WO1999058787A1 - New process for mounting handrails in scaffolds - Google Patents

New process for mounting handrails in scaffolds Download PDF

Info

Publication number
WO1999058787A1
WO1999058787A1 PCT/ES1998/000130 ES9800130W WO9958787A1 WO 1999058787 A1 WO1999058787 A1 WO 1999058787A1 ES 9800130 W ES9800130 W ES 9800130W WO 9958787 A1 WO9958787 A1 WO 9958787A1
Authority
WO
WIPO (PCT)
Prior art keywords
railing
auxiliary
bars
scaffolding
fixing
Prior art date
Application number
PCT/ES1998/000130
Other languages
Spanish (es)
French (fr)
Other versions
WO1999058787A8 (en
Inventor
Javier Galdos Urzelai
Original Assignee
Ulma C Y E, S. Coop.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ulma C Y E, S. Coop. filed Critical Ulma C Y E, S. Coop.
Priority to US09/462,065 priority Critical patent/US20020053486A1/en
Priority to EP98917136A priority patent/EP0995860A1/en
Priority to BR9810578A priority patent/BR9810578A/en
Priority to AU70447/98A priority patent/AU7044798A/en
Priority to PCT/ES1998/000130 priority patent/WO1999058787A1/en
Publication of WO1999058787A1 publication Critical patent/WO1999058787A1/en
Publication of WO1999058787A8 publication Critical patent/WO1999058787A8/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/144Railings specific for the lateral, i.e. short side of a scaffold
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform

Definitions

  • the present invention consists of a new procedure for mounting the railings on the scaffolding used in the construction sector, making the first element that is mounted on each floor of the scaffold to be precisely the railing, so that this safety measure is present during all phases of scaffolding assembly.
  • the invention provides the advantage over known systems, of greater comfort in carrying out the task of assembling the safety railing, while being able to shape it from a very simple piece, usable in variable number and in combination with the own scaffolding system bars.
  • scaffolding is a fundamental work tool in construction, in which safety measures must be taken, by heights so high that they can reach and because they are in them from where much of the work takes place.
  • accident prevention measures are taken, such as the harnesses that secure the worker to the structure of the roads, and the railings that prevent the worker from falling into a vacuum from the work platform.
  • the new procedure for assembling safety railings on scaffolding has been devised to solve the above-mentioned problem, since it greatly simplifies the operation of placing the previous or provisional safety railing from the lower platform, and can be performed by a single operator.
  • the previous safety railing conforms to the scaffolding bars themselves and a piece that constitutes the soul of the system, an auxiliary piece that from now on will be called indistinctly railing foot, which serves to assemble the railing, raise it to the immediately upper floor and fix it or fasten it to the frames that are part of the scaffolding structure, all this before the rest of the elements that constitute the scaffolding are mounted on that level or floor of the scaffold.
  • the auxiliary piece or foot of railing has means, identical to those of the scaffolding itself, to fix the horizontal bars, as well as means for fixing the reinforced safety railing to the frames of the scaffolding
  • the auxiliary part or railing foot takes the form of a very open angle such that the first section incorporates the means for fixing the frame, which, once the auxiliary part is mounted on the frame, is divergent with respect to the frame , to extend parallel to it from a practically central point.
  • the divergent section incorporates the means for fixing the auxiliary part or railing foot to the frame, while the parallel section incorporates the means for fixing the bars.
  • the assembly of the railing is carried out from the platform of a lower level on a provisional basis, making this the first component mounted on the immediately higher level.
  • the assembly of the previous safety railing or provisional safety railing begins with the gradual assembly of the same, for which the bars are joined to a first auxiliary element or railing foot, by means of conventional hooking systems and typical of the system of scaffold.
  • This auxiliary foot with the bars fastened by one of its ends is lifted and then fixed to the corresponding frame of the scaffold, for which it is equipped with a central hook and an end plate that is inserted into two receiving lugs provided in the frame.
  • the bars are joined at the other end to a new auxiliary piece or railing foot to which, in turn, joins another set of bars that will be part of the next section of safety railing.
  • the second auxiliary part is raised and attached to the corresponding frame, similar to the first, being the first section of railing. This maneuver is repeated as many times as the railing length required by the scaffold requires.
  • the rest of the elements that form the scaffold are installed on that level or floor, such as platforms, baseboards, horizontal bars, diagonal bars (if necessary), side rails, etc.
  • the bars themselves that have been part of the provisional railing remain at that level forming the fixed protection railing, that is, they remain at that level as structural elements of the scaffolding itself.
  • the assembly of a new safety railing can be started for the next floor.
  • FIG. 1 is a perspective view of the general structure of a scaffold floor, in the preparation phase for the assembly of the previous railing or provisional railing of the upper level.
  • - Figure 2 is a representation similar to the previous one, where the first auxiliary element or railing foot has been mounted in the corresponding frame.
  • FIG. 3 is a representation similar to the previous ones, where the provisional assembly of a first section of the previous railing has been completed and the assembly of a second section has begun.
  • FIG. 7 is a profile view of the auxiliary part or scaffold foot and the part of the frame to which it is attached.
  • the auxiliary part or railing foot (1) has been represented in detail in Figure 7, where it is appreciated that it is constituted by a preferably square tubular bar, which disposes at a higher level of the conventional means of fixing (6) of the bars (two) . At a lower level it is fixed by welding the fasteners to the frame (3), consisting of the upper hook (7) and the lower plate (8), which can be inserted into two lugs (9) and (10) of said frame.
  • the lugs (9) and (10) consist of “U” profiles that form a vertical hole together with the frame bar (3) to which they are fixed.
  • the upper hook (7) also consists of a "U” profile, capable of being inserted in the upper lug (9), while the lower plate (8), close to the lower end of the auxiliary part or railing foot (1 ), comes from a "U” profile arranged in such a way that it borders laterally the front bar of the frame (3) and whose plate is intended to be inserted into the lower lug (10).
  • the auxiliary part (1) is held on the scaffold, preventing its movement in all directions, except upwards.
  • the first auxiliary part or railing foot (1) is partially raised and fixed to the frame (3) by means of the hook (7) and plate (8) that fit into the respective lugs (9) and (10) of the framework (3).
  • the ends of the bars that were left free join a second auxiliary piece or railing foot (1 ') that also receives another new set of bars (2').
  • This assembly process is repeated as many times as necessary to form the sections of railing bars required by the front of the facade covered by the scaffolding.
  • each auxiliary piece or railing foot (1) has its inclined lower section as shown in Figure 7, so that the rest of the foot (1 ) and the railing bars (2), are in a plane more frontal than the frame (3), so that the upper side frame can be telescopically coupled.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Ladders (AREA)

Abstract

The invention finds application as security means in the mounting of scaffolds for the construction industry, particularly in the mounting of handrails. These handrails are the first component to be installed at the upper level, the mounting being carried out from the level where the operator is situated so that when the latter goes up to complete the scaffold he founds a security handrail already mounted. The prior handrail is assembled, elevated and mounted with the help of an auxiliary part or handrail foot to which are connected the horizontal bars, said auxiliary part being fixed by means of appropriate means to the structure frames of the scaffold.

Description

NUEVO PROCEDIMIENTO DE MONTAJE DE BARANDILLAS NEW RAILING ASSEMBLY PROCEDURE
EN ANDAMIOSIN ANDAMIOS
D E S C R I P C I Ó ND E S C R I P C I Ó N
OBJETO DE LA INVENCIÓNOBJECT OF THE INVENTION
La presente invención consiste en un nuevo procedimiento para montar las barandillas en los andamios utilizados en el sector de la construcción, haciendo que el primer elemento que se monta de cada piso del andamio sea precisamente la barandilla, de forma que esta medida de seguridad esté presente durante todas las fases de montaje del andamio.The present invention consists of a new procedure for mounting the railings on the scaffolding used in the construction sector, making the first element that is mounted on each floor of the scaffold to be precisely the railing, so that this safety measure is present during all phases of scaffolding assembly.
La invención aporta la ventaja sobre sistemas conocidos, de una mayor comodidad en la realización de la tarea de montaje de la barandilla de seguridad, a la vez que consigue conformarla a partir de una pieza muy sencilla, utilizable en número variable y en combinación con las propias barras del sistema de andamio.The invention provides the advantage over known systems, of greater comfort in carrying out the task of assembling the safety railing, while being able to shape it from a very simple piece, usable in variable number and in combination with the own scaffolding system bars.
ANTECEDENTES DE LA INVENCIÓNBACKGROUND OF THE INVENTION
En el sector de la construcción, uno de los aspectos más importantes a tener en cuenta es el de la seguridad de los trabajadores, ya que por las condiciones en las que se deben realizar estos trabajos, esta actividad laboral se convierte en una tarea potencialmente peligrosa en la que se pueden dar graves accidentes.In the construction sector, one of the most important aspects to take into account is that of workers' safety, since due to the conditions under which these jobs must be performed, this work activity becomes a potentially dangerous task. in which serious accidents can occur.
En este sentido, los andamios son una herramienta de trabajo fundamental en la construcción, en la que se deben extremar las medidas de seguridad, por las alturas tan elevadas que pueden alcanzar y porque son en ellos desde donde se desarrolla gran parte del trabajo.In this sense, scaffolding is a fundamental work tool in construction, in which safety measures must be taken, by heights so high that they can reach and because they are in them from where much of the work takes place.
Para ello se toman medidas de prevención de accidentes, como los arneses que aseguran al trabajador a la estructura de los anda ios, y las barandillas que evitan que el trabajador pueda caer al vacío desde la plataforma de trabajo.For this, accident prevention measures are taken, such as the harnesses that secure the worker to the structure of the roads, and the railings that prevent the worker from falling into a vacuum from the work platform.
Sin embargo, durante el montaje de los andamios existen momentos de desprotección, cuando el operario accede a la plataforma superior para completar el montaje de ese nivel, donde todavía no se ha instalado la barandilla fija de protección, con lo que éste realiza su trabajo durante un tiempo sin esta protección.However, during the assembly of the scaffolding there are moments of unprotection, when the operator accesses the upper platform to complete the assembly of that level, where the fixed protection railing has not yet been installed, with which he performs his work during A time without this protection.
Para paliar esta deficiencia, se conoce actualmente un elemento denominado "barandilla francesa" , incorporable al andamio, que constituye una solución idónea, por cuanto dicha "barandilla francesa" se monta en el piso superior antes del montaje del resto de elementos que componen la estructura, es decir, antes de que los operarios comiencen el montaje del andamio en ese nivel.To alleviate this deficiency, an element known as "French railing", which can be incorporated into the scaffold, is now known, which constitutes an ideal solution, since said "French railing" is mounted on the upper floor before mounting the rest of the elements that make up the structure. , that is, before the operators begin assembling the scaffolding at that level.
Sin embargo, este sistema de "barandilla francesa", que funcionalmente aporta óptimos resultados, presenta problemas derivados de su propia dimensión, ya que al tratarse de una pieza de tamaño considerable, que queda integrada en el andamio como parte de su estructura, requiere para su manejo y montaje, al menos, dos operarios.However, this "French railing" system, which functionally provides excellent results, presents problems derived from its own dimension, since being a piece of considerable size, which is integrated into the scaffold as part of its structure, it requires its handling and assembly, at least, two operators.
Al problema anteriormente indicado, ha de añadirse los propios del transporte de las citadas piezas y de su almacenaje, tanto en la fase de transporte desde almacén a pie de obra, como su ubicación a propio pie de obra, consecuencia, como se indicaba antes, de su considerable tamaño.To the aforementioned problem, those of the transport of the aforementioned pieces and their transport must be added storage, both in the transport phase from warehouse to work site, as well as its location to work site, consequence, as indicated above, of its considerable size.
De hecho, con ser la "barandilla francesa" una buena solución en cuanto a seguridad se refiere, su uso no está muy extendido debido a que existe un cierto rechazo por los aspectos negativos derivados de la problemática anteriormente expuesta.In fact, with the "French railing" being a good solution as far as safety is concerned, its use is not very widespread because there is a certain rejection of the negative aspects derived from the aforementioned problem.
DESCRIPCIÓN DE LA INVENCIÓNDESCRIPTION OF THE INVENTION
El nuevo procedimiento de montaje de barandillas de seguridad en andamios, ha sido ideado para resolver la problemática anteriormente expuesta, ya que simplifica en gran medida la operación de colocar la barandilla previa o provisional de seguridad desde la plataforma inferior, pudiendo ser realizada por un solo operario.The new procedure for assembling safety railings on scaffolding, has been devised to solve the above-mentioned problem, since it greatly simplifies the operation of placing the previous or provisional safety railing from the lower platform, and can be performed by a single operator.
A la vez, la barandilla previa de seguridad se conforma con las propias barras del andamio y una pieza que constituye el alma del sistema, pieza auxiliar que a partir de ahora se denominará indistintamente pie de barandilla, la cual sirve para armar la barandilla, izarla al piso inmediatamente superior y fijarla o sujetarla a los marcos que forman parte de la estructura del andamio, todo ello antes de que en ese nivel o piso del andamio se monten el resto de los elementos que constituyen el andamiaje.At the same time, the previous safety railing conforms to the scaffolding bars themselves and a piece that constitutes the soul of the system, an auxiliary piece that from now on will be called indistinctly railing foot, which serves to assemble the railing, raise it to the immediately upper floor and fix it or fasten it to the frames that are part of the scaffolding structure, all this before the rest of the elements that constitute the scaffolding are mounted on that level or floor of the scaffold.
La pieza auxiliar o pie de barandilla cuenta con medios, idénticos a los del propio andamio, para fijar las barras horizontales, así como medios para la fijación de la barandilla de seguridad armada a los marcos del andamio .The auxiliary piece or foot of railing has means, identical to those of the scaffolding itself, to fix the horizontal bars, as well as means for fixing the reinforced safety railing to the frames of the scaffolding
s La pieza auxiliar o pie de barandilla adopta la forma de un ángulo muy abierto de tal manera que el primer tramo incorpora los medios de fijación al marco, tramo que, una vez montada la pieza auxiliar en el marco, resulta divergente con respecto al marco, para extenderse paralelamente al mismo a partir de un punto prácticamente central. El tramo divergente incorpora los medios para fijar la pieza auxiliar o pie de barandilla al marco, en tanto que el tramo paralelo incorpora los medios para la fijación de las barras.s The auxiliary part or railing foot takes the form of a very open angle such that the first section incorporates the means for fixing the frame, which, once the auxiliary part is mounted on the frame, is divergent with respect to the frame , to extend parallel to it from a practically central point. The divergent section incorporates the means for fixing the auxiliary part or railing foot to the frame, while the parallel section incorporates the means for fixing the bars.
El montaje de la barandilla se realiza desde la plataforma de un nivel inferior de forma provisional, haciendo que éste sea el primer componente montado en el nivel inmediatamente superior.The assembly of the railing is carried out from the platform of a lower level on a provisional basis, making this the first component mounted on the immediately higher level.
El montaje de la barandilla previa de seguridad o barandilla provisional de seguridad se inicia con el armado paulatinamente de la misma, para lo cual las barras se unen a un primer elemento auxiliar o pie de barandilla, mediante sistemas de enganche convencionales y propios del sistema de andamio. Este pie auxiliar con las barras sujetas por uno de sus extremos se iza y seguidamente se fija al marco correspondiente del andamio, para lo cual va dotado de un gancho central y de una pletina extrema que se introduce en sendas orejetas receptoras previstas en el marco. Seguidamente las barras se unen por el otro extremo a una nueva pieza auxiliar o pie de barandilla a la que, a su vez, se une otro juego de barras que formarán parte del siguiente tramo de barandilla de seguridad. La segunda pieza auxiliar se eleva y sujeta al correspondiente marco, de forma similar a la primera, quedando conformado el primer tramo de barandilla. Esta maniobra se repite tantas veces como lo exija la longitud de barandilla que el andamio exija.The assembly of the previous safety railing or provisional safety railing begins with the gradual assembly of the same, for which the bars are joined to a first auxiliary element or railing foot, by means of conventional hooking systems and typical of the system of scaffold. This auxiliary foot with the bars fastened by one of its ends is lifted and then fixed to the corresponding frame of the scaffold, for which it is equipped with a central hook and an end plate that is inserted into two receiving lugs provided in the frame. Next, the bars are joined at the other end to a new auxiliary piece or railing foot to which, in turn, joins another set of bars that will be part of the next section of safety railing. The second auxiliary part is raised and attached to the corresponding frame, similar to the first, being the first section of railing. This maneuver is repeated as many times as the railing length required by the scaffold requires.
Una vez montada la barandilla de seguridad se instalan en ese nivel o piso el resto de elementos que forman el andamio, tales como plataformas, rodapiés, barras horizontales, barras diagonales (si hicieran falta), barandillas laterales, etc. Las propias barras que han formado parte de la barandilla provisional quedan en ese nivel formando la barandilla fija de protección, es decir, permanecen en ese nivel como elementos estructurales del propio andamio. Obviamente, con las piezas auxiliares o pies de barandillas recuperados, podrá iniciarse el montaje de una nueva barandilla previa de seguridad para el siguiente piso.Once the safety railing is mounted, the rest of the elements that form the scaffold are installed on that level or floor, such as platforms, baseboards, horizontal bars, diagonal bars (if necessary), side rails, etc. The bars themselves that have been part of the provisional railing remain at that level forming the fixed protection railing, that is, they remain at that level as structural elements of the scaffolding itself. Obviously, with the auxiliary parts or feet of rails recovered, the assembly of a new safety railing can be started for the next floor.
Los medios convencionales a los que se ha hecho alusión para la unión de las piezas auxiliares a las barras para armar la barandilla, consisten en vastagos solidarios a las piezas auxiliaresThe conventional means to which reference has been made for the attachment of the auxiliary parts to the bars to assemble the railing, consist of shafts integral with the auxiliary parts.
DESCRIPCIÓN DE LOS DIBUJOSDESCRIPTION OF THE DRAWINGS
Para completar la descripción que se está realizando y con objeto de ayudar a una mejor comprensión de las características del invento, se acompaña a esta memoria descriptiva, como parte integrante de la misma, un conjunto de dibujos en donde con carácter ilustrativo y no limitativo, se ha representado lo siguiente:To complete the description that is being made and in order to help a better understanding of the characteristics of the invention, this descriptive report is attached, as an integral part thereof, a set of drawings where illustrative and not limiting, The following has been represented:
- La figura 1, es una vista en perspectiva de la estructura general de un piso de andamio, en la fase de preparación para el montaje de la barandilla previa o barandilla provisional del nivel superior. - La figura 2, es una representación similar a la anterior, donde se ha montado el primer elemento auxiliar o pie de barandilla en el correspondiente marco.- Figure 1 is a perspective view of the general structure of a scaffold floor, in the preparation phase for the assembly of the previous railing or provisional railing of the upper level. - Figure 2 is a representation similar to the previous one, where the first auxiliary element or railing foot has been mounted in the corresponding frame.
- La figura 3, es una representación similar a las anteriores, donde se ha completado el montaje provisional de un primer tramo de la barandilla previa y se ha iniciado el montaje de un segundo tramo.- Figure 3 is a representation similar to the previous ones, where the provisional assembly of a first section of the previous railing has been completed and the assembly of a second section has begun.
- La figura 4, de manera similar representa montada una barandilla previa de seguridad de dos tramos.- Figure 4, similarly depicts a two-section safety railing mounted.
- La figura 5, representa la incorporación de los elementos restantes de este nivel, y cómo las barras de la barandilla pasan de forma definitiva a estar fijadas a la estructura del andamio, formando la barandilla fija de protección.- Figure 5 represents the incorporation of the remaining elements of this level, and how the railing bars finally become fixed to the scaffolding structure, forming the fixed guardrail.
- La figura 6, es la ampliación de sendos detalles de los medios mediante los que la pieza auxiliar o pie de barandilla se fija al marco del andamio.- Figure 6, is the extension of two details of the means by which the auxiliary piece or railing foot is fixed to the scaffolding frame.
- La figura 7, es una vista en perfil la pieza auxiliar o pie de andamio y de la parte del marco al que se acopla.- Figure 7 is a profile view of the auxiliary part or scaffold foot and the part of the frame to which it is attached.
REALIZACIÓN PREFERENTE DE LA INVENCIÓNPREFERRED EMBODIMENT OF THE INVENTION
La pieza auxiliar o pie de barandilla (1) ha sido representado en detalle en la figura 7, donde se aprecia que está constituida por una barra preferentemente tubular cuadrada, que dispone a nivel superior de los medios convencionales de fijación (6) de las barras (2) . A nivel inferior lleva fijados por soldadura los elementos de sujeción al marco (3) , consistentes en el gancho superior (7) y la pletina inferior (8) , que pueden introducirse en sendas orejetas (9) y (10) del citado marco.The auxiliary part or railing foot (1) has been represented in detail in Figure 7, where it is appreciated that it is constituted by a preferably square tubular bar, which disposes at a higher level of the conventional means of fixing (6) of the bars (two) . At a lower level it is fixed by welding the fasteners to the frame (3), consisting of the upper hook (7) and the lower plate (8), which can be inserted into two lugs (9) and (10) of said frame.
Observando la figura 6, se aprecia que las orejetas (9) y (10) consisten en perfiles en "U" que forman un orificio vertical junto con la barra del marco (3) al que están fijadas. El gancho superior (7) también consiste en un perfil en "U", capaz de introducirse en la orejeta superior (9) , mientras que la pletina inferior (8), próxima al extremo inferior de la pieza auxiliar o pie de barandilla (1) , procede de un perfil en "U" dispuesto de forma que bordea lateralmente la barra frontal del marco (3) y cuya pletina está destinada a introducirse en la orejeta inferior (10).Looking at Figure 6, it can be seen that the lugs (9) and (10) consist of "U" profiles that form a vertical hole together with the frame bar (3) to which they are fixed. The upper hook (7) also consists of a "U" profile, capable of being inserted in the upper lug (9), while the lower plate (8), close to the lower end of the auxiliary part or railing foot (1 ), comes from a "U" profile arranged in such a way that it borders laterally the front bar of the frame (3) and whose plate is intended to be inserted into the lower lug (10).
Mediante ambas fijaciones la pieza auxiliar (1) se sostiene en el andamio, quedando impedido su movimiento en todas direcciones, excepto en sentido ascendente.By means of both fixations, the auxiliary part (1) is held on the scaffold, preventing its movement in all directions, except upwards.
Para formar la barandilla previa de seguridad, tal y como se ha representado en la figura 1, el operario fija las barras (2) por uno de sus extremos a la pieza auxiliar (1) dejando libres los otros extremos. En la unión intervienen los medios convencionales (6) .To form the previous safety railing, as shown in figure 1, the operator fixes the bars (2) by one of its ends to the auxiliary part (1) leaving the other ends free. Conventional means are involved in the union (6).
Como se aprecia en la figura 2, se eleva parcialmente la primera pieza auxiliar o pie de barandilla (1) y se fija al marco (3) mediante el gancho (7) y pletina (8) que encajan en las respectivas orejetas (9) y (10) del marco (3). Seguidamente, los extremos de las barras que habían quedado libres se unen a una segunda pieza auxiliar o pie de barandilla (1') que también recibe otro nuevo juego de barras (2'). En el siguiente paso, representado en la figura 3, consiste en izar la barandilla, elevando la segunda pieza auxiliar o pie de barandilla (1") y fijándola de forma equivalente al primero en el marco correspondiente, con lo que habrá quedado completado el primer tramo de barandilla y parcialmente armado el segundo tramo, que se conformará una vez unidas por su extremo libre las barras ( 2 ' ) a otra pieza auxiliar (1''), tal y como se ilustra en la figura 5.As can be seen in figure 2, the first auxiliary part or railing foot (1) is partially raised and fixed to the frame (3) by means of the hook (7) and plate (8) that fit into the respective lugs (9) and (10) of the framework (3). Next, the ends of the bars that were left free join a second auxiliary piece or railing foot (1 ') that also receives another new set of bars (2'). In the next step, represented in figure 3, it is to raise the railing, raising the second auxiliary piece or railing foot (1 ") and fixing it in an equivalent way to the first in the corresponding frame, which will have completed the first section of railing and partially assembled the second section, which will be formed once joined by its free end the bars (2 ') to another auxiliary piece (1''), as illustrated in Figure 5.
Este proceso de montaje se repite tantas veces como sea necesario para formar los tramos de barras de barandilla que requiera el frente de fachada cubierta por el andamio.This assembly process is repeated as many times as necessary to form the sections of railing bars required by the front of the facade covered by the scaffolding.
Como se ilustra en la figura 5, una vez finalizado el montaje provisional de la barandilla previa o provisional de seguridad, se procede a montar el resto de elementos, como son los marcos (3) , las barandillas laterales (4) , los rodapiés (5) , las plataformas (11) , etc. En esta fase del montaje y para posibilitar el acoplamiento de los marcos (3) , cada pieza auxiliar o pie de barandilla (1) dispone de su tramo inferior inclinado como se aprecia en la figura 7, de forma que el resto del pie (1) y las barras de la barandilla (2), queden en un plano más frontal que el marco (3) , para poder acoplar telescópicamente el marco lateral superior.As illustrated in Figure 5, once the provisional assembly of the previous or provisional safety railing is finished, the rest of the elements are assembled, such as the frames (3), the side rails (4), the skirting boards ( 5), platforms (11), etc. In this phase of the assembly and to enable the coupling of the frames (3), each auxiliary piece or railing foot (1) has its inclined lower section as shown in Figure 7, so that the rest of the foot (1 ) and the railing bars (2), are in a plane more frontal than the frame (3), so that the upper side frame can be telescopically coupled.
Posteriormente se retiran las barras de las barandillas (2) y (2') de sus fijaciones en los pies (1) , para fijarlas en los marcos laterales (3) del andamio, pasando estas a formar parte de la estructura y formando la barandilla de seguridad definitiva. Subsequently, the bars of the railings (2) and (2 ') are removed from their fixations on the feet (1), to fix them on the side frames (3) of the scaffolding, becoming these part of the structure and forming the railing of definitive security.

Claims

R E I V I N D I C A C I O N E S R E I V I N D I C A C I O N E S
1§.- Nuevo procedimiento de montaje de barandillas en andamios, destinado a que como medida de seguridad, el primer elemento que se monta de cada piso del andamio sea una barandilla, realizándose este montaje desde el piso inferior, caracterizado porque una barandilla previa de seguridad o provisional se arma a partir de una pieza auxiliar o pie de barandilla (1) a la que se une con medios convencionales (6) las barras (2) utilizándose dicha pieza auxiliar (1) para izar y fijar progresivamente los correspondientes tramos de barandilla, armados o prearmados, a los respectivos marcos estructurales del andamio, habiéndose previsto para la fijación de las piezas auxiliares (1) a los marcos (3) que éstos presenten sendas orejetas (9) y (10) y la pieza auxiliar (1) , un perfil en "U" invertida a modo de gancho que juega en la orejeta (9) y otro perfil en "U", próximo a su extremo, que abraza lateralmente la pieza auxiliar (1) y que se prolonga en una pletina que encaja en la orejeta (10) del marco.1 § .- New procedure for assembling railings on scaffolding, designed to ensure that, as a safety measure, the first element mounted on each floor of the scaffold is a railing, this assembly being carried out from the lower floor, characterized in that a previous railing of safety or provisional is assembled from an auxiliary piece or railing foot (1) to which the bars (2) are joined with conventional means (6) using said auxiliary piece (1) to hoist and gradually fix the corresponding sections of railing, armed or pre-assembled, to the respective structural frames of the scaffolding, having been provided for the fixing of the auxiliary parts (1) to the frames (3) that these have two lugs (9) and (10) and the auxiliary part (1 ), an inverted "U" profile as a hook that plays on the lug (9) and another "U" profile, close to its end, which laterally embraces the auxiliary part (1) and extends into a plate that fits the lug (10) of the frame.
2§.- Nuevo procedimiento de montaje de barandillas en andamios, según la reivindicación la, caracterizado porque el operario conforma parcialmente la barandilla previa o provisional de seguridad en el piso desde el que se está montando, fijando los extremos homólogos de las barras (2) de la barandilla a los medios de fijación convencionales previstos en la pieza auxiliar (1) , dejando los otros extremos libres para, posteriormente, elevar manualmente el conjunto, fijando la pieza auxiliar a la estructura del andamio, y repitiendo el mismo procedimiento con otra a la que previamente se fijan los extremos que habían quedado libres y los extremos del grupo de barras que forman el siguiente tramo de barandilla, y así sucesivamente con hasta completar la longitud de barandilla requerida, para continuar posteriormente con el montaje del resto de elementos con los que se constituye cada piso del andamio, de forma que una vez que se ha completado su instalación, las barras de la barandilla previa son retiradas de sus fijaciones en las piezas auxiliares y se fijan definitivamente a los marcos para constituir la barandilla fija, en tanto que las piezas auxiliares (1) se recuperan para iniciar la tarea de armado, izado y montaje de la barandilla previa de seguridad del piso inmediatamente superior.2 § .- New procedure for assembling railings on scaffolding, according to claim la, characterized in that the operator partially forms the previous or provisional safety railing on the floor from which it is being mounted, fixing the homologous ends of the bars (2 ) from the railing to the conventional fixing means provided in the auxiliary part (1), leaving the other ends free to subsequently manually lift the assembly, fixing the auxiliary part to the scaffolding structure, and repeating the same procedure with another to which the ends that had been left free and the ends of the group of bars that form the next section of railing, and so on with until completing the required railing length, to continue later with the assembly of the rest of the elements with which each floor of the scaffold is constituted, so that once its installation has been completed, the bars of the previous railing are removed from their fixings in the auxiliary parts and are permanently fixed to the frames to constitute the fixed railing, while the auxiliary parts (1) are recovered to start the task of assembling, lifting and assembling the previous railing of immediately superior floor security.
3§.- Nuevo procedimiento de montaje de barandillas en andamios, que según reivindicaciones anteriores, se caracteriza porque la pieza auxiliar o pie de barandilla (1) presenta dos tramos que forman entre sí un ángulo muy abierto, de manera que el tramo inferior, que tras el montaje al marco de la citada pieza auxiliar resulta divergente, comprende los elementos de fijación al citado marco, en tanto que el otro tramo que, tras el montaje, queda en posición paralela al marco, contiene los medios de fijación de las barras (2) . 3 § .- New procedure for assembling railings on scaffolding, which according to previous claims, is characterized in that the auxiliary part or railing foot (1) has two sections that form a very open angle to each other, so that the lower section, that after mounting to the frame of said auxiliary part is divergent, it comprises the fixing elements to said frame, while the other section that, after assembly, is parallel to the frame, contains the means for fixing the bars (two) .
PCT/ES1998/000130 1998-05-08 1998-05-08 New process for mounting handrails in scaffolds WO1999058787A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US09/462,065 US20020053486A1 (en) 1998-05-08 1998-05-08 New process for mounting handrails in scaffolds
EP98917136A EP0995860A1 (en) 1998-05-08 1998-05-08 New process for mounting handrails in scaffolds
BR9810578A BR9810578A (en) 1998-05-08 1998-05-08 Assembly procedure for scaffolding rails
AU70447/98A AU7044798A (en) 1998-05-08 1998-05-08 New process for mounting handrails in scaffolds
PCT/ES1998/000130 WO1999058787A1 (en) 1998-05-08 1998-05-08 New process for mounting handrails in scaffolds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/ES1998/000130 WO1999058787A1 (en) 1998-05-08 1998-05-08 New process for mounting handrails in scaffolds

Publications (2)

Publication Number Publication Date
WO1999058787A1 true WO1999058787A1 (en) 1999-11-18
WO1999058787A8 WO1999058787A8 (en) 2000-03-30

Family

ID=8302504

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/ES1998/000130 WO1999058787A1 (en) 1998-05-08 1998-05-08 New process for mounting handrails in scaffolds

Country Status (4)

Country Link
US (1) US20020053486A1 (en)
EP (1) EP0995860A1 (en)
AU (1) AU7044798A (en)
WO (1) WO1999058787A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1134331A3 (en) * 2000-03-13 2003-06-04 Günter Rux Gmbh Set of elements for a scaffold
AU784907B2 (en) * 2001-05-31 2006-07-27 Tatsuo Ono Mounting method for a handrail in a frame scaffolding
US7162088B2 (en) 1999-05-25 2007-01-09 Silverbrook Research Pty Ltd Notetaking method incorporating coded data sensor
GB2476955A (en) * 2010-01-15 2011-07-20 David Michael Ward Temporary guard rail for mounting on a scaffolding level

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2364733C (en) * 2000-05-12 2005-06-29 David Michael Kelk Improvements in and relating to builders' trestles
ES2203270B1 (en) * 2001-02-14 2005-02-16 Ingenieria De Encofrados Y Servicios, S.L. PERFECTION IN ANDAMIOS DE FACHADA.
SE521500C2 (en) 2001-03-27 2003-11-04 Pluseight Safety Ab Device for personal protection at scaffolding and method for protecting persons by such device
GB0126446D0 (en) * 2001-11-03 2002-01-02 R S Scaffolding N W Ltd Improvements in and relating to scaffolding
ATE453771T1 (en) * 2002-02-20 2010-01-15 Layher W Verwaltungs Gmbh DEVICE FOR MOUNTING A TEMPORARY RAILING HANDLE OF A SCAFFOLDING
DE10243356B4 (en) * 2002-07-22 2007-03-22 Peri Gmbh Dismountable scaffolding
SE525339C2 (en) * 2002-09-27 2005-02-01 Pluseight Safety Ab Device for personal protection at scaffolding
US20050061582A1 (en) * 2004-12-10 2005-03-24 Karanouh Rached Movable and repositionable safety guard rails for scaffolding
ITMI20081670A1 (en) * 2008-09-22 2010-03-23 Montesanti Costruzioni Sas Di Giuse Ppe Montesanti STAND FOR THE TOTAL SAFETY OF THE PONTISTS
WO2015033278A1 (en) * 2013-09-05 2015-03-12 Afix Group N.V. Method for mounting a scaffold
BE1021482B1 (en) * 2013-09-05 2015-11-30 Afix Group N.V. METHOD FOR MOUNTING A SCAFFOLDING
JP6235851B2 (en) * 2013-10-01 2017-11-22 アルインコ株式会社 Safety device for leading handrail
JP6210822B2 (en) * 2013-10-01 2017-10-11 アルインコ株式会社 Safety device for leading handrail
US12084876B2 (en) 2019-09-20 2024-09-10 Sunshine Enterprise Group Eu Limited Temporary scaffolding rest
EP3916172A1 (en) * 2020-05-26 2021-12-01 ALTRAD plettac assco GmbH Front side protection module
TWI824821B (en) * 2022-11-15 2023-12-01 吳宗和 Mounting rack and installation method for vertical warehouse shelf

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2516141A1 (en) * 1981-11-10 1983-05-13 Philippe Robert Scaffolding erection procedure - has two base frames braced to take next level of guard rails and decking
FR2533610A1 (en) * 1982-09-23 1984-03-30 Somefran Method for installing a scaffold, bracing used for the implementation of this method and scaffold equipped with the said bracing.
GB2137274A (en) * 1983-03-26 1984-10-03 Eberhard Layher Safety device for scaffolding
FR2732706A1 (en) * 1995-04-10 1996-10-11 Comabi Const Mat Batiment Single piece safety rails for outer edge of scaffolding
WO1998007934A1 (en) * 1996-08-16 1998-02-26 Peri Gmbh Dismountable facade scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2516141A1 (en) * 1981-11-10 1983-05-13 Philippe Robert Scaffolding erection procedure - has two base frames braced to take next level of guard rails and decking
FR2533610A1 (en) * 1982-09-23 1984-03-30 Somefran Method for installing a scaffold, bracing used for the implementation of this method and scaffold equipped with the said bracing.
GB2137274A (en) * 1983-03-26 1984-10-03 Eberhard Layher Safety device for scaffolding
FR2732706A1 (en) * 1995-04-10 1996-10-11 Comabi Const Mat Batiment Single piece safety rails for outer edge of scaffolding
WO1998007934A1 (en) * 1996-08-16 1998-02-26 Peri Gmbh Dismountable facade scaffold

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7162088B2 (en) 1999-05-25 2007-01-09 Silverbrook Research Pty Ltd Notetaking method incorporating coded data sensor
EP1134331A3 (en) * 2000-03-13 2003-06-04 Günter Rux Gmbh Set of elements for a scaffold
AU784907B2 (en) * 2001-05-31 2006-07-27 Tatsuo Ono Mounting method for a handrail in a frame scaffolding
GB2476955A (en) * 2010-01-15 2011-07-20 David Michael Ward Temporary guard rail for mounting on a scaffolding level
GB2476955B (en) * 2010-01-15 2012-01-04 David Michael Ward Temporary safety rail for scaffolding

Also Published As

Publication number Publication date
WO1999058787A8 (en) 2000-03-30
EP0995860A1 (en) 2000-04-26
AU7044798A (en) 1999-11-29
US20020053486A1 (en) 2002-05-09

Similar Documents

Publication Publication Date Title
WO1999058787A1 (en) New process for mounting handrails in scaffolds
US6422345B1 (en) Dismountable facade scaffold
US7975803B2 (en) Dismantlable scaffold and a railing adapter for it
CA2531461C (en) Scaffold frame section with integral guard rail post
CA2896299C (en) Jump form system
EP1233122B1 (en) Facade scaffolding
ES2976565T3 (en) Stair railing, frame system and method for mounting a stair railing
RU2400609C2 (en) Complex system of accident prevention support in construction
EP1267014A1 (en) Safety device
ES2321132T3 (en) LADDER SUPPORT MENSULA.
US6015028A (en) Pump jack hoisting apparatus including a safety railing for protecting workers from accidental falling
ES2355949T3 (en) ELEVATOR PLATFORM AND PROCEDURE FOR THE ASSEMBLY OF AN ELEVATOR PLATFORM.
AU2019204814A1 (en) Scaffolding system
GB2032504A (en) Scaffold Frames
AU2008100567A4 (en) A scaffolding stand for use in a formwork support system
EP1441088A2 (en) Multifunction scaffolding
KR200400391Y1 (en) Structure of scaffold frame installed with fall-down preventive rail
ES2221330T3 (en) FRAMEWORK FOR ANDAMIO FLOORS, AND ANDAMIO CONSTITUTED BY SUCH FLOORS.
JPH047317Y2 (en)
JPH0318580Y2 (en)
PT94368B (en) DEMONTABLE BANK (TRIBUNAL) WITH BALLOON
KR200302136Y1 (en) Assembling work safety supporter for bridge
JP2500938Y2 (en) Handrail frame for scaffolding
ES2856127T3 (en) Starting cross member for a ladder access area of a scaffold system, scaffolding system with starting cross members of this type and procedure for mounting a scaffold system
ES1229659U (en) PROTECTION RAILING (Machine-translation by Google Translate, not legally binding)

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AL AM AT AU AZ BA BB BG BR BY CA CH CN CU CZ DE DK EE ES FI GB GE GH GM GW HU ID IL IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT UA UG US UZ VN YU ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GH GM KE LS MW SD SZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN ML MR NE SN TD TG

WWE Wipo information: entry into national phase

Ref document number: 1998917136

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: KR

121 Ep: the epo has been informed by wipo that ep was designated in this application
WD Withdrawal of designations after international publication

Free format text: AL, AM, AT, AU, AZ, BA, BB, BG, BY, CA, CH, CN, CU, CZ, DE, DK, EE, ES, FI, GB, GE, GH, GM, GW, HU,ID, IL, IS, JP, KE, KG, KP, KR, KZ, LC, LK, LR, LS, LT, LU, LV, MD, MG, MK, MN, MW, MX, NO, NZ, PL, PT, RO, RU, SD, SE, SG, SI, SK, SL, TJ, TM, TR, TT, UA, UG, UZ, VN, YU, ZW; AP (GH, GM, KE, LS, MW, SD, SZ, UG, ZW); EA (AM, AZ, BY, KG, KZ, MD, RU, TJ, TM); OA (BF, BJ, CF, CG, CI, CM, GA, GN, ML, MR, NE, SN, TD, TG)

WWE Wipo information: entry into national phase

Ref document number: 09462065

Country of ref document: US

AK Designated states

Kind code of ref document: C1

Designated state(s): BR US

AL Designated countries for regional patents

Kind code of ref document: C1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE

CFP Corrected version of a pamphlet front page
CR1 Correction of entry in section i

Free format text: PAT. BUL. 46/99 UNDER (81) DELETE "AL, AM, AT, AU, AZ, BA, BB, BG, BY, CA, CH, CN, CU, CZ, DE, DK, EE, ES, FI, GB, GE, GH, GM, GW, HU, ID, IL, IS, JP, KE, KG, KP, KR, KZ, LC, LK, LR, LS, LT, LU, LV, MD, MG, MK, MN, MW, MX, NO, NZ, PL, PT, RO, RU, SD, SE, SG, SI, SK, SL, TJ, TM, TR, TT, UA, UG, UZ, VN, YU, ZW, ARIPO PATENT (GH, GM, KE, LS, MW, SD, SZ, UG, ZW), EURASIAN PATENT (AM, AZ, BY, KG, KZ, MD, RU, TJ, TM), OAPI PATENT (BF, BJ, CF, CG, CI, CM, GA, GN, ML, MR, NE, SN, TD, TG)."

WWP Wipo information: published in national office

Ref document number: 1998917136

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWW Wipo information: withdrawn in national office

Ref document number: 1998917136

Country of ref document: EP