lower casing concretes 52 of the beams 2
  • a concrete is applied to the remaining portion of the beams 2
  • the connecting concrete 10 is applied to a portion ranging from the upper end of the bridge pier 13 to the neutral axis of the cross section of the beams 2
  • reinforcing rods 6 are exposed out of the connecting concrete 10 to help the connecting concrete 10 to be connected with a later applied concrete.
  • the multi-span continuous composite bridge in which each beam 2 is integrated with each bridge pier 13 can be completed by applying a floor slab concrete, a web concrete and the remaining upper end concrete of the bridge pier while the end supports of the multi-span continuous composite bridge are lowered.
  • Fig. 1 Id is a plan view showing the D-shaped steel 14 implanted in the bridge pier 13.
  • Figs. 12a to 12c are views showing a method of constructing steel box girder bridges.
  • a steel box girder 2 or a segment corresponding to a negative moment region is laid on a D-shaped steel 14 previously implanted in a bridge pier 13, and the D-shaped steel 14 is connected to the lower flange 60 of the steel box girder 2 by a welding process.
  • a connecting concrete 10 is applied to a portion ranging from the upper end of the bridge pier 13 to the neutral axis of the cross section of the steel box girder 2 to integrate the bridge pier 13 with the steel box girder 2.
  • reinforcing rods 6 are exposed out of the bridge pier 13
  • reinforcing members 8 are attached to the web portions of the steel box girder 2 to reinforce the steel box girder 2
  • studs 9 are implanted in the upper flange and web of the steel box girder 2 to allow concretes to be securely attached to the steel box girder 2.
  • the connecting portion of a composite girder does not exist in the steel box girder bridge, the methods of the present invention can be easily applied to the steel box girder bridge.
  • the multi-span continuous steel box girder bridge in which each girder is integrated with each bridge pier can be completed by applying a floor slab concrete and the remaining upper end concrete of the bridge pier while the end supports of the composite bridge are lowered.
  • Figs. 13a to 13c are views showing a method of constructing PSC composite bridges. As shown in Fig. 13a, two PSC beams connected to each other as in Fig.
  • a floor slab concrete is applied over a full span except about 10% of the span extended by both sides of its inner support and a connecting concrete 10 is applied to a portion ranging from the upper end of the bridge pier 13 to the neutral axis of the cross section of the PSC beam 2, to integrate the bridge pier 13 with the PSC beam 2.
  • reinforcing rods 6 are exposed out of the bridge pier 13.
  • Figs. 14a to 14c are views showing a method of constructing two-span continuous composite bridges.
  • Fig. 14a is a view showing a state in which additional compressive stress is introduced into a lower flange by simultaneously or sequentially lowering the two end supports of an entire structure after a composite girder is connected to a bridge pier as shown in Figs, l ib, 12b and 13b,, and moment distribution in this state.
  • Fig. 14b is a view showing a state in which a floor slab concrete is applied while the two end supports are lowered,, and moment distribution in this state.
  • the bridge pier is completely integrated with the composite girder by applying the floor slab concrete and the remaining upper end concrete of the bridge pier.
  • Fig. 14c is a view showing a state in which compressive stress corresponding to tensile stress created in the floor slab concrete in a negative moment region caused by design live loads is introduced by simultaneously or sequentially lifting up the lowered two end supports after the floor slab concrete and the upper end concrete of the bridge pier are cured. Through this process, tensile stress is created in the lower flange portion in a positive moment region. This tensile stress amounts to about 60 to 70% of compressive stress introduced during the lowering of the end supports owing to the increased sectional strength after integration, resulting in the achievement of about 30 to 40% compressive prestressing effect.
  • a floor slab concrete is applied over a full span except about 10% of the span by both sides of an inner support before the lowering of the end supports, and a concrete is applied to the remaining portion after the lowering of the end supports.
  • Figs. 15a to 15c are views showing a method of constructing three-span continuous composite bridges in which a bridge pier is integrated with a composite girder.
  • Fig. 15a is a view showing a state in which additional compressive stress is introduced into a lower flange by simultaneously or sequentially lowering the two end supports of an entire structure after a composite girder is connected to a bridge pier as shown in Figs, l ib, 12b and 13b radical and moment distribution in this state.
  • Fig. 15b is a view showing a state in which a floor slab concrete is applied while the two end supports are lowered,, and moment distribution in this state.
  • the bridge pier is completely integrated with the composite girder by applying the floor slab concrete and the remaining upper end concrete of the bridge pier.
  • Fig. 15c is a view showing a state in which compressive stress corresponding to tensile stress created in the floor slab concrete portion in a negative moment region caused by design live loads is introduced by simultaneously or sequentially lifting up the lowered two end supports after the floor slab concrete and the upper end concrete of the bridge pier are cured.
  • tensile stress is created in the lower flange portion. This tensile stress amounts to about 60 to 70% of compressive stress introduced during the lowering of the end supports owing to the increased sectional strength after integration, resulting in the achievement of about 30 to 40% compressive prestressing effect.
  • a floor slab concrete is applied over a full span except about 10% of the span by both sides of an inner support before the lowering of the end supports, and a concrete is applied to the remaining portion after the lowering of the end supports.
  • the positive moment created in the inner span is only about 1/3.5 of the absolute value of the maximum negative moment, so the bridge has a sufficient compressive stress even though additional compressive prestress is not introduced during the lowering and lifting up of both end supports.
  • the composite bridge in which a bridge pier is integrated with a composite girder in accordance with the present invention, about 10% of the span by both sides of the bridge pier is made to have a relatively large sectional area so as to provide against relatively large moment generated near the integrated bridge pier and composite girder, thereby allowing the composite bridge to have various cross sections.
  • the amount of compressive prestress can be adjusted by reducing the amount of lifting-up of the end supports to an amount less than that of the lowering of the end supports.
  • the single structure, two-span structure and three-span structure of the cited invention are a determinated structure, a first order indeterminated structure and a three order inderminated structure
  • the single structure, two-span structure and three-span structure of the present invention are a first order indeterminated structure, a five order indeterminated structure and a eight order inderminated structure, thereby improving a vibration reduction effect and earthquake-proof by due to energy dispersion by plasticity.
  • relatively great moment is distributed over a lower structure by the integration of the composite girder and the lower structure, so the burden of a beam against external force is reduced, thereby reducing the height of the girder and extending the length of a span and acquiring an economical cross section.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
PCT/KR2000/001501 2000-06-08 2000-12-21 Method of constructing simple and continuous composite bridges WO2001096665A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2001222332A AU2001222332A1 (en) 2000-06-08 2000-12-21 Method of constructing simple and continuous composite bridges

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
KR1020000031515A KR20000054500A (ko) 2000-06-08 2000-06-08 단경간 및 다경간 합성형 구조물에서 단부 지점의 하강 및상승공정을 이용 및 조절하여 부모멘트 구간 바닥판콘크리트와 정모멘트 구간 하부플랜지에 압축응력을도입시키는 시공법
KR2000/31515 2000-06-08
KR2000/35471 2000-06-26
KR2000/18176U 2000-06-26
KR1020000035471A KR20000058716A (ko) 2000-06-26 2000-06-26 빔과 교각을 일체화시키고 단부 지점을 하강 및상승시키는 다경간 연속 합성형의 시공법
KR2020000018176U KR200212395Y1 (ko) 2000-06-26 2000-06-26 하부구조와 상부주형을 일체화시킨 단면 구조

Publications (1)

Publication Number Publication Date
WO2001096665A1 true WO2001096665A1 (en) 2001-12-20

Family

ID=36716992

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2000/001501 WO2001096665A1 (en) 2000-06-08 2000-12-21 Method of constructing simple and continuous composite bridges

Country Status (5)

Country Link
JP (1) JP3588325B2 (zh)
KR (1) KR100522170B1 (zh)
CN (1) CN1252354C (zh)
AU (1) AU2001222332A1 (zh)
WO (1) WO2001096665A1 (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1579077A1 (en) * 2002-12-30 2005-09-28 KOO, Min Se Prestressed composite girder, continuous prestressed composite girder structure and methods of fabricating and connecting the same
ES2283179A1 (es) * 2005-03-11 2007-10-16 Iglesias Y Revilla, S.L. Estructuras mixtas para su aplicacion a naves industriales prefabricadas.
KR101046940B1 (ko) * 2008-11-17 2011-07-07 지에스건설 주식회사 피에스씨 거더와 강재 플레이트 거더를 이용한 연속교 시공방법
US8370983B2 (en) 2008-10-24 2013-02-12 Asahi Engineering Co., Ltd. Rigid connection structure of bridge pier and concrete girder
CN114232489A (zh) * 2021-12-20 2022-03-25 福建宏盛建设集团有限公司 一种大跨度钢混结构建筑物施工方法

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4318694B2 (ja) * 2006-02-13 2009-08-26 朝日エンヂニヤリング株式会社 床版橋構造
JP4863268B2 (ja) * 2006-06-01 2012-01-25 公益財団法人鉄道総合技術研究所 橋梁の構築工法およびその橋梁構造物
KR100742206B1 (ko) * 2006-10-25 2007-07-25 (주)한맥기술 모멘트 재분배에 의하여 장경간 및 저형고를 가지는 강합성라멘교 및 그 시공방법
JP5342312B2 (ja) * 2009-04-21 2013-11-13 大成建設株式会社 プレキャスト部材の架設方法
CN101694087B (zh) * 2009-10-13 2011-05-11 毕承会 一种新型桥的建造方法
CN102877417B (zh) * 2012-10-26 2014-12-03 中铁上海设计院集团有限公司 一种连续梁拱组合桥主梁吊杆的锚固方法
CN103205930B (zh) * 2013-04-25 2015-06-03 福州大学 一种既有简支空心板梁桥连续化改造的结构及其施工方法
CN104480858A (zh) * 2014-10-20 2015-04-01 中建三局第二建设工程有限责任公司 一种预应力混凝土箱梁横梁锚槽封锚的施工方法
CN104612056B (zh) * 2014-12-10 2016-06-29 中铁第四勘察设计院集团有限公司 一种框架桥整体快速顶推横移方法
CN104594194B (zh) * 2015-02-04 2016-08-24 河南省交通规划设计研究院股份有限公司 应用于大跨径桥梁和城市桥梁上的组合桥面板
KR101586320B1 (ko) * 2015-09-10 2016-01-18 오종훈 H-빔으로 이루어진 커넥터로 교각과 거더가 강결되는 psc 거더 합성형 라멘교 및 이의 시공방법
CN105926423B (zh) * 2016-04-15 2018-06-12 浙江大学 一种应用于空心板梁桥的组合梁式桥面连续装置及桥面连续方法
CN106284046A (zh) * 2016-10-09 2017-01-04 北京市市政工程设计研究总院有限公司 桥梁钢砼平弯组合梁制作方法
PH12017000177A1 (en) * 2017-06-16 2019-02-04 Wookyung Tech Co Ltd Method for manufacturing steel i beam segment of positive moment and negative moment and method for constructing simple bridge and continuous bridge
CN109977453B (zh) * 2019-01-15 2023-04-18 河北工程大学 固体充填液压支架工作阻力设计方法
CN112446069A (zh) * 2019-08-14 2021-03-05 深圳市建筑设计研究总院有限公司 一种结构构件的预内力及其计算方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07197420A (ja) * 1994-01-07 1995-08-01 Mitsubishi Heavy Ind Ltd コンクリート床版と鋼桁との連続合成桁橋の架設工法
KR19980071920A (ko) * 1998-07-03 1998-10-26 구민세 공장제작에 의한 프리플렉스 합성형의 시공법

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07197420A (ja) * 1994-01-07 1995-08-01 Mitsubishi Heavy Ind Ltd コンクリート床版と鋼桁との連続合成桁橋の架設工法
KR19980071920A (ko) * 1998-07-03 1998-10-26 구민세 공장제작에 의한 프리플렉스 합성형의 시공법

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1579077A1 (en) * 2002-12-30 2005-09-28 KOO, Min Se Prestressed composite girder, continuous prestressed composite girder structure and methods of fabricating and connecting the same
EP1579077A4 (en) * 2002-12-30 2008-10-22 Koo Min Se PRECONTROLLED JOINT BEAM, CONTINUOUS PRE-CONTAMINATED JOINT BEAM STRUCTURE AND METHODS OF MAKING AND CONNECTING THEM
ES2283179A1 (es) * 2005-03-11 2007-10-16 Iglesias Y Revilla, S.L. Estructuras mixtas para su aplicacion a naves industriales prefabricadas.
US8370983B2 (en) 2008-10-24 2013-02-12 Asahi Engineering Co., Ltd. Rigid connection structure of bridge pier and concrete girder
KR101046940B1 (ko) * 2008-11-17 2011-07-07 지에스건설 주식회사 피에스씨 거더와 강재 플레이트 거더를 이용한 연속교 시공방법
CN114232489A (zh) * 2021-12-20 2022-03-25 福建宏盛建设集团有限公司 一种大跨度钢混结构建筑物施工方法
CN114232489B (zh) * 2021-12-20 2023-08-25 福建宏盛建设集团有限公司 一种大跨度钢混结构建筑物施工方法

Also Published As

Publication number Publication date
KR100522170B1 (ko) 2005-10-18
CN1494628A (zh) 2004-05-05
CN1252354C (zh) 2006-04-19
JP3588325B2 (ja) 2004-11-10
JP2002004224A (ja) 2002-01-09
KR20030014686A (ko) 2003-02-19
AU2001222332A1 (en) 2001-12-24

Similar Documents

Publication Publication Date Title
WO2001096665A1 (en) Method of constructing simple and continuous composite bridges
CN101080534B (zh) 制造预应力钢组合梁的方法
CA2061871C (en) Composite, prestressed structural member and method of forming same
WO2001027406A1 (en) Method for designing and fabricating multi-step tension prestressed girder
WO2007064491A1 (en) Longitudinally offset bridge substructure support system
CN113638304B (zh) 混凝土梁式桥隐盖梁结构体系及其施工方法
JP2003253621A (ja) 既設単純桁橋梁を連続化した連続桁構造
KR101337185B1 (ko) 보강 콘크리트에 의해 보강된 하이브리드 교량의 시공방법 및 그 구조체
JP2004076457A (ja) 鋼pc合成橋梁の架設方法
CN215593647U (zh) 一种采用钢桁-砼预制结合梁段的梁拱组合结构
KR101415981B1 (ko) 부재별 연결구조를 이용한 합성형 라멘교 및 이의 시공방법
JP2004324164A (ja) 波形鋼板ウエブpc橋閉合部の施工方法
US2712750A (en) Finsterwalder
KR20040012496A (ko) 강 피시합성교량의 가설방법
CN1147589A (zh) 一种新的预应力钢筋混凝土结构及其施工方法
WO1994023147A2 (en) Method to construct the prestressed composite beam structure and the prestressed composite beam for a continuous beam thereof
KR20000054500A (ko) 단경간 및 다경간 합성형 구조물에서 단부 지점의 하강 및상승공정을 이용 및 조절하여 부모멘트 구간 바닥판콘크리트와 정모멘트 구간 하부플랜지에 압축응력을도입시키는 시공법
CN215405528U (zh) 一种适用于不对称转体的桥梁结构
CN214328478U (zh) 一种三塔自锚式悬索桥
JP2002275833A (ja) 既設橋梁の単純桁の連続化方法及び連続桁構造
CN113005874A (zh) 一种采用钢桁-砼预制结合梁段的梁拱组合桥及施工方法
CN219240256U (zh) 用于城市连续高架桥的建造结构
KR100437258B1 (ko) 활절라멘교의 보수보강방법
KR20000058716A (ko) 빔과 교각을 일체화시키고 단부 지점을 하강 및상승시키는 다경간 연속 합성형의 시공법
Grubb et al. Construction issues in steel curved-girder bridges

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 1200201060

Country of ref document: VN

AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG US UZ VN YU ZA ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWE Wipo information: entry into national phase

Ref document number: 1020027016528

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 008196303

Country of ref document: CN

WWP Wipo information: published in national office

Ref document number: 1020027016528

Country of ref document: KR

122 Ep: pct application non-entry in european phase
NENP Non-entry into the national phase

Ref country code: JP

WWG Wipo information: grant in national office

Ref document number: 1020027016528

Country of ref document: KR